This document is Amendment 0001 for Navy contract solicitation N6247026R0005, primarily addressing pre-proposal inquiries and providing clarifications for a construction project at NAS Sigonella, Italy. The amendment covers multiple aspects of the solicitation, including responses to 56 contractor inquiries about technical specifications, drawings, safety requirements, and contract terms. Key modifications include extending the proposal submission deadline to 3 February 2026, providing additional attachments such as the Italian Safety Plan, boring and CPT logs, and revised drawing sets, and updating anti-mafia documentation requirements.
The contract involves base construction work with potential options, with a base contract duration of 1,080 calendar days and a potential extended duration of 1,460 days if all options are exercised. The project appears to involve multiple facility construction elements, including telecommunications infrastructure, electrical systems, and various specialized structures. Notable clarifications include specifications about pile testing, fire protection water storage, cybersecurity scope, and compliance with Italian safety regulations. Contractors must submit comprehensive documentation, including construction experience projects, past performance information, and various certifications, with specific formatting requirements for narrative submissions.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6247026R0005
Amendment 0001
The purpose of this amendment is to provide the following:
1. Pre-Proposal Inquiries (PPIs) Responses
2. Solicitation Revisions
3. Provide Attachments
4. Revise Drawings and Specs
5. Provide Site Visit Log
1. Pre-proposal Inquiries (PPIs) Responses
1. Inquiry: The italian norms for safety in the construction sites seems not mentioned in the technical specification (Testo Unico sulla Sicurezza D.Lgs. 81/2008). Could you kindly clarify if the italian norm will apply or not for this project and if the italian PSC (piano sicurezza e coordinamento) will be issued by NAVFAC ?
Response: Please see Attachment K Piano di Sicurezza E di Coordinamento and
Attachment L – Italian Safety Plan (English), provided with this amendment.
2. Inquiry: Could you clarify the note on the drawing: "Bid Option 1: DELETE FIRE
PROTECTION WATER STORAGE TANK…". Is this note referred to any item mentioned in the Pricing Schedule ?
Response: See Attachment B Price Proposal Form (Revised), Option Item No. 1.
3. Inquiry: Unit Price for providing pile load tes: it is reported to execute nr.2 test in the pricing schedule while on drawing S-101 Drilled Shaft Plan the note 6 reports " three pile test for each magazine must be randomly selected by the Contracting Officer . Test in accordance with the specifications....". Could you kindly clarify which is the number of pile test for each building to be considered.
Response: Please see Attachment B Price Proposal Form (Revised).
4. Inquiry: Is there any additional requirements (in addition to those indicate in section 01
33 00) concerning the approval from the Contracting Officer for the subcontractors to be involved in the performance of the Contact ? Must the subcontractor be registered on
SAM.gov ?
Response: Yes, there are other subcontractor requirements in the solicitation. Please review the solicitation carefully and propose in accordance with it. Additionally, SAM.gov registration is not required for subcontractors.
5. Inquiry: Could you clarify if the crane girder and associated equipment must be included in the price or not? No technical specification seems to be included in the Attachment
E_P111_SPC_1of1.
Response: The crane girder is not solicited in this solicitation.
6. Inquiry: Could you please provide clarification on the required pavement structure for the driveable areas, and parking, including the concrete thickness and a detailed breakdown of each layer with its respective thickness? Clarification is requested regarding the use of special additives (such as quartz, corundum, or fibers) for the finishing of the yard surfaces too.
Response: Pavement thicknesses are included on the C-500 series drawings. Propose in accordance with the solicitation.
7. Inquiry: Could you please clarify whether the bunker cover berms are required to comply with slopes and profiles specified by the applicable STANAG standards?
Response: Yes. Refer to the specifications provided in the solicitation.
8. Inquiry: Clarification is requested regarding the ballistic and blast-resistance requirements for the bunker walls, including the thickness, concrete grade, and reinforcement.
Response: Refer to the drawings and specifications in the solicitation.
9. Inquiry: Information is requested regarding the extent of demolition works, including whether existing drainage channels and reinforced concrete paving are to be removed, and whether any existing utilities (water, electricity, telecommunications) are required to be preserved or restored.
Response: Refer to specifications and civil drawings for demolition requirements.
10. Inquiry: Regarding manholes and their installations—including minimum manhole dimensions, whether NAVFAC-certified prefabricated manholes are mandatory or if
European equivalents are acceptable, and whether the use of warning tapes and road reinstatement should comply with US or Italian standards—clarification is requested.
