The purpose of Amendment 0004 is to incorporate the changes to the solicitation. In addition the original solicitation was posted through the Navy Electronic Business Opportunities website known as NECO however the website at www.navy.neco.mil is currently down. All solicitation/synopsis documents previously posted to NECO are available in FEDBIZOPPS. Please see attachments.

View the file

Other files

File Type Posted
RFP_N62473-13-R-4804_Contractor_Question_and_Response.docx DOCX document
REVISED_SCHEDULE_OF_SERVICES_AND_PRICE_PROPOSAL_SPREADSHEET_EXHIBITS_A-E__Amend_0008_09-16-13.xlsx XLSX spreadsheet
N62473-13-R-4804_Amend_0008.pdf PDF
N62473-13-R-4804_AMEND_0007.PDF PDF
REVISED_SCHEDULE_OF_SERVICES_AND_PRICE_PROPOSAL_SPREADSHEET_EXHIBITS_A-E__Amend_0007_09-09-13.xlsx XLSX spreadsheet
REVISED_SCHEDULE_OF_SERVICES_AND_PRICE_PROPOSAL_SPREADSHEET_EXHIBITS_A-E_09-05-13.xlsx XLSX spreadsheet
Attachment_8-HOW_TO_DO_BUSINESS_ONBOARD_SAN_CLEMENTE_ISLAND_(SOP).pdf PDF
Attachment_9_-NALFSCIINST_4620.1G_NALF_San_Clemente_Island_Barge_Shipment_Procedures.pdf PDF
Attachment_5-_Annex18_4_Amend_0006_Update_9-5-2013.docx DOCX document
Attachment_10-_NBVCINST_4650.2A.pdf PDF
N62473-13-R-4804_AMEND_0006.pdf PDF
N62473-13-R-4804_AMENDMENT_0005.pdf PDF
Attachment_1 _Q A__4_for_RFP_N62473-13-R-4804_Amendment_0005.doc DOC document
Q A__3_for_RFP_N62473-13-R-4804.doc DOC document
QUESTIONS__1_for_RFP_N62473-13-R-4804_CR_MASC_6-19-2013-Final.docx DOCX document
RFP_No._N62473-13-R-4804_PRICE_PROPOSAL_SPREADSHEET_EXHIBITS_A-E.xlsx XLSX spreadsheet
RFP_ATTACHMENT_1_-_PROJECT_DATA_SHEET.docx DOCX document
N62473-13-R-4804_AMEND_0002.pdf PDF
Attachment_5-_Annex18_4_Amend_0004_Update.pdf PDF
RFP_ATTACHMENT_3_-_PAST_PERFORMANCE_QUESTIONNAIRE_(Form_PPQ-0).docx DOCX document
RFP_ATTACHMENT_2_-_KEY_PERSONNEL_QUALIFICATIONS_SHEET_REV1__AMEND_0002.doc DOC document
RFP_ATTACHMENT_5_-_Annex_18_4_REV1_Amend_0002.doc DOC document
RFP_ATTACHMENT_7_-_PAP.docx DOCX document
RFP_N62473-13-R-4804_Amendment_0003.pdf PDF
RFP_ATTACHMENT_6_-_ZONE_MAP.BMP BMP image
N62473-13-R-4804_AMENDMENT_0001-Final.pdf PDF
RFP_ATTACHMENT_5_-_Annex_18_4.docx DOCX document
RFP_ATTACHMENT_4_-_CR_MASC_Annex_18.3.docx DOCX document
RFP_ATTACHMENT_2_-_KEY_PERSONNEL_QUALIFICATIONS_SHEET.docx DOCX document
RFP_ATTACHMENT_1_-_PROJECT_DATA_SHEET-REV1-AMEND_0002.doc DOC document
RFP_N62473-13-R-4804_CR_MASC.pdf PDF
Amendment_0004-_RFP_ATTACHMENT_7_-_PAP.pdf PDF
REVISED_SCHEDULE_OF_SERVICES_AND_PRICE_PROPOSAL_SPREADSHEET _EXHIBITS_A-E.xlsx XLSX spreadsheet
Q A__2_for_RFP_N62473-13-R-4804_AMEND_0002__6-21-13.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate changes to the solicitation as provided in the Summary of Changes commencing on page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Aug-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N62473-13-R-4804

X 9B. DATED (SEE ITEM 11)

28-May-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Aug-2013

CODE

NAVFAC SOUTHWEST

ENVIRONMENTAL CONTRACTS CORE

CODE RAQE0

1220 PACIFIC HWY

SAN DIEGO CA 92132-5190

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N62473-13-R-4804

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0004

The purpose of this amendment is to incorporate the following changes to the solicitation:

1. Change to the solicitation response date from 15 Aug 2013 to 27 Aug 2013.

2. Update to Section B, CLIN 0001.

3. Revised Attachment 5 - Annex 18.4 Pre-Established Fixed Price Work.

4. Update to Section H, Clause H1 SERVICE CONTRACT ACT WAGE DETERMINATIONS to incorporate the Dept. of Labor Service Contract Act Revised Wage Determinations applicable to this solicitation.

