About this file

This amendment modifies a solicitation for professional services to support the Navy's Mission Assurance program. The services include performing all-hazard threat assessments, mission analyses, mission assurance assessments, utility security assessments, critical asset management training, and critical infrastructure protection reviews. Offerors must submit separate sealed price and non-price proposals by 2:00 PM on March 26, 2024. Price proposals shall include fully burdened labor rates and travel cost markups. Non-price proposals are limited to 50 pages and will be evaluated on corporate experience, technical approach, safety record, small business utilization, and past performance. At least three recent and relevant projects over $800,000 in size and scope are required to demonstrate corporate experience. The amendment provides clarification on response requirements and evaluation criteria.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N6247023R9006: PROFESSIONAL SERVICES FOR MISSION ASSURANCE ASSESSMENT OF INSTALLATION/FACILITIES INFRASTRUCTURE AND FACILITY-RELATED CONTROL SYSTEMS (FRCS) FOR THE DEPARTMENT OF THE NACY (CON), WORLDWIDE

This amendment is issued to provide a revision to Section L.

(SEE CONTINUATION PAGE)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Mar-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247023R9006

X 9B. DATED (SEE ITEM 11)

13-Mar-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Mar-2024

CODE

COMNAVFACSYSCOM ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247023R9006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

The purpose of this amendment is to disseminate the below information.

1. Section L – – Revision made to item L.2, see note below.

NOTE: Revisions are provided by the use of red font; deletions are indicated by the use of red strikethrough font.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

SECTION L

L.1 SUBMITTING YOUR PROPOSAL

Proposals must be submitted via express mail carriers to the address immediately below this paragraph; NO HAND

OR ELECTRONIC DELIVERY OF PROPOSALS WILL BE ACCEPTED.

Proposal Delivery Address:

Naval Facilities Engineering Systems Command (NAVFAC), Atlantic Attn: Barkley Brown, Code CON36 Building A – Mail Room 6506 Hampton Blvd Norfolk, Virginia 23508-1278

The signature of the Offeror provided in Box 17 of the SF33 agrees, if this offer is accepted within 180 calendar days from the date of receipt of offers specified as the due date in Box 9 of the SF33 or any extended due date, to furnish any or all items upon which the prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

Annotate solicitation number N6247023R9006 on the bottom of the envelope or box. Proposals must be received and date stamped at the stated address above no later than the date and time identified in block 9 on the SF33.

Express mail carriers Security Information:

Commercial couriers such as FEDEX, DHL, or UPS must follow visitor procedures and are required to have a background check if they do not have a CAC badge. Commercial couriers must also have their vehicle inspected following LRA commercial vehicle inspection procedures prior to accessing the LRA. The Commercial Vehicle Inspection location for vehicles coming to NAVFAC Atlantic on the Lafayette River Annex (LRA) is located at Naval Support Activity (NSA) Hampton Roads at the Meredith Street gate off of Terminal Boulevard.

Firms should check with their intended courier to ensure they have the proper identification credentials to access the

LRA.

DBIDS passes must be picked up by the approved visitor from the Naval Station Pass and ID Office located at the following address prior to visiting NAVFAC Atlantic on LRA:

Naval Station Pass and ID Office 9040 Hampton Blvd Building #CD9 Norfolk, VA 23505 Telephone Number: 757-322-2975 Hours of Operation: 0700 – 1530 Monday through Friday

NOTE: This is not the address for proposal delivery. Proposals mailed to this address may not be received by NAVFAC prior to the deadline.

All potential Offerors must adhere to this notice in order to avoid delay in submitting your proposal. The level of security at Lafayette River Annex may change at any time. As the level of security heightens, the amount of time required to gain access to the Lafayette River Annex also increases.