Response: European equivalents that meet the minimum requirements of the drawings and specifications are acceptable.
11. Inquiry: Regarding applicable regulations and standards, clarification is requested on which NAVFAC and NATO STANAG codes must be followed for concrete, steel, and finishes, and whether compliance with ASTM/ACI standards is required in addition to
European standards (EN/UNI).
Response: Refer to drawings and specifications for required compliance codes.
12. Inquiry: Please clarify and identify all interface works between the Base Scope and the
Options that shall be executed only if the Options are not exercised, and therefore omitted in case the Options are exercised.
Response: If options are not exercised, then all site infrastructure work listed as part of
CLIN 0001 must still be performed.
13. Inquiry: Regarding the items in the PRICE SCHEDULE for which you have provided a quantity, for example, item 1D “Unit price for providing Foundation Piling ……” with
2,136 lm, or item 1G, 2E, 3E, 4E, 5B, 5C, 5D. What will happen if the final quantity is bigger or smaller than the indicated quantity?
Response: A price adjustment for piles may be processed during construction execution in accordance with SPEC 31 63 29. Para 1.1.
14. Inquiry: In order to develop an accurately plan mobilization, scheduling, and compliance with preconstruction requirements outlined in the specifications, could you please provide the estimated date for Contract Award and Notice to Proceed (NTP)?Are there any specific prerequisites or conditions that must be fulfilled before the NTP is granted
(e.g., completion of preconstruction meeting, approval of initial submittals)?
Response: No additional information regarding an estimated contract award and notice to proceed date will be provided. Any prerequisites and conditions are included in the solicitation.
15. Inquiry: The solicitation specifies a completion time of 1,080 calendar days for the Base
Bid and 1,460 calendar days if options are awarded. However, it does not explicitly state whether the schedule should be structured as separate programs or combined.
Clarification is needed to ensure compliance with NAVFAC expectations. Please clarify the requirement for the project schedule under Section 00 21 00 and related instructions.
Should the Base CLIN (0001) and the Option CLINs (0002 through 0006) be presented as separate schedules, or should they be integrated into a single comprehensive schedule that reflects the total potential contract duration (1,460 calendar days) if all options are exercised?
Response: Contract duration is 1,080 days for the Base Bid. Award of any Option will activate an overall construction duration of 1,460 days. If no Options are awarded, the construction duration will remain 1,080 days. Review the entirety of the solicitation and propose accordingly.
16. Inquiry: Point 1.5 of this section (INSURANCE REQUIREMENTS) states that, additionally to the minimum insurance coverage required by FAR 28.307-2, the contractor must provide other insurance coverage as required by State Spanish law.
Please confirm that this is an error and it should be stated "by State Italian law" instead.
Response: See amendment detail, SPEC item 1.4.4, below.
17. Inquiry: The records of the Borings and CPT tests are so blurred that the information cannot be read. Can you provide us with a geotechnical report of sufficient quality to be readable?
Response: See amendment detail 5.13 BORING AND CPT LOGS (ATTACHMENT M –
Boring and CPT Logs)
18. Inquiry: Please, indicate what would be the scope for cibersecurity: a) during execution stage b) in the installed facilities
Response: Scope for cybersecurity is indicated in the solicitation. Please review it carefully. Some references regarding cybersecurity are included in the following divisions: Div 1, Electrical, Mechanical, Interior Signage.
19. Inquiry: Regarding the documents that must contain our proposal it is said that the offeror must submit the Required Responsibility Determination Information. We do not know which document the Client is referring to. Please could you clarify this?
Response: All documents that must be submitted are stated in solicitation section 00 21
00- Instructions, specifically 3. Evaluation Factors for Award, 3.2 Basis of Evaluation and
Submittal Requirements for each Factor, (ii) Price.
20. Inquiry: In relation to Factor 1 and Factor 4 (Attachment C and Attachment D). We are not sure where we must located them in the Tender document to submit. Because tender documents make references to all the attachments execpt those ones. Please could you clarify how we should submit these two attachments?
Response: Submittals under Factors 1 and 4 must be included in your proposal per solicitation section 00 21 00 Instructions.
