UFGS 01 57 23

View the file

Other files

File Type Posted
14r0015_amend_0005.PDF PDF
FINAL_PTO_0001_042114.xlsx XLSX spreadsheet
14r0015_amend_0004.PDF PDF
PTO_0001_rev_041814.xlsx XLSX spreadsheet
14r0015_amend_0003.PDF PDF
14r0015_amend_0002.PDF PDF
14r0015_amend_0001.PDF PDF
PTO_0001.xlsx XLSX spreadsheet
UFGS_01_30_00.pdf PDF
UFGS_01_33_00.pdf PDF
UFGS_01_14_00.pdf PDF
UFGS_01_42_00.pdf PDF
EXHIBIT_H_COMB_DAILY_QC1.PDF PDF
UFGS_01_57_19.pdf PDF
UFGS_01_45_00.pdf PDF
Exhibit_E_Surety_Form.pdf PDF
EXHIBIT_I_DBA_WD_FOR_METRO_SD_JOC.pdf PDF
Exhibit_F_RFI_Form.pdf PDF
Exhibit_D_-_Financial_Questionnaire.pdf PDF
Exhibit_B_-_PPQ.pdf PDF
UFGS_01_78_00.pdf PDF
UFGS_01_75_00.pdf PDF
Exhibit_A_-_Experience_-_Offeror.pdf PDF
Exhibit_C_-_Safety_Data_ _Narrative.pdf PDF
UFGS_01_62_35.pdf PDF
UFGS_01_78_23.pdf PDF
EXHIBIT_J_-_PTO_0001.pdf PDF
UFGS_01_20_00.pdf PDF
UFGS_01_35_26.pdf PDF
EXHIBIT_G_-_FAR_52_209-7_AND_DFARS_252_209-7999.pdf PDF
UFGS_01_50_00.pdf PDF
N62473-14-R-0015.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UFGS 01 57 23

SECTION 01 57 23

TEMPORARY STORM WATER POLLUTION CONTROL

04/08

1 PART 1 GENERAL

1.1 SUMMARY

The work consists of implementing the storm water pollution prevention measures to prevent sediment from entering streams or water bodies as specified in this Section in conformance with the requirements of Section 01

57 20.00 10 ENVIRONMENTAL PROTECTION, and the requirements of the National

Pollutant Discharge Elimination System (NPDES).

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D4439 (2011) Geosynthetics

ASTM D4491 (1999a; R 2009) Water Permeability of

Geotextiles by Permittivity

ASTM D4533 (2011) Trapezoid Tearing Strength of

Geotextiles

ASTM D4632/D4632M (2008; E 2013; R 2013) Grab Breaking Load and

Elongation of Geotextiles

ASTM D4751 (2012) Determining Apparent Opening Size of a

Geotextile

ASTM D4873 (2002; R 2009) Identification, Storage, and

Handling of Geosynthetic Rolls and Samples

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA 832-R-92-005 (1992) Storm Water Management for

Construction Activities Developing Pollution

Preventions and Plans and Best Management

Practices

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

file:///D:/Documents%20and%20Settings/bradley.CRAWFORD/My%20Documents/01%2057%2020.00%2010.doc file:///D:/Documents%20and%20Settings/bradley.CRAWFORD/My%20Documents/01%2057%2020.00%2010.doc

40 CFR 122.26 Storm Water Discharges (Applicable to State

NPDES Programs, see section 123.25)

1.3 EROSION AND SEDIMENT CONTROLS

The controls and measures required of the Contractor are described below.

1.3.1 Stabilization Practices

The stabilization practices to be implemented include temporary seeding, mulching, geotextiles, sod stabilization, vegetative buffer strips, erosion control matts, protection of trees, preservation of mature vegetation, etc.

On the daily CQC Report, record the dates when the major grading activities occur, (e.g., clearing and grubbing, excavation, embankment, and grading);

when construction activities temporarily or permanently cease on a portion of the site; and when stabilization practices are initiated. Except as provided in paragraphs UNSUITABLE CONDITIONS and NO ACTIVITY FOR LESS THAN

21 DAYS, initiate stabilization practices as soon as practicable, but no more than 14 days, in any portion of the site where construction activities have temporarily or permanently ceased.

1.3.1.1 Unsuitable Conditions

Where the initiation of stabilization measures by the fourteenth day after construction activity temporarily or permanently ceases or is precluded by unsuitable conditions caused by the weather, initiate stabilization practices as soon as practicable after conditions become suitable.

1.3.1.2 No Activity for Less Than 21 Days

When the total time period in which construction activity is temporarily ceased on a portion of the site is 21 days minimum, stabilization practices do not have to be initiated on that portion of the site until 14 days have elapsed after construction activity temporarily ceased.

1.3.1.3 Burnoff

Burnoff of the ground cover is not permitted.

1.3.1.4 Protection of Erodible Soils

Immediately finish the earthwork brought to a final grade, as indicated or specified, and protect the side slopes and back slopes upon completion of rough grading. Plan and conduct earthwork to minimize the duration of exposure of unprotected soils.