L.2 PRE-AWARD INQUIRIES/REQUEST FOR PROPOSALS (RFP) INFORMATION/

CLARIFICATIONS/QUESTIONS

Contractors are required to review the entire solicitation package before submitting questions. Submit all questions via one document using Attachment J-6, Pre-award Inquiry Form, by E-mail to Barkley Brown (barkley.k.brown.civ@us.navy.mil) no later than no later than 2:00 P.M. Norfolk, VA local time on 18 26 MARCH 2024. The Government does not intend to respond to any pre-proposal inquiries submitted after 2:00 P.M. Norfolk, VA local time on 26 MARCH 2024 order to permit adequate time to reply to the inquiries. This is the most efficient way to ensure all questions are addressed in a timely manner.

L.3 REQUEST FOR PROPOSAL (RFP) FILES

Solicitations are posted to the Opportunities (https://www.sam.gov) website. By necessity, these files are protected to prevent unauthorized editing. It is the sole responsibility of the Offeror to obtain the RFP files, along with any amendments, from the Opportunities Website.

L.4 GENERAL PROPOSAL REQUIREMENTS

The price proposal and non-price proposals shall be submitted in separate three-ring binders and tabbed appropriately. Binders must be marked as “Volume I: Price Proposal” and “Volume II: Non-Price Proposal”. Should there be a discrepancy between paper and electronic information, the paper copies shall govern.

Elaborate brochures or other presentations beyond that sufficient to present a complete and effective proposal are not desired. Elaborate artwork and expensive visual or other presentation aids are not necessary. Organization, clarity, accuracy of information, relevance, and completeness are of prime importance.

L.5 EVALUATION FACTORS

1. The solicitation requires the evaluation of price and the following non-cost/price factors:

Factor 1 - Corporate Experience Factor 2 - Technical/Management Approach Factor 3 - Safety Factor 4 - Small Business Utilization and Participation Factor 5 - Past Performance

The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

2. The relative order of importance of the non-price evaluation factors is the technical factors, Factors 1, 2, 3, and 4, are of equal importance to each other and, when combined are equal in importance to the past performance evaluation/performance confidence assessment factor, Factor 5. When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-cost/price evaluation factors) are approximately equal to price.

The importance of price will increase if the Offerors’ non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.

3. Basis of Evaluation and Submittal Requirements for Each Factor.

L.6 PRICE AND NON-PRICE PROPOSAL SUBMITTAL REQUIREMENTS

(a) Volume I — Price Proposal:

(1) Solicitation Submittal Requirements: Submit one (1) “Original” and two (1) copies of the price proposal in three-ring binders clearly marked as the Price Proposal. Non-price proposals shall be submitted on 8 ½ x 11 paper with a font no smaller than 10 point. In addition to providing hard copies of the price proposal offerors shall provide one (1) electronic copies of the price proposal on a non-rewritable CD in Microsoft Office Excel format and shall be Microsoft Office Version 2016 compatible. Offerors are advised that, in the event of a discrepancy between pricing information contained on the CD and the hard copy proposal, the original hard copy will govern. There is no page limit for Volume 1. Each copy of the price proposal shall include a separate tab for each item specified below:

Tab A. Identify the Company profile to include, the Offeror’s name, address, names of two (2) points of contact (including title, phone number and email address), the Unique Entity ID (UEI) Number and CAGE code;

Tab B. Completed and signed Standard Form 33 (SF-33)

Tab C. Acknowledgement of all solicitation amendment(s) (SF-30’s) related to this RFP.

Tab D. CONTRACTOR PROPOSAL CERTIFICATION:

____________________________________________ (Name of Offeror) warrants that its proposal _____________________________ (of date or other identifier) incorporated herein by reference, including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives set forth in this contract during the execution thereof. The contractor is not excused from meeting such performance objectives in the event such proposal proves inadequate as conceived or executed to meet such performance objectives. The contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objectives.

Tab E. Representations and Certifications (ref: https://www.sam.gov).