21. Inquiry: Point 1 of the aforementioned title states that “Deep foundations for this structure have been designed in accordance with de recommendations in the
GEOTECHNICAL EXPLORATION REPORT, prepared by Studio Indagini and the
NAVFAC PROJECT DESIGN MEMORANDUM dated June 2023. Refer to
GEOTECHNICAL EXPLORATION REPORT and NAVFAC PROJECT DESIGN
MEMORANDUM for drilled shaft installation procedures and other details” but we do not have the two documents mentioned. Could you provide them to us?
Response: Laboratory test results, boring logs, and CPT logs are included in the drawings. Geotechnical recommendations are captured on the Geotechnical, Civil, and
Structural sheets. See Attachment M – Boring and CPT Logs.
22. Inquiry: In relation to Water Quiality Basin, could you provide us more information and details of diferent layers that compone this Basins?
Response: Provide basins in accordance with Civil drawings and specifications;
hydroseed in accordance with Landscape drawings and specifications.
23. Inquiry: We can´t find the definition (diameter, length, spacing between bars, etc) of the reinforcement of the ground slab of the BOX H in any of the drawings. Could you provide us with this information?
Response: See note 5 on Drawing S-101.
24. Inquiry: We are making every effort to advance with the preparation of our tender.
However, due to the calendar constraints and the upcoming Christmas period, it may be challenging to receive timely responses from local and international vendors, which are essential for analyzing and selecting the most competitive proposals and technical and pricing proposals. In order to submit a proposal that is consistent, reliable, and cost-effective for the benefit of the Client, we kindly request an extension of eight (8) weeks for the proposal submission deadline, until 17 March 2026. We look forward to your favorable consideration and confirmation of this extension request.
Response: The proposal submission deadline has been extended to 3 February 2026 with this amendment.
25. Inquiry: With reference to Attachment E_P111_SPC, Sec. 01 45 23.10 42, Para. 3.1, please confirm that the Contractor is required to perform the UXO Survey. In case of finding any UXO object, please confirm that the Contractor is responsible for remediation activities by issuing a variation order.
Response: Yes, the contractor is required to perform the UXO survey. See amendment detail adding Attachment L – Italian Safety Plan (English).
26. Inquiry: With reference to Attachment E_P111_SPC, Sec. 02 82 00, Para. 1.3 and 1.4, please clarify the submission and/or approval path the Contractor shall consider and/or expect regarding the Asbestos Remediation.
Response: Please refer to the specifications.
27. Inquiry: With reference to Attachment E_P111_SPC, Sec. 02 82 00, Para. 1.3 and 1.4, please specify wihich authorities shall be included in the submittal and approval processes regarding the Asbestos Remediation beside GOVT Management team assigned to this contract, if any, and specify the required time and type of documents.
Response: The solicitation provides all information the contractor needs to submit a proposal for work that includes asbestos remediation.
28. Inquiry: With reference to Attachment E_P111_SPC, Sec. 02 82 00, Para. 1.3 and 1.4, expect regarding the Lead Remediation.
proposal for work that includes lead remediation.
29. Inquiry: With reference to Attachment E_P111_SPC, Sec. 02 82 00, Para. 1.3 and 1.4, please specify wihich authorities shall be included in the submittal and approval processes regarding the Lead Remediation beside GOVT Management team assigned to this contract, if any, and specify the required time and type of documents.
proposal for work that includes lead remediation.
30. Inquiry: With reference to Attachment E_P111_SPC, Sec. 02 82 00, Para. 1.3 and 1.4, expect regarding handling of Lighting Ballasts and Lamp Containing PCBs and Mercury.
proposal for work that includes handling of lighting ballasts and lamps containing PCBs and Mercury.
31. Inquiry: With reference to Attachment E_P111_SPC, Sec. 02 82 00, Para. 1.3 and 1.4, please specify wihich authorities shall be included in the submittal and approval processes regarding handling of Lighting Ballasts and Lamp Containing PCBs and
Mercury beside GOVT Management team assigned to this contract, if any, and specify the required time and type of documents.
proposal for work that includes handling of lighting ballasts and lamps containing PCBs and Mercury.
32. Inquiry: Please provide the Basis Of Design (BOD) of this project.
Response: Basis of Design is not provided.
33. Inquiry: With reference to Attachment F_P111_DWG_3of6, DWG sheets S104 and
S104T, please clarify whether the slab reinforcement schedule refers ONLY to the upper reinforcement or it also includes the lower reinforcement. If it is the second case, please confirm that the number of bars indicated in the tables (North-South, East-West) represents the sum of the upper and lower reinforcing bars.