5. Updates to Section L, Safety and Price Factors.

6. Update to Section M, Safety and Price Factors.

7. Revised Exhibit Line Item Numbers (ELIN) Schedule of Services and Price Proposal Spreadsheets, Exhibits A-E.

8. Added Exhibit F, ELIN (F001) for Annex 18, Spec Item 3, Non Pre-Established Fixed Price Work to the Revised Schedule of Services and Price Proposal Spreadsheet as a placeholder for task orders. No price proposal is required for Exhibit F, ELIN (F001) at the basic contract level.

9. The original solicitation was posted through the Navy Electronic Business Opportunities website known as NECO, however, the website at www.navy.neco.mil is currently down. All solicitation/synopsis documents previously posted to NECO are available in FEDBIZOPPS. Please see attachments.

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 15-Aug-2013 02:00 PM to 27-Aug-2013 02:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from This is an Indefinite Delivery/Indefinite Quantity (IDIQ) acquisition with firm fixed-price Exhibit Line Item Numbers (ELINS) for services at various locations in Arizona, California, Colorado, Nevada, New Mexico, and Utah. The majority of the work is expected to be performed in California. However, on occasion work may also be performed in other locations within the continental forty-eight (48) states and will be competed under Annex 18, Spec Item 3, Non Pre-Established Fixed Price Work of the resulting contracts. The period of performance is for a base period and four one-year option periods. The aggregate value of all contracts awarded shall not exceed $50,000,000. to This is an Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award acquisition with Firm Fixed-Price Exhibit Line Item Numbers (ELINS) and Non Pre-Established Fixed Price Work for cultural resource services and ancillary supplies in accordance with (IAW) the Performance Work Statement, (Section C, Annexes 1 & 2 and Annex 18, (Spec Items 3 and 4)). Work will be performed at various locations in Arizona, California, Colorado, Nevada, New Mexico, and Utah. The majority of the work is expected to be performed in California. On occasion, work may also be performed in other locations within the continental, forty-eight (48) States under Annex 18, Spec Item 3, Non Pre- Established Fixed Price Work. Each awardee will be provided a fair opportunity to be considered for each order IAW FAR 16.505(b)(1). The period of performance is for a base year with four one-year option periods. The aggregate value of all contracts awarded shall not exceed $50,000,000.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

SERVICE CONTRACT ACT

WAGE DETERMINATIONS

The following SCA Wage Determinations are incorporated into this solicitation and will be updated with each subsequent exercise of option. The incorporated SCA Wage Determination will apply for any task orders negotiated during the applicable period.

05-2024 R17 AZ, Counties of Apache, Coconino, Gila, Maricopa, Navajo, Pinal, Yavapai

6/19/2013

05-2026 R16 AZ, Counties of Cochise, Graham, Greenlee, Pima, Santa Cruz

6/19/2013

05-2028 R16 AZ, Counties of La Paz, Yuma 6/19/2013

05-2048 R15 CA, Counties of Los Angeles, Orange 6/19/2013 05-2050 R17 CA, Counties of Monterey, San Benito 6/19/2013 05-2052 R14 CA, Counties of Alameda, Contra Costa 6/19/2013 05-2054 R15 CA, Counties of Riverside, San Bernardino 6/19/2013 05-2058 R15 CA, Counties of Imperial, San Diego 6/19/2013 05-2060 R14 CA, Counties of Marin, San Francisco, San Mateo 6/19/2013 05-2072 R16 CA, County of Ventura 6/19/2013

05-2334 R15 CA/NV, CA Counties of Lassen, Mono NV all Counties except Clark, Esmeralda, Lincoln, Nye

6/19/2013

05-2332 R15 AZ/NV, AZ County of Mohave NV Counties of Clark, Esmeralda, Lincoln, Nye

6/19/2013

05-2082 R15

CO, Counties of Adams, Arapahoe, Boulder, Broomfield, Clear Creek, Denver, Douglas, Elbert, Gilpin, Grand, Jackson, Jefferson, Logan, Morgan, Park, Phillips, Sedgwick, Summit, Washington, Weld, Yuma