Tab F. Any offeror proposing as a partnership, joint venture, other teaming arrangement, or resource of a parent company/subsidiary/affiliate shall submit the following information:

i. Provide a listing of the team members’ corporate name (no abbreviations), address, point of contact, phone number, UEI Number, and CAGE Code.

ii. Submit signed letters of commitment from the team members. The commitment letter shall clearly identify the expected relationship, role and responsibility of the team member.

iii. If proposing as a Joint Venture, submit a signed copy of the Joint Venture Agreement.

When proposing as a joint venture, all members of the joint venture shall sign the SF33 unless a written agreement by the joint venture is furnished with the proposal designating that one firm with the authority to bind the other member(s) of the joint venture. In addition, a signed copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirement may eliminate the proposal from further consideration. If the joint venture is subject to the SBA Mentor-Protégé Program, a copy of the SBA approval of the joint venture arrangement shall be included. In addition, Joint Ventures shall specify if they are populated or unpopulated.

Tab G. Completed Attachment B- Schedule of Services for the base and all option years in U.S. Dollars.;

Note: Firm fixed-price task orders will be negotiated for the services required under this contract using the fully burdened labor rates and percent mark-ups for travel and other direct costs proposed under Attachment B- Schedule of Services, for the base year and each option year (if exercised). However, the quantities listed in Attachment B- Schedule of Services are estimates only and will not be ordered with the award of the basic contract. Actual quantities ordered over the duration of the contract are expected to vary and are not limited to those estimated in Attachment B- Schedule of Services of Services and shall not exceed the total contract not-to-exceed amount of $95,000,000.00 (base period and all option years).

Attachment B- Schedule of Services shall be completed as follows (items a-e):

a. Offerors shall enter unit prices, percent mark-ups, extended prices and total amounts as indicated on Attachment B- Schedule of Services, for the base period and all option years. All labor rates and extended prices shall be rounded to two (2) decimal places and the rounded prices will be used for evaluation purposes.

b. In the event there is a difference between a labor rate and the extended total amount (i.e. Hourly labor rate x estimated hours = extended total) the labor rate will be held to be the intended offer and the extended price and total price will be recomputed accordingly. If the offeror provides a total amount for a labor category(s) listed in Attachment B- Schedule of Services, but fails to enter the unit price, the extended price divided by the estimated labor hours will be held to the intended unit price or labor rate.

c. Proposed burdened labor rates shall reflect composite fully burdened hourly labor rates for prime/Joint Venture contractor, as applicable, performing work under the contract. Burdened hourly labor rates shall include the following costs: direct labor, fringe benefits, overhead, phone service (cellular and landline), all computer charges for computer workstations and laptops including standard software packages, general and administrative costs, and profit. Additionally, administrative costs for contract management, invoicing and other task order administrative tasks will not be separately negotiated, and shall be incorporated in the indirect costs included in the fully burdened hourly labor rates. Additional burdened labor classifications for the prime/JV will not be added to the contract or negotiated under individual task orders.

d. Applicable travel costs will be negotiated under individual task orders. Travel, subsistence and per diem costs negotiated under task orders shall be in compliance with current Joint Travel Regulation rates. The estimated travel costs listed in Attachment B are for proposed costs to be directly incurred by the prime/JV under task orders issued under the contract. The prime/JV travel costs will be multiplied by the percentage shown on the schedule for direct costs and profit applied to travel. The multiplier percentage proposed shall include all handling fees, indirect costs, i.e., overhead and general and administrative costs, and profit applicable to travel. No additional indirect costs or profit will be applied to the prime contractor’s travel except as included in the multiplier percentage listed in the Attachment B- Schedule of Services.

e. Supplies/equipment/other direct costs will be negotiated under individual task orders. The estimated supplies/equipment/other direct costs listed in Attachment B - Schedule of Services are for proposed costs to be directly incurred by the prime/JV under task orders issued under the contract. These costs include, but are not limited, to equipment, supplies, material, reproduction, and shipping. The prime/JV/subcontractor “other direct costs” will be multiplied by the percentage shown on the schedule for indirect costs and profit applied to “other direct costs.” The multiplier percentage proposed shall include all handling fees, indirect costs, i.e., overhead and general and administrative costs, and profit applicable to “other direct costs.” No additional indirect costs or profit will be applied to the prime contractor’s “other direct costs’ except as included in the multiplier percentage listed in the schedule.