Response: Slab reinforcement refers to top and bottom bars.
34. Inquiry: Please provide missing information regarding the steel profiles of the purlins and the edge beam at wires 4 and 2.
Response: Refer to drawing section C1/S302B.
35. Inquiry: With reference to following documents: (1) Solicitation, Offer and Award
N6247026R0005, Sec. 00 10 00, Option line Item 0006; (2) Attachment B_Price
Schedule, Line Item 0006; and (3) Attachment E_P111_SPC, Sec. 12 00 01.00 20 Para.
1.3.1; there is a substantial discrepancy in the description of FF&E provision. First, the price schedules (ref. doc. 1 and 2) focus solely on work related to labor, materials, and supervision, excluding other line items. In contrast, Attachment E_P111_SPC, Sec. 12 00
01.00 20 includes specific additional costs such as shipping, handling, design fees, taxes, bond fees, and a percentage applied to the total FF&E costs. Please clarify the detailed additional costs that the Contractor should consider when preparing the HAR for the BID
Option for FF&E.
Response: Refer to specification 12 00 01.00 20.
36. Inquiry: Please provide a breakdown of the $241,752 estimated price for Option Item
No. 5. Please specify what costs are included in the estimation (e.g. shipping costs, handling, design fees, taxes, furniture, equipment, etc.).
Response: Refer to specification 12 00 01.00 20.
37. Inquiry: Please provide details regarding the roof system required to be provide at
AROS Building.
Response: Refer to specifications and drawings for the AROS facility provided in the solicitation.
38. Inquiry: Please confirm whether it is appropriate to provide walls and roof of the two (2)
Navy MSM warehouses using cast-in-place concrete, rather than the precast concrete panels specified in the reference design, ensuring the same physical and mechanical properties and performances (e.g., thicknesses, mechanical property strength requirements, mix design and other relevant specifications described in the existing design documentation).
Response: No deviation from the solicitation is permitted.
39. Inquiry: To accommodate transportation and installation constraints, please confirm whether it is acceptable to supply modular prefabricated panels for the two (2) Navy
MSMs with different dimensions than those specified in the design documentation, ensuring that the joint details shown in the original design remain unchanged and are appropriately adjusted to the new panel dimensions.
Response: No deviation from the solicitation is permitted.
40. Inquiry: Please provide Italian Safety Plan (Piano di Sicurezza e Coordinamento).
Response: See Attachment L – Italian Safety Plan (English).
41. Inquiry: With reference to Attachment E_P111_SPC, sec. 01 14 00, para. 1.3.2, please confirm that the working hours between 8:00 and 16:30, Monday to Friday (excluding public holidays) represent the actual time period for working activities rather than the maximum possible daily access to the construction site.
Response: Confirmed.
42. Inquiry: With reference to the solicitation regarding the Construction experience (Non price factors - Factor 1), could you please indicate the minimum number of experiences to include in the Non-Price portion of the Offer.
Response: The minimum number of projects is one.
43. Inquiry: With reference to the solicitation, on page 1/47 the contract duration is 1080 days, while the contract duration indicated in section 00 20 00 paragraph 2.2.3 "[...]
EXAMPLE OF A PERFORMANCE GUARANTEE ISSUED BY A BANK […]" is 925 days. Please clarify which contract duration is correct.
Response: Contract duration is 1,080 days for the Base Bid. If options are exercised, then the contract duration will be 1460 days.
44. Inquiry: After carefully analyzing the design (drawings and specifications), we noticed that many dimensions were abruptly converted from the US customary system of measurement to the International System of Units (SI), creating measurements with numerous decimal extensions (even to mm), which could prove very difficult to construct. Could you please reissue the design drawing with the correct measurements and/or instruction for rounding?
Response: Standard size available materials may be submitted for approval during construction and may or may not be approved.
45. Inquiry: With reference to the Attachment E_P111_SPC, section 08 39 55.00 20 para.
1.1, could you please provide the UNI/EN/ISO/CEI standards equivalent to the US standards given in the specification text regarding the explosion-proof door system?
Response: Please see amendment detail in Attachment E_P111_SPC_SECTION 08 39
55.00 20.
46. Inquiry: Can you please provide more clarification regarding the page limitations stated in the solicitation letter regarding the narrative (Non price factors - Factor 3). Given that the narrative is limited to three (3) double-sided pages or six (6) single-sided pages, could you confirm if these six (6) pages refer exclusively to the written narrative, or if they must also include any tables, figures, or other supporting graphics?