6/19/2013

05-2362 R14

NM, Counties of Bernalillo, Catron, Cibola, Colfax, De Baca, Guadalupe, Harding, Los Alamos, McKinley, Mora, Rio Arriba, San Juan, San Miguel, Sandoval, Santa Fe, Socorro, Taos, Torrance, Valencia

6/19/2013

05-2532 R14 UT – Statewide 6/19/2013

05-2024 R17 AZ, Counties of Apache, Coconino, Gila, Maricopa, Navajo, Pinal, Yavapai

6/19/2013

05-2026 R16 AZ, Counties of Cochise, Graham, Greenlee, Pima, Santa Cruz

6/19/2013

05-2028 R16 AZ, Counties of La Paz, Yuma 6/19/2013 05-2048 R15 CA, Counties of Los Angeles, Orange 6/19/2013 05-2050 R17 CA, Counties of Monterey, San Benito 6/19/2013 05-2052 R14 CA, Counties of Alameda, Contra Costa 6/19/2013 05-2054 R15 CA, Counties of Riverside, San Bernardino 6/19/2013 05-2058 R15 CA, Counties of Imperial, San Diego 6/19/2013 05-2060 R14 CA, Counties of Marin, San Francisco, San Mateo 6/19/2013 05-2072 R16 CA, County of Ventura 6/19/2013

05-2334 R15 CA/NV, CA Counties of Lassen, Mono NV all Counties except Clark, Esmeralda, Lincoln, Nye

6/19/2013

05-2332 R15 AZ/NV, AZ County of Mohave NV Counties of Clark, Esmeralda, Lincoln, Nye

6/19/2013

05-2082 R15

CO, Counties of Adams, Arapahoe, Boulder, Broomfield, Clear Creek, Denver, Douglas, Elbert, Gilpin, Grand, Jackson, Jefferson, Logan, Morgan, Park, Phillips, Sedgwick, Summit, Washington, Weld, Yuma

6/19/2013

05-2362 R14

NM, Counties of Bernalillo, Catron, Cibola, Colfax, De Baca, Guadalupe, Harding, Los Alamos, McKinley, Mora, Rio Arriba, San Juan, San Miguel, Sandoval, Santa Fe, Socorro, Taos, Torrance, Valencia

6/19/2013

05-2532 R14 UT – Statewide 6/19/2013

Notice: Applicable SCA Wage Determinations for areas not specifically identified above, will be incorporated at the task order level.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

L1 - PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

1. General: Proposals submitted in response to the solicitation shall be formatted as follows and furnished in the number of copies stated herein. Any proposal submitted that does not conform to the proposal submission requirements will not be considered.

2. Offerors shall submit proposals as follows:

a. Firms shall submit proposals prepared on standard 8-1/2 x 11 inch size paper media in three-ring binders. The proposal shall also be submitted in electronic CD format compatible with Microsoft Word software and Excel spreadsheet software formats.

b. The text size shall be no less than Times New Roman, 10 point font with the exception of reproduced sections of the solicitation document, charts and graphs. Use at least 1-inch margins on the top and bottom and side margins, except for charts, graphs, maps and other illustrations.

c. Pages shall be numbered sequentially by volume. Legible tables, charts, graphs, and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans. These displays shall not exceed 11 X 17 inches in size. Foldout pages shall fold entirely within the volume, and may only be used for large tables, charts graphs, diagrams and schematics. Page limitations must be adhered to where stipulated.

d. Electronic mail (email) is not an acceptable media format.

e. Offerors shall ensure that proposal disks are virus free, and free of password protection. If access to proposal data is prohibited due to viruses, passwords, or wrong format, the proposal may be rejected.

f. Table of Contents: A master table of contents for the entire proposal and a table of contents for each volume are required. The master table of contents for the entire proposal should be filed in Volume I and will not count towards the page count.

g. Distribution: The originals shall be clearly identified as the “ORIGINAL”, and bear the original signature(s) of the offeror. The copies shall be complete and clearly identified as “COPY” or “DUPLICATE”. Offerors are advised that the proposal is “For Official Use Only” and are considered Source Selection Sensitive Information, see FAR 2.101 & 3.104 for further details. Contractors must clearly label the boxes/containers with the following information:

Solicitation Number: N62473-13-R-4804 Attn: Penny Brown, Code: AQE, BLDG 127, RM 108

h. Proposals shall be shipped/delivered to:

Naval Facilities Engineering Command, Southwest Attn: Penny Brown, Code AQE, RM 108 1220 Pacific Highway, Mailroom Bldg. 128 San Diego, CA 92132

i. Notice: Due to on-going local construction, parking limitations and security requirements, hand delivery of proposals is discouraged. However, should offerors prefer to hand deliver their proposals, they shall be delivered to the mailroom in building 128 at the address provided above.