f. Subcontractor costs will be negotiated under individual task orders. The estimated subcontractor costs listed in Attachment B- Schedule of Services are for proposed costs to be directly incurred by the prime/JV under task orders issued under the contract. The prime/joint venture subcontractor costs will be multiplied by the percentage shown on the schedule for indirect costs and profit applied to subcontractor costs. The multiplier percentage includes all handling fees, indirect costs, i.e., overhead and general and administrative costs, and profit applicable to subcontractor costs. No additional indirect costs or profit will be applied to the prime contractor’s subcontractor costs, except as included in the multiplier percentage listed in the schedule.

Tab H. Please submit the below items (a through c) with your price proposal in a SEALED envelope labeled “TAB H”. Although this information is required to be submitted with your firm’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. In order to be eligible for award, your firm must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards.

a. Provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or at least by an authorized officer of the organization.

Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements submit the latest three complete fiscal year financial statements for each Joint Venture company and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.

b. One (1) signed Bank Reference demonstrating adequate financial resources. If your firm has a line of credit, provide information on how many figures can your firm borrow against the line of credit (i.e.

“medium 6 figures”,-exact line of credit is not required).

c. Three (3) signed credit references. Credit references must verify that your firm pays its creditors timely and in accordance with the terms negotiated with the creditor.

d. The Government may request additional information if needed to determine responsibility.

Tab I. Compensation Plan for Professional Employees. Provide a total compensation plan in accordance with FAR 52.222-46, Evaluation of Compensation for Professional Employees (FEB 1993), setting forth salaries and fringe benefits proposed for the professional employees who will work under the contract. Advise if you have different compensation plans for various skill levels. Although this information is required to be submitted with your firm’s price proposal, this information will not be evaluated as part of the price proposal. This information will be utilized as additional basis of your responsibility determination should your firm be considered for award.

Tab J. SMALL BUSINESS SUBCONTRACTING PLAN

In accordance with FAR 19.7, all other than small businesses shall submit a Small Business Subcontracting Plan (SBSP) utilizing the template provided as Attachment J-5. Acceptability of the SBSP will be considered a responsibility matter. The SBSP will not be evaluated or rated by the SSEB, but reviewed by a Small Business

Professional/Authorized Representative and the Contracting Officer for acceptability. The SBSP shall be negotiated and/or accepted within the time specified by the Contracting Officer. Failure to negotiate an acceptable subcontracting plan within the time limit prescribed by the Contracting Officer will render the offeror ineligible for award of the contract. The SBSP will be incorporated into the resulting contract.

NAVFAC’s command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging, small business subcontracting goals for this acquisition consistent with efficient and effective performance of the contract. These targets are based on a percentage of total planned subcontract dollars.

Small Business (SB) 40% Small Disadvantaged Business (SDB) 5% HUBZone SB 3% Woman-Owned Small Business (WOSB) 9% Service-Disabled Veteran-Owned Small Business (SDVOSB) 5%

The SBSP shall be consistent with the commitments offered in the Small Business Participation Commitment Document (Attachment J-4). In accordance with DFARS 215.304(c)(i), when an evaluation assesses the extent that small businesses are specifically identified in proposals, those small businesses considered in the evaluation shall be listed in the SBSP.

Please note that SBSP goals and the small business participation requirements provided in the Small Business Participation Commitment Document (SBPCD) WILL NOT be the same. The small business participation requirements within the SBPCD are provided as percentages of the total contract value; subcontract plan goals are provided as a percentage of planned subcontracting dollars. While the percentages will differ, the types of products/services identified in the SBSP, should be the same as those products/services identified in the SBPCD.