Response: The narrative is limited to six (6) single-sided pages, including tables, figures and other graphics.
47. Inquiry: Can you please provide more clarification regarding the page limitations stated in the solicitation letter regarding the Gantt chart (Non price factors - Factor 3). Given that the Gantt chart may be submitted on 11" x 17" or A3 page(s) and will not count against the narrative page limitation, but is limited to three (3) double-sided pages or six
(6) single-sided pages; could you confirm if this is a separate allowance in addition to the narrative pages?
Response: Narrative shall not exceed three (3) double-sided pages or six (6) single-sided pages. In addition, provide schedule Gantt chart to graphically present the contract duration. The Gantt chart may submitted on 11" x 17" or A3 page(s) that will not count against the page limitations for the narrative but is limited to three (3) double-sided pages or six (6) single-sided pages.
48. Inquiry: Can you please provide more clarification regarding the format for the narrative
(Non price factors - Factor 3). Is there any prescribed format for the narrative (e.g., text only), or can we include diagrams and tables within the six-page limit?
Response: Text, diagrams, tables and other graphics are allowed within the six page limit.
49. Inquiry: There is conflicting information for Option 1, as stated on drawings CU105A, C-510, G101, F001, FA101, FA601, FX401. Drawings CU105A, C501, FA601, and
FX401 show the absence of the fire water tank in Option 1, however FA101, note 3 states to monitor the storage tank level. Additionally, Option Item No. 1 in the CLIN schedule does not state anything about removing the fire water tank. Please clarify what is included in Option 1, and if we should price our estimate according to the CLIN schedule, or the drawings in regards to this.
Response: See Attachment B Price Proposal Form(Revised) provided in amendment.
50. Inquiry: Please provide Attachments G and H for the Anti Mafia Self Certification
Forms in English.
Response: Please propose in accordance with the solicitation.
51. Inquiry: Section 00 21 00 - Instructions, Section 3.2 (ii) states the submission shall include: -Copy of Representation and Certifications from System for Award
Management (SAM); -Completed Solicitation Representations and Certifications
(Attachment I) (Note: Some of these certification provisions/clauses may not be included in SAM, offerors are cautioned to closely review and separately provide completed certifications in response to these full text provisions/clauses) The solicitation also includes Section 00 45 00 - Representations and Certifications. Please clarify whether offerors must also complete Section 00 45 00.
Response: All required representations and certifications must be fully completed pursuant to the solicitation instructions.
52. Inquiry: Is all the site infrastructure for all the H-Boxes along with rough building pad grading for such to be completed as part of CLIN 1?
Response: Complete all site infrastructure as part of CLIN 1.
53. Inquiry: The RFP requires a SOA OS 21-VIII and states that it represents 30% of the work. Is this requirement for the Concrete Substructure and Superstructure scope?
Response: Please see solicitation item 2.1.8 Certificate of Classification.
54. Inquiry: Section 00 21 00 - Instructions, Section 3.2 (ii) states the submission shall include 12-point font, Times New Roman for the narrative. Can offerors use a smaller font size, such as 10pt, for tables and graphics so long as it is still legible for Government reviewers?
Response: No. All offerors must propose in accordance with the solicitation instructions.
55. Inquiry: How many bars of pressure should the Blast Resistan Doors withstand against a potential explosive charge? We have consulted UFC_ 4_420_01_2025 and couldn't find the specific data, nor in the specifications.
Response: All requirements for the blast resistant doors are stated in the solicitation. The doors do not need to meet any requirements beyond those stated in the solicitation.
56. Inquiry: Please confirm if the Brigde Crane is provides by others. Have we only considerate in our estimation the necessary auxiliaries elements to install this bridge, is it that?
Response: Bridge Crane will be provided by others.