VOLUME #1 – TECHNICAL/NON-PRICE PROPOSAL SUBMITTAL REQUIREMENTS AND FILE NAMING

CONVENTIONS

1. General Information: A cover letter shall accompany the proposal as required by FAR 52.215-01(c)(2), INSTRUCTIONS TO OFFERORS - COMPETITIVE ACQUISITION. The first page shall include the solicitation number, name, address, telephone number and facsimile number of the offeror. This page will not be included in the page count of the proposal.

VOLUME #1 - FILES NAMING CONVENTIONS:

FACTOR 1 - CORPORATE EXPERIENCE:

TAB A - RFP Attachment 1, Project Data Sheet

TAB B - Proposed legally binding subcontracting agreement, teaming agreement, partnering agreement, or joint venture agreement (If applicable)

FACTOR 2 – KEY PERSONNEL QUALIFICATIONS:

TAB A - RFP Attachment 2, Key Personnel Qualification Sheets

FACTOR 3 - PROGRAM MANAGEMENT APPROACH:

TAB A - Offeror’s organization chart

TAB B - Offeror’s Program Management Approach

TAB C - Offeror’s proposed Quality Assurance/Quality Control Program

FACTOR 4 - SAFETY:

TAB A - OSHA Total Recordable Case (TRC) Rate

TAB B - OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate or a statement that the offeror cannot submit one and why

TAB C - Technical Approach for Safety Narrative

FACTOR 5 - PAST PERFORMANCE:

TAB A - Completed CPARS evaluation, if available. If there is not a completed CPARS evaluation, RFP

Attachment 3 - Past Performance Questionnaire (PPQ)

TAB B - Offeror’s performance recognition documents, (as applicable)

VOLUME #1 - SUBMITTAL REQUIREMENTS:

FACTOR 1 - CORPORATE EXPERIENCE:

1. Submittal Requirements: Firms shall utilize the RFP Attachment 1, Project Data Sheet, for submittal of projects to be evaluated under Factor 1 - Corporate Experience. Projects not submitted on the RFP Attachment 1 will not be evaluated. Projects shall be task orders or single contracts that fit within the definition of “project” as defined herein. Do not list a master IDIQ contract as an example of a completed project. Projects submitted that do not meet the definition of a “project” will not be evaluated.

2. Project Data Sheets shall contain the following information:

a. Contract Information: Name and address, contract number and task order number; title; place of performance; award date; contract/task order type (fixed price, cost reimbursable, etc.); name and address of procuring organization, procuring organization point of contact, phone number and email address; technical or program manager’s name, phone number, and email address.

b. Cost: Project dollars; value of award, amount added by modification, and final project amount.

c. Contract Role: Specify if contract/task order was a prime contract/task order or a subcontract to a prime contract. If a subcontract, include company name, point of contact name, phone number, and email address for prime contractor.

d. Description of work performed: Offeror shall describe its primary role/duties in execution of the work (i.e. the major components of the project which were completed by the prime’s staff and major components which were subcontracted out.). If the Offeror was a subcontractor on the project, the description, duration, and cost of the work provided should reflect the work performed by the Offeror as the subcontractor, and not work under the project as a whole. Description of work performed should include, as applicable: (a) technical and administrative functions – describe the complexity of functions performed; (b) distinctive and/or unique features of the project; (c) type of action performed; (d) regulatory and stakeholder interactions; (e) summary of work accomplished and how it relates to the work required by this solicitation; and (f) provide a list of any personnel proposed to perform functions of personnel under this solicitation (see Annex 2.6.3.1), who worked on the project and what their role was on the project compared to what they will be doing under this solicitation. Provide an explanation for projects that were not completed on time.

e. Submit a fully executed copy of the proposed subcontracting agreement, teaming agreement, partnering agreement, or joint venture agreement that is legally binding to this solicitation and resulting contract (if applicable).

f. For purposes of this evaluation, a project is defined as:

1) Work performed for a federal agency and meeting at least one of the four requirements in

Paragraphs 2), 3), 4) and/or 5) below:

2) Work performed pursuant to one specific task order of an indefinite delivery/indefinite quantity

(IDIQ) type contract at one site or multiple sites at a single installation or facility; or

3) Work performed pursuant to a site-specific contract (i.e. a non IDIQ contract) for one site or multiple sites within a single installation or facility; or

4) Work performed pursuant to a single contract that is not an IDIQ contract or pursuant to one specific task order of an IDIQ type contract at multiple installations or facilities; or

5) Work performed under similar, commercial contracts or under contracts or agreements for other governmental (not federal agency) entities.