Likewise, the planned small business subcontract dollars in the SBSP will be equal to (or in some cases greater than) the extent of small business participation identified in the SBPCD.

Tab K. Please submit the below information, on your firm’s official letterhead, with your price proposal in a SEPARATE SEALED envelope, labeled “TAB K”, and marked as “CONTROLLED UNCLASSIFIED

INFORMATION”.

The letter shall contain the following:

Controlled By: U.S. NAVY Controlled By: [Company Name] CUI Category: OPSEC / PRIVACY Limited Dissemination Control: FEDCON POC: [Company – Facility Security Officer (Name/phone #)]

A statement regarding your firm’s possession of a Top Secret Facility Clearance, your firm’s CAGE Code information, and your firm’s Facility Address. This information is required to confirm your firm’s ability to meet the required Facility Clearance and Safeguarding capability for work under this contract.

A list of the cleared personnel (Full Name and SSN) who are proposed to work on this effort with their clearance level.

This data is NOT to be included on the electronic copies you will provide via a non-rewritable CD. Although this information is required to be submitted with your firm’s price proposal, this information will not be evaluated as part of the price proposal. This information allows the verification of your firm’s possession of the required security clearances. In order to be eligible for award, your firm must possess a Top Secret Facility Clearance.

(b) Volume II — Non-Price Proposal:

(1) Solicitation Submittal Requirements: Submit one (1) “Original” and three (3) copies of the non-price proposal in three-ring binders, clearly marked as Volume II: Non-Price Proposal and tabbed appropriately.

Non-price proposals shall be submitted on 8 ½ x 11 paper with a font no smaller than 10 point. In addition to providing hard copies of the non-price proposal, offerors shall provide one (1) electronic copy of the non-price proposal on a non-rewriteable CD that shall be Microsoft Office 2016 compatible. Failure to provide an electronic copy and/or Adobe PDF loaded on the non-rewritable CD may be cause to render the offeror non-responsive. The non-price proposal shall not exceed 50 single-sided or 25 double-sided pages. Pages exceeding the 50 single-sided / 25 double-sided page limitations shall not be evaluated. Note: The page limit count does not include the following:

Blank tab dividers and cover pages, Tab A, B, and C documents (including commitment letters from team members/subcontractors or Joint Venture agreements), Attachment J-1 Past Performance Questionnaires (PPQs), CPARS, Attachment J-4 – Small Business Participation Commitment Document (SBPCD), and Attachment J-5 – Small Business Subcontracting Plan (SBSP). Offerors may submit the organizational chart using 11 x 17 size paper and it will count as one (1) page towards the overall page limit listed above. Only the organization chart may be presented on 11 x 17 size paper. Each copy of the non-price proposal shall include a separate tab for each item specified below:

Tab A- Offerors shall include a cover page that provides: name and address of the prime contractor, UEI number, Cage Code and the name, title, email, phone and fax number of two (2) authorized representatives.

Tab B- Any offeror proposing as a partnership, joint venture, other teaming arrangement, or resource of a parent company/subsidiary/affiliate shall submit the following information:

I. Provide a listing of the team members’ corporate name (no abbreviations), address, point of contact, phone number, UEI Number, and CAGE Code.

II. Submit a signed letter of commitment from the team members. The commitment letter shall clearly identify the expected relationship, role and responsibility of the team member.

III. If proposing as a Joint Venture, provide the UEI Number; CAGE Code and a signed copy of the Joint Venture Agreement.

Tab C- Non-Price Factors.