1.3.2 Erosion, Sediment and Stormwater Control

Submit "Erosion and Sediment Controls" (E&S) (form provided at the pre-construction conference) and Storm Water Inspection Reports for General

Permit to the Contracting Officer once every seven (7) calendar days and within 24 hours of a storm event that produces 0.5 inch or more of rain.

1.3.3 Stormwater Drainage

There will be no discharge of excavation ground water to the sanitary sewer, storm drains, or to the river without prior specific authorization of the

Environmental Programs Division in writing. Discharge of hazardous substances will not be permitted under any circumstances. Construction site runoff will be prevented from entering any storm drain or the river directly by the use of straw bales or other method suitable to the Environmental

Programs Division of the Shipyard. Provide erosion protection of the surrounding soils.

1.3.4 Structural Practices

Implement structural practices to divert flows from exposed soils, temporarily store flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site. Implement structural practices in a timely manner, during the construction process, to minimize erosion and sediment runoff.

1.3.5 Vegetation and Mulch

a. Provide temporary protection on sides and back slopes as soon as rough grading is completed or sufficient soil is exposed to require erosion protection. Protect slopes by accelerated growth of permanent vegetation, temporary vegetation, mulching, or netting. Stabilize slopes by hydroseeding, anchoring mulch in place, covering with anchored netting, sodding, or such combination of these and other methods necessary for effective erosion control.

b. Seeding: Provide new seeding where ground is disturbed. Include topsoil or nutriment during the seeding operation necessary to reestablish a suitable stand of grass.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Storm Water Pollution Prevention Plan

Storm Water Notice of Intent

SD-06 Test Reports file:///D:/Documents%20and%20Settings/bradley.CRAWFORD/My%20Documents/01%2033%2000.doc

Storm Water Inspection Reports for General Permit

Erosion and Sediment Controls

SD-07 Certificates

Mill Certificate or Affidavit

1.5 DELIVERY, STORAGE, AND HANDLING

Identify, store and handle filter fabric in accordance with ASTM D4873.

2 PART 2 PRODUCTS

2.1 COMPONENTS FOR SILT FENCES

2.1.1 Filter Fabric

Provide geotextile that complies with the requirements of ASTM D4439, and consists of polymeric filaments which are formed into a stable network such that filaments retain their relative positions. The filament shall consist of a long-chain synthetic polymer composed of at least 85 percent by weight of ester, propylene, or amide, and contains stabilizers and/or inhibitors added to the base plastic to make the filaments resistant to deterioration due to ultraviolet and heat exposure. Provide synthetic filter fabric that contains ultraviolet ray inhibitors and stabilizers to assure a minimum of six months of expected usable construction life at a temperature range of 0 to 120 degrees F. The filter fabric shall meet the following requirements:

FILTER FABRIC FOR SILT SCREEN FENCE

PHYSICAL PROPERTY TEST PROCEDURE STRENGTH REQUIREMENT

Grab Tensile Elongation (percent) ASTM D4632/D4632M 445 N100 lbs. min. 30 percent max.

Trapezoid Tear ASTM D4533 245 N min.55 lbs. min.

Permittivity ASTM D4491 0.2 sec-1

AOS (U.S. Std Sieve) ASTM D4751 20-100

2.1.2 Silt Fence Stakes and Posts

Use either wooden stakes or steel posts for fence construction. Wooden stakes utilized for silt fence construction, shall have a minimum cross section of 2 by 2 inches when oak is used and 4 by 4 inches when pine is used, and have a minimum length of 5 feet. Steel posts (standard "U" or "T" section) utilized for silt fence construction, shall have a minimum weight of 1.33 pounds/linear foot and a minimum length of 5 feet.

2.1.3 Mill Certificate or Affidavit

Provide a mill certificate or affidavit attesting that the fabric and factory seams meet chemical, physical, and manufacturing requirements specified above. Specify in the mill certificate or affidavit the actual

Minimum Average Roll Values and identify the fabric supplied by roll identification numbers. Submit a mill certificate or affidavit signed by a legally authorized official from the company manufacturing the filter fabric.

2.2 COMPONENTS FOR STRAW BALES

The straw in the bales shall be stalks from oats, wheat, rye, barley, rice, or from grasses such as byhalia, bermuda, etc., furnished in air dry condition. Provide bales with a standard cross section of 14 by 18 inches.

Wire-bound or string-tie all bales. Use either wooden stakes or steel posts to secure the straw bales to the ground. Wooden stakes utilized for this purpose, shall have a minimum dimensions of 2 by 2 inches in cross section and have a minimum length of 3 feet. Steel posts (standard "U" or "T" section) utilized for securing straw bales, shall have a minimum weight of

1.33 pounds/linear foot and a minimum length of 3 feet.

3 PART 3 EXECUTION

3.1 INSTALLATION OF SILT FENCES

Extend silt fences a minimum of 16 inches above the ground surface without exceeding 34 inches above the ground surface. Provide filter fabric from a continuous roll cut to the length of the barrier to avoid the use of joints.