3. Proposal Limitations: The proposal for Factor 1 – Corporate Experience shall be limited to a total of 12 pages (letter 8.5”x11”).

Note: The legally binding subcontracting agreement; teaming agreement; partnering agreement, or joint venture agreement submitted with proposals (if applicable), does not apply to the total page count for this factor.

FACTOR 2 – KEY PERSONNEL QUALIFICATIONS:

1. Submittal Requirements: For purposes of evaluating Factor 2 – Key Personnel Qualifications, firms shall use RFP Attachment 2, Key Personnel Qualification Sheets for submission of Key Personnel education and experience qualifications for the following key personnel positions. Key Personnel must be current employees of the Prime contractor.

a. Key Personnel:

1) Quality Control Manager (QCM)

2) Contract Manager (CM)

3) Two (2) Principal Investigator Archaeologists (PIA) or Two (2) Principal Investigator

Historians (PIH), or one (1) PIA and one (1) PIH

2. Proposed Individuals not clearly meeting the minimum qualification requirements specified in Annex

2.6.3.1 will render the proposal unacceptable.

3. The Attachment 2, Key Personnel Qualifications Form shall provide the following information, as a minimum:

Name Current job title Name of Company Employed Dates and previous employer company name for past work experience Education (Degrees, Year, Specialization) Active Registration (Professional Registration/Certification/Licenses by Date, listing

State and Registration Number) Experience and Qualifications, including a list of any technical documents authored by the individual as a Principal Investigator or Field Director, as appropriate.

Other experience that qualifies the individual for this key position DFARS 252.203-7001 certification Signature of the proposed Key Personnel

4. Proposal Limitations: The proposal for Factor 2 – Key Personnel Qualification Forms shall be limited to

(1) one page, letter size, (8.5”x11”) for each Key Personnel proposed with a total page limit for Factor 2 of four (4) pages.

FACTOR 3 - PROGRAM MANAGEMENT APPROACH:

1. Submittal Requirements: Submit an organization chart. Demonstrate the proposed program management organizational structure, lines of authority between Key Personnel and Other (non-key) Personnel, and organizational relationships with any proposed subcontractors. Identify the designated safety, and quality control/assurance representatives.

2. Submit a Program Management Approach: Describe the approach that will be employed under the resulting contract. Address the methods of communication within the proposed organization, to include communication with the government personnel. Provide a list of office locations for the Prime, Joint Venture Partner (if applicable), and Subcontractors (if applicable).

3. Submit your proposed Quality Assurance/Quality Control Program: Describe how the quality assurance/quality control program is applied throughout the team, including team subcontractors (if applicable). Address the Principal Investigators’ responsibility with respect to final editing of and review of all deliverables, and accountability for all content, errors, and omissions.

4. Proposal Limitations:

The proposal for Factor 3 – Program Management Approach shall be limited to three (3) pages (letter 8.5”x11”). The organizational chart is not included in the three (3) page count.

FACTOR 4 - SAFETY:

1. Submittal Requirements: The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture; however, only one safety narrative is required. TRC and DART Rates shall not be submitted for subcontractors.)

a. OSHA Total Recordable Case (TRC) Rate: For the previous five (5) years (July 2008 – July 2013), submit your OSHA Total Recordable Case (TRC) Rate, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an OSHA TRC Rate, affirmatively state so, and explain why. Any extenuating circumstances that affected the OSHA TRC Rate data should be addressed as part of this element. OSHA TRC rates above 4.0, in any of the previous five years, will be considered UNACCEPTABLE, unless an adequate explanation is provided to address the extenuating circumstances that affected the rate.

b. OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate: For the previous five (5) years (July 2008 – July 2013), submit your OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an OSHA DART Rate, affirmatively state so, and explain why. Any extenuating circumstances that affected the OSHA DART Rate data should be addressed as part of this element. OSHA DART rates above 2.0, in any of the previous five years, will be considered UNACCEPTABLE, unless an adequate explanation is provided to address the extenuating circumstances that affected the rate.

c. Technical Approach for Safety: Describe the plan that the Offeror will implement to qualify, evaluate, select and oversee its potential subcontractors. Offerors must submit both (1) a plan to include the safety performance of subcontractors in the selection process for all levels of subcontractors and (2) a plan to monitor the safety of those subcontractors during contract performance, highlighting what specific management practices will be in place for providing deliberate safety program management and mishap prevention support to those sub-contractors whose TRC is greater than 4.0 and whose DART rate is greater than 2.0. Offerors who fail to submit either of these will be rated UNACCEPTABLE.