(Tab 1) Factor 1 - Corporate Experience

(i) Solicitation Submittal Requirements: The Offeror shall provide a minimum of two

(2) and a maximum of three (3) examples of recent and relevant contracts to be documented through use of Corporate Experience Project Data Sheet (Attachment J-2). The Offeror shall clearly demonstrate recent and relevant experience on contracts similar in size, scope, and complexity to the requirements described in the Performance Work Statement (PWS). For purposes of this evaluation, a recent and relevant contract is defined as a standalone contract or task order issued against an IDIQ that has been completed within the last five (5) years preceding the release date of the solicitation, having a value of $800,000 or more, and containing one or more of the following six (6) services:

1. Performance of All Hazard Threat Assessments

2. Performance of Utility Security Assessments

3. Performance of Facility-Related Control System assessments to include working knowledge of the DoN accreditation process

4. Performance of Mission Assurance Assessments

5. Performance of work to support Critical Infrastructure Protection

6. Providing assistance in incorporating data into Department of Defense official systems.

Offerors that demonstrate experience performing Utility Security Assessments on utility systems as defined by 10 U.S.C. §2688 to include: electric power, treatment or supply of water; collection or treatment of wastewater;

generation or supply of steam, hot water, and chilled water; supply of natural gas; and transmission of telecommunications, may be considered more favorably than Offerors without such experience. This also includes equipment, fixtures, structures, and other improvements utilized in connection with a system and real property, easements, and rights of way associated with utility system.

Offerors that demonstrate experience with the performance of Mission Assurance Assessments for the Department of the Navy may be considered more favorably than Offerors without such experience.

Offerors that demonstrate experience working with the Critical Asset Management System (CAMS), the Defense Readiness Reporting System (DRRS), or the Mission Assurance Standalone Tool (MAAST), may be considered more favorably than Offerors without such experience.

Relevant experience performed by the Offeror as a prime contractor may be considered more favorably than experience performed by the Offeror as a subcontractor, or by a proposed subcontractor.

If the Offeror is a Joint Venture (JV), and the JV has shared recent and relevant experience, at least one of the relevant projects should be submitted for the JV entity. If the JV does not have shared relevant experience, recent and relevant experience shall be submitted for each JV partner. Offerors who fail to submit experience for all Joint Venture partners may be rated lower. Offerors are still limited to a total of three (3) relevant experience examples.

If the Offeror uses a proposed subcontractor(s) to demonstrate corporate experience, the Offeror must provide a signed letter of commitment; the subcontractor’s Unique Entity ID number; submit at least one (1) contract for its proposed subcontractor(s); and, demonstrate that the proposed subcontractor will have meaningful involvement in the performance of the contract.

If the Offeror uses affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF33) to demonstrate corporate experience, the Offeror shall clearly demonstrate that the affiliates/subsidiaries/parent/LLC/LTD member companies will have meaningful involvement in the performance on this contract.

For each standalone contract and task order the offeror shall complete the Corporate Experience Project Data Form included as Attachment J-2. All information shall be provided as requested on the form.

IMPORTANT: It is the Offeror’s responsibility to clearly explain and demonstrate to the Government how its work experience, and the experience of each teaming partner (if applicable) in each submitted contract is relevant to the contract requirements in this solicitation. If the Offeror does not clearly explain how its experience(s) are relevant to the contract requirements in this specification, the Government may determine that the submitted contract experience is not relevant.

(Tab 2) Factor 2 - Technical/Management Approach

(i) Solicitation Submittal Requirements: The Offeror shall clearly demonstrate its understanding of current Navy and Marine Corps Mission Assurance Program Requirements and the ability to utilize current standards, policies, procedures, and processes utilized in accomplishing the scope, complexity, and magnitude of service requirements set forth in the Performance Work Statement (PWS). The Offeror shall address each of the following components separately (failure to address item a. or b. will be a deficiency):

a. Technical Approach: PWS Solution:

1. The Offeror shall provide a concise narrative of how it will perform the following tasks outlined in the

Requirements Section of the PWS:

1. All Hazard Threat Analysis

2. Mission Analysis

3. Mission Assurance Assessments

4. Utility Security Assessments and supporting FRCS

5. Critical Asset Management (CAMS) Training

6. Critical Infrastructure Protection Review and Monthly Updates

Narratives for items 1-6 shall include the development of deliverables as well as the required site visits, data collection, and briefing of materials to high-level military and civilian members.