When joints are unavoidable, splice together filter fabric at a support post, with a minimum 6 inch overlap, and securely sealed. Excavate trench approximately 4 inches wide and 4 inches deep on the upslope side of the location of the silt fence. The 4 by 4 inch trench shall be backfilled and the soil compacted over the filter fabric. Remove silt fences upon approval by the Contracting Officer.

3.2 INSTALLATION OF STRAW BALES

Place the straw bales in a single row, lengthwise on the contour, with ends of adjacent bales tightly abutting one another. Install straw bales so that bindings are oriented around the sides rather than along the tops and bottoms of the bales in order to prevent deterioration of the bindings.

Entrench and backfill the barrier. Excavate a trench the width of a bale and the length of the proposed barrier to a minimum depth of 4 inches.

After the bales are staked and chinked (gaps filled by wedging with straw), backfill the excavated soil against the barrier. Conform the backfill soil with the ground level on the downhill side and build up to 4 inches against the uphill side of the barrier. Scatter loose straw over the area immediately uphill from a straw bale barrier to increase barrier efficiency.

Securely anchor each bale by at least two stakes driven through the bale.

Drive the first stake or steel post in each bale toward the previously laid bale to force the bales together. Drive stakes or steel pickets a minimum

18 inches deep into the ground to securely anchor the bales.

3.3 FIELD QUALITY CONTROL

Maintain the temporary and permanent vegetation, erosion and sediment control measures, and other protective measures in good and effective operating condition by performing routine inspections to determine condition and effectiveness, by restoration of destroyed vegetative cover, and by repair of erosion and sediment control measures and other protective measures. Use the following procedures to maintain the protective measures.

3.3.1 Silt Fence Maintenance

Inspect the silt fences in accordance with paragraph, titled "Inspections," of this section. Any required repairs shall be made promptly. Pay close attention to the repair of damaged silt fence resulting from end runs and undercutting. Should the fabric on a silt fence decompose or become ineffective, and the barrier is still necessary, replace the fabric promptly. Remove sediment deposits when deposits reach one-third of the height of the barrier. Remove a silt fence when it is no longer required.

The immediate area occupied by the fence and any sediment deposits shall be shaped to an acceptable grade. The areas disturbed by this shaping shall receive erosion control.

3.3.2 Straw Bale Maintenance

Inspect straw bale barriers in accordance with paragraph, titled

"Inspections". Pay close attention to the repair of damaged bales, end runs and undercutting beneath bales. Accomplish necessary repairs to barriers or replacement of bales in a promptly manner. Remove sediment deposits when deposits reach one-half of the height of the barrier. At the each end of each row turn bales uphill when used to retain sediment. Remove a straw bale barrier when it is no longer required. The immediate area occupied by the bales and any sediment deposits shall be shaped to an acceptable grade.

Seed the areas disturbed by this shaping in accordance with Section 32 92 19

SEEDING.

3.3.3 Diversion Dike Maintenance

Inspect diversion dikes in accordance with paragraph, titled "Inspections," of this section. Pay close attention to the repair of damaged diversion dikes and accomplish necessary repairs promptly. When diversion dikes are no longer required, shape to an acceptable grade. Seed the areas disturbed by this shaping in accordance with Section 32 92 19 SEEDING.

file:///D:/Documents%20and%20Settings/bradley.CRAWFORD/My%20Documents/32%2092%2019.doc file:///D:/Documents%20and%20Settings/bradley.CRAWFORD/My%20Documents/32%2092%2019.doc

3.4 INSPECTIONS

3.4.1 General

Inspect disturbed areas of the construction site, areas that have not been finally stabilized used for storage of materials exposed to precipitation, stabilization practices, structural practices, other controls, and area where vehicles exit the site at least once every seven (7) calendar days and within 24 hours of the end of any storm that produces 0.5 inches or more rainfall at the site. Conduct inspections at least once every month where sites have been finally stabilized.

3.4.2 Inspections Details

Inspect disturbed areas and areas used for material storage that are exposed to precipitation for evidence of, or the potential for, pollutants entering the drainage system. Observe erosion and sediment control measures identified in the Storm Water Pollution Prevention Plan to ensure that they are operating correctly. Inspect discharge locations or points to ascertain whether erosion control measures are effective in preventing significant impacts to receiving waters. Inspect locations where vehicles exit the site for evidence of offsite sediment tracking.

3.4.3 Inspection Reports

For each inspection conducted, prepare a report summarizing the scope of the inspection, name(s) and qualifications of personnel making the inspection, the date(s) of the inspection, major observations relating to the implementation of the Storm Water Pollution Prevention Plan, maintenance performed, and actions taken. Furnish the report to the Contracting Officer within 24 hours of the inspection as a part of the Contractor's daily CQC

REPORT. A copy of the inspection report shall be maintained on the job site.

-- End of Section --