2. Solicitation Revisions
Current:
5. ATTACHMENTS: Will be located on Contract Opportunities under additional documents.
5.1 PRE-PROPOSAL INQUIRY FORM (ATTACHMENT A)
5.2 SCHEDULE B PRICE PROPOSAL FORM (ATTACHMENT B)
5.3 PAST PERFORMANCE QUESTIONNAIRE (ATTACHMENT C)
5.4 CONSTRUCTION EXPERIENCE PROJECT DATA SHEET (ATTACHMENT D)
5.5 SPECIFICATIONS (ATTACHMENT E)
5.6 DRAWINGS (ATTACHMENT F) (6 TOTAL)
5.7 ANTI MAFIA SELF CERTIFICATION FORM FOR CONTRACTS GREATER THAN
5,382,000 EURO (ATTACHMENT G)
5.8 ANTI MAFIA SELF CERTIFICATION FORM FOR CONTRACTS BETWEEN 150,000
AND 5,382,000 EURO
(ATTACHMENT H)
5.9 REPRESENTATIONS AND CERTIFICATIONS (ATTACHMENT I)
5.10 SITE VISIT LOG NAS SIGONELLA (ATTACHMENT J)
Revised:
5.ATTACHMENTS: Will be located on Contract Opportunities under additional documents.
5.1 PRE-PROPOSAL INQUIRY FORM (ATTACHMENT A)
5.2 SCHEDULE B PRICE PROPOSAL FORM (ATTACHMENT B)
5.3 PAST PERFORMANCE QUESTIONNAIRE (ATTACHMENT C)
5.4 CONSTRUCTION EXPERIENCE PROJECT DATA SHEET (ATTACHMENT D)
5.5 SPECIFICATIONS (ATTACHMENT E)
5.6 DRAWINGS (ATTACHMENT F) (6 TOTAL)
5.7 ANTI MAFIA SELF CERTIFICATION FORM FOR CONTRACTS GREATER THAN
5,382,000 EURO (ATTACHMENT G)
5.8 ANTI MAFIA SELF CERTIFICATION FORM FOR CONTRACTS BETWEEN 150,000
AND 5,382,000 EURO
(ATTACHMENT H)
5.9 REPRESENTATIONS AND CERTIFICATIONS (ATTACHMENT I)
5.10 SITE VISIT LOG NAS SIGONELLA (ATTACHMENT J)
5.11 PIANO DI SICUREZZA E DI COORDINAMENTO – (ATTACHMENT K)
5.12 ITALIAN SAFETY PLAN – ENGLISH (ATTACHMENT L)
5.13 BORING AND CPT LOGS (ATTACHMENT M)
5.14 SITE VISIT LOG (ATTACHMENT N)
Current
2.2.1 ANTI-MAFIA LAW:
Pre-Award Effect of Anti-Mafia Procedures: In as much as the work of this solicitation is to be performed on land owned by the Italian State, the prospective Contractor will be subject to all
Italian legislation concerning anti-mafia documentation, including, without limitation:
Legislative Decree no. 159 of September 6, 2011 (hereinafter "the code"), Decree of the
President of the Republic no. 252 of June 3, 1998, Legislative Decree no. 490 of August 8, 1994, Law Decree No. 629 of September 6, 1982, and any subsequent anti-mafia laws, integrations and amendments. Only firms that submit the requested documentation will be considered for award.
In the event that prior to award any mafia infiltration attempt is determined by the competent
Prefect (Prefetto) against an offeror, pursuant to Art. 4 of Legislative Decree no. 490/1994, Art.
10 of Decree of the President of the Republic no. 252/1998, or any other antimafia law, no award will be made to said offeror. Furthermore, in the event that prior to award any additional information against an offeror is obtained and validated by the Government or provided by the competent Prefect (Prefetto) pursuant to Art. 1, Section 7 of Law decree 629/1982, Art. 10, paragraph 9, of Decree of the President of the Republic no. 252/1998, or any other antimafia law, the Government may decide, at its sole discretion, that no award will be made to said offeror.
Subcontractors: ALSO, the offeror is responsible for making sure that also its subcontractors comply with Italian Anti-Mafia laws, and request them to submit the required self-certifications.
The offeror agrees to provide the Government any appropriate documentation that may indicate mafia-collusion, to include, if available, results of any Prefect (Prefetto) investigations. If after award, a competent Prefect (Prefetto) determines that mafia infiltration attempts have occurred with a subcontractor, then the offeror agrees, if requested by the Government, to promptly terminate the subject subcontract and replace the mafia-colluded subcontractor at its own cost with a compliant company.
Termination: If during the life of this contract, any mafia infiltration attempt is determined by the
Government to have occurred or additional information is provided by the Prefect (Prefetto) against any component of the Contractor or any Subcontractor, pursuant to the Code and/or any other anti-mafia legislation as applicable, the Government at its sole discretion may consider this a failure to execute the work and may terminate the Contractor's right to proceed with the work under the "Default" clause of this contract.