2. The Offeror shall provide information on their ability to use Navy and Marine Corps information repositories including but not limited to: Navy Critical Asset Management (NAVCAMS), USMC Critical Asset Management (MCCAMS), Defense Readiness Reporting System (DRRS), and Mission Assurance Assessment Standalone Tool (MAAST).

b. Management Approach: Staffing and Resourcing: The Offeror shall provide a current organizational chart that demonstrates a discernable and logical flow of authority, responsibility, management, and communication between office headquarters staff, field office staff, subcontractors, and scientific or technical services. If applicable, address subcontractor interfaces and show how assigned responsibilities and experience of personnel will enhance project and contract execution. Describe the extent to which the proposed program management organization will interact with the home office organization and other supporting offices under the contract in order to meet the requirements detailed in this solicitation.

1. Management Capabilities and Plan: The Offeror shall provide a narrative that describes/demonstrates its Management Capabilities and Management Plan. The Offeror shall provide a Management Plan that describes the Offeror’s ability to provide personnel for on-site assessments and its ability to provide support at multiple sites simultaneously. The narrative shall address how the Offeror will provide the staffing and necessary materials needed in geographical locations covered by this solicitation. Offerors shall address their ability to maintain program continuity and uninterrupted high-quality work as well as their ability to support the clearance requirements for the sensitive nature of this work.

2. Staffing Plan: The Offeror shall provide a narrative that describes/demonstrates its Staffing Plan, including availability of the required competent personnel identified in Section C, 2.5 Specific Personnel Requirements, and plan for retaining and replacing to assure continued availability of qualified personnel—including personnel having Top Secret Security Clearance. This narrative must also address the Offeror’s plan to maintain adequate staff with the appropriate security clearances.

3. Quality Control System (QC) Program: Provide a summary of the proposed QC program, including a quality management chart with lines of authority, inspection/surveillance methodology, corrective procedures and follow-up that will be used to ensure success of the contract. Describe the quality management processes (practices, resources, and activities), minimum controls and methodology and how quality management processes will address and ensure the following:

a. Accurate documentation of work processes, procedures, and output measures;

b. Accurate documentation of quality inspections and surveillance conducted throughout the execution of work;

c. Assessment-driven corrective actions and process adjustments in a timely manner.

(Tab 3) Factor 3 - Safety

(i) Solicitation Submittal Requirements: The Offeror shall submit the following information: The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative, as described further below. For a partnership or joint venture, the Offeror shall submit separate DART rates and TCR for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.

NOTE: DART and TCR shall not be submitted for subcontractors.

1. DART Rate: Submit five (5) previous complete calendar years’ [CY2023, CY2022, CY2021, CY2020, and CY2019] worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.

a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.

b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.

𝑫𝑨𝑹𝑻 𝑹𝑨𝑻𝑬

2. TCR Rate: Submit five (5) previous complete calendar years’ [CY2023, CY2022, CY2021, CY2020, and CY2019] worth of data (not an overall average). If the Offeror has no TCR rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.

a. TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.

b. Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000, and then divide by the number of employee labor hours worked.

𝑻𝑪𝑹 𝑹𝑨𝑻𝑬

3. Technical Approach to Safety: Submit a narrative that addresses the following:

a. Describe the Offeror’ s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describe the evaluation process used to select potential subcontractors.

c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page.

4. The Government reserves the right to review other available sources (public/Government internal) of information.

These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.

(Tab 4) Factor 4 - Small Business Utilization and Participation

It is the policy of the Government to provide maximum practicable opportunities in its acquisitions to Small Business (SB) concerns, including Small Disadvantaged Business (SDB), Woman-Owned Small Business (WOSB), Historically Underutilized Business Zone Small Business (HUBZone SB), Veteran-Owned Small Business (VOSB), Service-Disabled Veteran-Owned Small Business (SDVOSB), and other small business concerns. Further, it is the policy of the Government that such concerns will have the maximum practicable opportunity to participate in contract performance consistent with its efficient performance.