2. Proposal Limitations:

The proposal for Factor 4 – Safety shall be limited to a total of five (5) pages (letter 8.5”x11”).

1. Solicitation Submittal Requirements: IF A COMPLETED CPARS EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH THE PROPOSAL. If there is not a completed CPARS evaluation, the RFP Attachment 3 - Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1, Corporate Experience. THE OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED

CPARS IS AVAILABLE.

2. IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with the offeror’s proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (RFP Attachment 3), which will provide contract and client information for the respective project(s).

Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. Offerors shall not incorporate by reference into their proposal PPQs or CPARS that have been previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

3. Offerors may also include performance recognition documents received within the last five years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

4. In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of team members (for partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliates) identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.

5. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

VOLUME #2, PRICE PROPOSAL SUBMITTAL REQUIREMENTS AND INSTRUCTIONS

1. Solicitation Submittal Requirements: Complete the Price Proposal Exhibit Line Items A through E of the solicitation in both written and electronic (Microsoft Excel) format, displaying each proposed price and total price for base year and option years 1, 2, 3 and 4.

2. The offeror shall propose unit prices for each Exhibit Line Item Number (ELIN) on Exhibits A through E for all geographic zones for the Base Year and all Option years. This includes ELINS with no estimated quantity (e.g.

A002, Zone A on Revised Price Proposal Spreadsheet) but does not include ELINS that have both the quantity and unit price 'blacked-out' (e.g. ELIN A025, Zone G on Revised Schedule of Services and Price Proposal Spreadsheet, Exhibits A-E). ELINs with no estimated quantity and not blacked out represent work that while not estimated for any quantity at time of solicitation, has the potential to be awarded over the course of the respective period of performance. In addition, no price proposal is required for Exhibit F, ELIN (F001) for the Non-Pre-Established Fixed Price Work in Annex 18, Spec Item 3.

TAB A – Offerors shall include Standard Form (SF) 33 (Solicitation, Offer and Award), Page (1), with blocks 12-18 completed in Volume 2, under Tab A. Offerors shall include Section

B of the RFP

TAB B - Offerors shall include the Revised Schedule of Services and Price Proposal Spreadsheet, Exhibits

A-E of the RFP in both hard copy and electronic (Microsoft Excel) format in Volume 2, under Tab B

TAB C- Offerors shall include their companies’ Representations and Certifications, (Refer to Section K of the Solicitation) in Volume 2, under Tab C

3. OFFERORS SHALL SUBMIT PROPOSALS AS FOLLOWS:

a. VOLUME 1 – TECHNICAL PROPOSAL

1). Hard Copy Paper Media: One (1) Original and One (1) copy Two (2) hard copies in total

2). Electronic Media (CD): One (1) Original and Three (3) Electronic copies A total of Four (4) in CD format

b. VOLUME 2 – PRICE PROPOSAL

1). Hard Copy Paper Media: One (1) Original and One (1) copy Two (2) hard copies in total

2). Electronic Media (CD): One (1) Original Disk and One (1) Electronic Disk copy A total of two (2) Electronic media in Compact Disk MS Excel format

L2 - INQUIRIES OR QUESTIONS

1. Inquiries and questions on this Request for Proposal shall be submitted in writing electronically via email to the Contract Specialist and copy the Contract Officer. Their contact information is as follows:

Contract Specialist: Penny Brown; Email address: penny.brown@navy.mil

Contracting Officer: Beatrice Appling; Email address: beatrice.appling@navy.mil

2. All inquiries must include the solicitation number (N62473-13-R-4804), and clearly state the question(s) and reference(s).

L3 JOINT VENTURE, TEAMING/PARTNERING AND MAJOR SUBCONTRACT AGREEEMENTS

1. Contractors needing to propose legally binding subcontracting agreement, teaming agreement, partnering agreement, or joint venture agreement, shall submit their legally binding subcontracting agreement, teaming agreement, partnering agreement, or joint venture agreement with their proposal. All such agreements shall be signed by the parties and shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind them. Offerors whose proposal includes major subcontracts (subcontracts equaling or exceeding 20% of the prime contract value) shall submit signed letters of commitment from the subcontractors which define the contractual relationship and identify the participants.

SECTION M - EVALUATION FACTORS FOR AWARD

EVALUATION

A. BASIS FOR AWARD

1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contracts; to negotiate with offerors in the competitive range; and to award the contracts to the offerors submitting the lowest priced, technically acceptable offers.

2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306 (a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

3. The Lowest Price Technically Acceptable (LPTA) process is selected as appropriate for this acquisition because the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price.