Documentation Requirements: Contractor shall submit the following:
The offeror SHALL include a self-certification in accordance with DPR 445/2000, to certify that pursuant to any applicable anti-mafia law in force, none of the causes of forfeiture, suspension or prohibition set forth by Art. 67 of the Code exist with regard to all the persons involved in the subject contract. The offeror shall complete and submit the applicable self-certification forms
(Attachment G and Attachment H).
Also, if an offeror is registered on the applicable Prefect's Office White List, then it shall provide the pertinent documentation.
Revised
1. The United States is committed to ensuring that all Government contracts with performance in Italy remain free from infiltration or other influence by the Mafia. To that end, and in accordance with Italian Legislative Decree 159/2011 as amended, all offerors shall submit with their proposals a completed self-certification known as the “Comunicazione Antimafia” or
“Informazione Antimafia” depending on the value of the contract. For contracts valued at less than the applicable European Community monetary threshold for defense contracts, contracts shall submit a completed “Comunicazione Antimafia” self-certification form. See Attachment G.
The applicable threshold for construction contracts for 2023 is €5,382,000, and the applicable threshold for supply and service contracts is €431,000. For contracts valued at more than the applicable European Community monetary threshold for defense contracts, contractors shall submit a completed “Informazione Antimafia” self-certification form. See Attachment H.
2. In addition, prior to submitting a proposal, all offerors shall initiate registration in the
“White List” with the Prefect (Prefetto) where their company is legally registered. The offeror shall submit proof with its proposal that it has initiated or accomplished the “White List” registration procedures. For non-Italian offerors who do not have a registered office in Italy, the offeror shall initiate registration on the “White List” with the Prefect (Prefetto) where the work will be performed.
3. The contractor is subject to Anti-Mafia screening prior to award and throughout the life of the contract. In the event that, prior to award, the Government discovers and Mafia-related indications or infiltration with respect to the offeror, the offeror will be considered non-responsible and will not be eligible for award.
4. Further, if during the life of the contract, the Government learns of any Mafia-related indications or infiltration against the contractor, the Government will consider this to be a failure to execute the work and may terminate the contract under the “Default” clause of the contract.
5. The contractor shall ensure that these Anti-Mafia provisions are included in any subcontracts and that the same Anti-Mafia provisions applicable to the prime contractor apply to its subcontractors. If during the life of this contract, the Government learns of any Mafia-related indications or infiltration against any subcontractor at any tier, the contractor agrees, if requested by the Government, to promptly terminate the subject contract and replace the Mafia-colluded subcontractor at its own cost with a compliant company.
Documentation Requirements: Contractor shall submit the following:
The offeror SHALL include a self-certification in accordance with DPR 445/2000, to certify that pursuant to any applicable anti-mafia law in force, none of the causes of forfeiture, suspension or prohibition set forth by Art. 67 of the Code exist with regard to all the persons involved in the subject contract. The offeror shall complete and submit the applicable self-certification forms
(Attachment G and Attachment H).
Also, if an offeror is registered on the applicable Prefect's Office White List, then it shall provide the pertinent documentation.
3. Provide Attachments
Attachment B Price Proposal Form (Revised)
Attachment K Piano di Sicurezza E di Coordinamento
Attachment L – Italian Safety Plan (English)
Attachment M – Boring and CPT Logs
Attachment F_P111_DWG_2of6 (revised)
Attachment F_P111_DWG_3of6 (revised)
Attachment F_P111_DWG_4of6 (revised)
Attachment F_P111_DWG_5of6 (revised)
Attachment F_P111_DWG_6of6 (revised)
Attachment E_ P111_SPC_SECTION 08 39 55.00 20
Attachment N – Site Visit Log
4. Revise Drawings and Specs
DRAWINGS:
NAVFAC DWG NO. 14134094 (S-001) GENERAL STRUCTURAL NOTES
Drilled Shafts Note 1: DELETE the sentence “Refer to Geotechnical Report and NAVFAC
Memorandum for Drilled Shaft Installation Procedures and Other Details.”
REPLACE the following drawings to the DRAWING INDEX under the corresponding discipline and drawing number. These drawings accompany the Amendment:
ATTACHMENT F _P111_DWG_2of6:
ES107 [NAVFAC DWG NO. 14134068] ELECTRICAL SITE PLAN - REPLACED SHEET
ES108 [NAVFAC DWG NO. 14134069] ELECTRICAL SITE PLAN - REPLACED SHEET
TS106 [NAVFAC DWG NO. 14134081] TELECOMMUNICATIONS SITE PLAN – REPLACED SHEET
TS107 [NAVFAC DWG NO. 14134082] TELECOMMUNICATIONS SITE PLAN – REPLACED SHEET
TS108 [NAVFAC DWG NO. 14134083] TELECOMMUNICATIONS SITE PLAN – REPLACED SHEET
ATTACHMENT F_ P111_DWG_3of6:
T-101 [NAVFAC DWG NO. 14134166] TELECOMMUNICATIONS FLOOR PLAN – REPLACED SHEET
T-601 [NAVFAC DWG NO. 14134168] TELECOMMUNICATIONS AND SECURITY RISER – REPLACED
SHEET
ATTACHMENT F_P111_DWG_4of6:
E101A [NAVFAC DWG NO. 14134205] LEGEND, SYMBOLS, ABBREVIATIONS AND GENERAL NOTES –
REPLACED SHEET
E210A [NAVFAC DWG NO. 14134207] ELECTRICAL PLAN WITHOUT AC – REPLACED SHEET
E310A [NAVFAC DWG NO. 14134208] LIGHTNING PROTECTION AND GROUNDING ISOMETRIC –
E312A [NAVFAC DWG NO. 14134210] LIGHTNING PROTECTION AND GROUNDING DETAILS –
ATTACHMENT F_P111_DWG_5of6:
E001B [NAVFAC DWG NO. 14134302] LEGENDS, ABBREVIATIONS AND GENERAL NOTES - AROS –
TY101B [NAVFAC DWG NO. 14134319] TELECOMMUNICATIONS PLAN – AROS – REPLACED SHEET
ATTACHMENT F_P111_DWG_6of6:
E001C [NAVFAC DWG NO. 14147714] LEGENDS, ABBREVIATIONS AND GENERAL NOTES – FORKLIFT
CHARGING – REPLACED SHEET
E101C [NAVFAC DWG NO. 14147715] ELECTRICAL PLAN – FORKLIFT CHARGING STATION –
E503C [NAVFAC DWG NO. 14147718] LIGHTNING PROTECTION & GROUNDING DETAILS – FORKLIFT
CHARGING – REPLACED SHEET
SPECIFICATIONS:
PROJECT TABLE OF CONTENTS
DOCUMENT 00 01 15 LIST OF DRAWINGS
1.2 Contract Drawings
DELETE and REPLACE the following drawings .
DRAWING REV. NAVFAC TITLE
NO. NO. DWG NO.
ES107 1 14134068 ELECTRICAL SITE PLAN
ES108 1 14134069 ELECTRICAL SITE PLAN
TS106 1 14134081 TELECOMMUNICATIONS SITE PLAN
TS107 1 14134082 TELECOMMUNICATIONS SITE PLAN
TS108 1 14134083 TELECOMMUNICATIONS SITE PLAN
T-101 1 14134166 TELECOMMUNICATIONS FLOOR PLAN
T-601 1 14134168 TELECOMMUNICATIONS AND SECURITY RISER
E101A 1 14134205 LEGEND, SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
E210A 1 14134207 ELECTRICAL PLAN WITHOUT AC
E310A 1 14134208 LIGHTNING PROTECTION AND GROUNDING ISOMETRIC
E312A 1 14134210 LIGHTNING PROTECTION AND GROUNDING DETAILS
E001B 1 14134302 LEGENDS, ABBREVIATIONS AND GENERAL NOTES - AROS
TY101B 1 14134319 TELECOMMUNICATIONS PLAN – AROS
E001C 1 14147714 LEGENDS, ABBREVIATIONS AND GENERAL NOTES –
FORKLIFT CHARGING
E101C 1 14147715 ELECTRICAL PLAN – FORKLIFT CHARGING STATION
E503C 1 14147718 LIGHTNING PROTECTION & GROUNDING DETAILS –
FORKLIFT CHARGING
DOCUMENT 01 30 00 ADMINISTRATIVE REQUIREMENTS
DELETE and REPLACE the entire specification section
1.5 Insurance Requirements
DELETE the word “Spanish” and REPLACE with “Italian”
DOCUMENT 01 78 24.00 20 FACILITY ELECTRONIC OPERATIONS AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
1.4.4 Final eOMSI SUBMITTAL TRANSLATION
DELETE the word “Spanish” and REPLACE with “Italian”