4. An overall non-price factors rating must be at least “ACCEPTABLE” in order to be eligible for award. An “UNACCEPTABLE” rating in any factor results in the overall non-price factors proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price factors rating of “UNACCEPTABLE” makes a proposal ineligible for award.

EVALUATION FACTORS FOR AWARD

1. The Technical Proposal will be reviewed, evaluated and rated acceptable or unacceptable based on the five (5) technical evaluation factors. A rating of “unacceptable” under any evaluation factor will result in an “unacceptable” rating overall for the proposal.

a. The solicitation requires the evaluation of price and ‘non price” factors:

Factor 1 – Corporate Experience Factor 2 – Key Personnel Qualifications Factor 3 – Program Management Approach Factor 4 – Safety Factor 5 – Past Performance Factor 6 - Price

2. The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

BASIS OF EVALUATION FOR EACH FACTOR:

FACTOR 1 - CORPORATE EXPERIENCE:

1. Basis of Evaluation: The basis of evaluation will be focused on the firm’s relevant corporate experience in performing contracts and/or task orders of similar size, scope, and complexity to cultural resource services described in Annex 18 of the solicitation. Proposals shall clearly demonstrate relevant corporate experience within the NAVFAC Southwest Area of Responsibility, (geographical areas of Arizona, California, Colorado, Nevada, New Mexico, and Utah).

2. To demonstrate relevant corporate experience, firms shall complete RFP Attachment 1, Project Data Sheets for projects that have been completed or substantially completed (at least 80%) within the past five (5) years of the solicitation closing date. Projects must have a dollar value of at least $30,000. Corporate experience may include projects with the Federal Government, agencies of the state or local governments, and/or commercial customers for the same or similar work covered under this solicitation, but must demonstrate experience with the National Historic Preservation Act of 1966, as amended, Section 110 and/or Section 106. Projects not meeting this size, scope, and complexity criterion will not be considered relevant.

3. Firms shall clearly demonstrate their experience in performing archeological ‘or’ historic (cultural resources) investigations complying with Sections 110 and 106 of the National Historic Preservation Act of 1966, as amended.

To be determined acceptable for Factor 1, firms shall demonstrate experience in federal historic preservation in any four of the cultural resource experience areas noted below (a-h):

a. Phase I Archeological Identification Survey

b. Phase II Archaeological Site Evaluation

c. Phase III Archeological Data Recovery

d. Archeological Monitoring

e. Historic Structure Reports (HSR)

f. Built Environment Historic Resources Survey and Evaluation Investigations

g. Design Guidelines/Historic Building Maintenance Plans

h. HABS/HAER/HALS Documentation

4. Offerors shall provide four (4) completed RFP Attachment 1, Project Data Sheets that fully demonstrate the firm’s knowledge and experience for four (4) different types of cultural resource experience areas among those listed above (a-h). At least two (2) projects must have been performed in California. Projects conducted outside the geographic locations of Arizona, California, Colorado, Nevada, New Mexico and Utah will not be evaluated. All projects submitted must have been performed by the Offeror. If corporate experience is submitted by the Offeror that was performed by a subcontractor, partner, Joint Venture, or team member, their experience will only be evaluated with submission of an executed legally binding agreement with the subcontractor, partner, Joint Venture, or team member.

FACTOR 2 – KEY PERSONNEL QUALIFICATIONS:

1. Basis of Evaluation: Firms will be evaluated based on the qualifications of their proposed key personnel. The evaluation of these personnel will consider education, professional qualifications, and experience in cultural resource services. To be acceptable, the proposed key personnel qualification forms must demonstrate that the proposed individuals meet the minimum requirements specified in Annex 2.6.3.1.

2. The Contractor shall complete RFP Attachment 2, Key Personnel Qualification Sheet, for each of its key personnel. The minimum qualifications for education and experience are set forth in Annex 2.6.3.1. The following positions are considered Key Personnel and shall be employees of the prime contractor.

a) Quality Control Manager (QCM)

b) Contract Manager (CM)

c) Two (2) Principal Investigator Archaeologist (PIA) or Two (2) Principal Investigator Historian (PIH), ‘or’ at least one (1) PIA and at least one (1) PIH

3. If experience/qualifications were obtained under projects listed in RFP Attachment 1, indicate the contract and task order number. The government reserves the right to request verification of any statement in the proposed Personnel Form.

FACTOR 3 - PROGRAM MANAGEMENT APPROACH:

1. Basis of Evaluation: The basis of evaluation for Factor 3 – Program Management Approach will focus on the effectiveness of the offeror’s proposed approach to adequately perform the requirements of this solicitation. For the proposal to be determined acceptable under Factor 3, the offeror must demonstrate sound business and program management practices relating to cultural resource services. In doing so, proposals shall provide the following information:

a. Organization Chart (to include team subcontractors): The organization chart shall demonstrate the proposed program management organizational structure, lines of authority between Key Personnel and Other (non-key) Personnel, and organizational relationships with any proposed subcontractors.

Identify the designated safety, and quality control/assurance representatives.

b. Program Management Approach: Describe the approach that will be employed under the resulting contract. Address the methods of communication within the proposed organization, to include communication with the government personnel. Provide a list of office locations for the Prime, Joint Venture Partner (if applicable), and Subcontractors (if applicable).

c. Quality Assurance/Quality Control Program: Describe how the quality assurance/quality control program is applied throughout the team, including team subcontractors. This approach shall address the Principal Investigators’ responsibility with respects to final editing of and review of all deliverables, and accountability for all content, errors, and omissions.

FACTOR 4 - SAFETY:

1. Basis of Evaluation: The Government is seeking to determine whether the Offeror has an acceptable safety record.

The Government will evaluate the Offeror’s overall safety record as evidenced by the TRC and DART rates, if the Offeror’s plan includes safety in the evaluation and selection of subcontractors, and if the narrative includes a plan to monitor the safety performance of subcontractors during performance. The evaluation will collectively consider the following:

2. OSHA Total Recordable Case (TRC) Rate: The Government will evaluate the OSHA TRC Rate to determine if the Offeror’s OSHA TRC rate is above 4.0 and extenuating circumstances that impact the rates. OSHA TRC rates above 4.0, in any of the previous five years (July 2008 – July 2013), will be considered UNACCEPTABLE, unless an adequate explanation is provided to address the extenuating circumstances that affected the rate.

3. OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate: The Government will evaluate the OSHA DART Rate to determine if the Offeror’s OSHA DART rate is above 2.0 and extenuating circumstances that impact the rates. OSHA DART rates above 2.0, in any of the previous five years (July 2008 – July 2013) will be considered UNACCEPTABLE, unless an adequate explanation is provided to address the extenuating circumstances that affected the rate.

4. Technical Approach to Safety: The Government will evaluate the narrative to determine if subcontractor safety performance will be considered in the qualification, evaluation, selection, of all levels of subcontractors on the upcoming project, and both the plan to monitor the safety of those subcontractors during contract performance, highlighting what specific management practices will be in place for providing deliberate safety program management and mishap prevention support to those sub-contractors whose EMR is greater than 1.0, whose TRC is greater than 4.0 and whose DART rate is greater than 2.0. Offerors who fail to address either of these items (i.e.

whether the safety performance of subcontractors will be evaluated in the selection process for all levels of subcontractors and whether the safety of those subcontractors will be monitored during contract performance) will be rated UNACCEPTABLE.

1. Basis of Evaluation: The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:

- A pattern of successful completion of tasks;

- A pattern of deliverables that are timely and of good quality;

- A pattern of cooperativeness and teamwork with the Government at all levels

(Task Managers, Contracting Officers, Auditors, etc.);

- Recency of tasks performed that are identical to, similar to, or related to the task at hand; and

- A respect for stewardship of Government funds

FACTOR 6 - PRICE:

1. Basis of Evaluation: The Government will evaluate price in accordance with FAR 15.404 and DFARS 215.404.

Price evaluation will be based on the total price for ELINs with an estimated quantity. The offeror’s total price will be determined by multiplying the proposed unit price by the estimated quantities for each ELIN and then adding the ELINs together to calculate the total price for the base year and all option periods (See the Revised Schedule of Services and Price Proposal Spreadsheet, Exhibits A-E). The total price will not include ELINs that do not have an estimated quantity. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended price, and the total for the ELIN will be recomputed accordingly. Offerors shall ensure extended totals are accurate.

2. In addition, all proposed unit prices may be evaluated for unbalanced pricing in accordance with FAR 15.404- 1(g). Unbalanced pricing exists when, despite an acceptable total price, the price of one or more exhibit line items appear to be significantly overstated or understated as indicated by the application of price analysis techniques. An offeror’s proposal may be rejected if the Contracting Officer (CO) determines the lack of balance poses an unacceptable risk to the Government in accordance with FAR 15.404-1(g)(3).

3. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section M of the solicitation. In accordance with FAR 52.217-5, Evaluation of Options will not obligate the Government to exercise the option(s).

4. Price Analysis will be performed by utilizing one or more of the following techniques to ensure a fair and reasonable price:

a. Comparison of proposed prices received in response to the RFP

b. Comparison of proposed prices with the IGCE

c. Comparison of proposed prices with available historical information

Comparison of market survey results

(End of Summary of Changes)