This Factor assesses both the historical achievements in utilizing small business concerns and the proposed small business participation commitment for this requirement. The offeror is required to demonstrate its previous commitment to SBs through its record of past utilization of SBs and the level of commitment to small business if awarded a contract under this solicitation.

(i) Solicitation Submittal Requirements:

1. All Offerors (large, non-profits, AND small businesses) shall use Attachment J-3 (Historical Small Business Utilization) to demonstrate their historical utilization of SBs. Each project submitted under, shall be included on Attachment J-3. Failure to include each project submitted under Factor 1, Corporate Experience, on Attachment J-3, or the failure to fully complete Attachment J-3 for each project may result in a deficiency. Only complete Attachment J-3. Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to Attachment J-3 will not be evaluated. Offerors are permitted to expand portions of the form, as needed, to provide sufficient response. Instructions regarding how to complete Attachment J-3 are included at the beginning of the attachment.

2. All Offerors (large, non-profits, AND small businesses) shall use Attachment J-4 (Small Business Participation Commitment Document (SBPCD) to submit the following required information for evaluation of this factor:

• To demonstrate commitment to use small business concerns in the performance of this contract, identify by name the subcontractors that will be used to support each small business category, including SDB, WOSB, HUBZone SB, VOSB, and SDVOSBs. s Identify the type and complexity of product/service to be subcontracted, and the type of commitment (i.e., teaming agreement, joint venture agreement, mentor protégé agreement, letter of commitment, etc.) with each subcontractor.

o If subcontractors are not identified by name, offerors shall provide a detailed explanation why subcontractors are not identified. If firm written commitments with SBs are not in place, offerors shall provide an explanation and rationale on the ability to achieve the proposed participation. (See Attachment J-4, paragraph 5) o If a LB offeror does not intend to subcontract, provide a detailed explanation why subcontracting would not result in efficient contract performance. SBs intending to 100% self-perform are not required to provide an explanation. (See Attachment J-4, paragraph 6)

• To demonstrate maximum practicable participation of small businesses, identify (in terms of dollar value and percentage of the total contract value) the offeror’s proposed small business participation. The minimum required small business participation (i.e. work to be performed by small business as the prime contractor and/or work to be performed by small business subcontractors) is 20%. Offerors who are not able to meet the minimum total small business participation requirement of 20% (of the total contract value) shall provide a detailed explanation why the minimum total small business participation requirement cannot be achieved.

• Only complete Attachment J-4, Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to Attachment J-4, will not be evaluated.

• Large business offerors may achieve the minimum total small business participation requirement through subcontracting to small businesses.

• Small business offerors may achieve the minimum total small business participation requirement through their own performance/participation as a prime as well as through a joint venture, teaming arrangement, and/or subcontracting with other small business concerns.

(Tab 5) Factor 5 - Past Performance

(i) Solicitation Submittal Requirements: Submit a completed CPARS evaluation for each contract action submitted under Factor 1, Corporate Experience. IF A COMPLETED CPARS EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH THE PROPOSAL. IF THERE IS NOT A COMPLETED CPARS EVALUATION, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1, Corporate Experience. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS

AVAILABLE.

IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment J-1), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Barkley Brown, via email at barkley.k.brown.civ@us.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Also include performance recognition documents received within the last five (5) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

Sources of Past Performance Information for evaluation that may be used are as follows:

- Past performance information provided by the offeror, as solicited;

- Past performance information obtained from questionnaires tailored to the circumstances of the acquisition; and

- Past performance information obtained from any other sources available to the Government, to include, but not limited to, Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; the Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers, and Fee Determining Officials.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate, and complete past performance information rests with the Offeror. The Government will not review or consider certificates of appreciation or other performance recognition documents.

A copy of the blank Past Performance Questionnaire to be used for requesting client references is included as Attachment J-1.

L.7 DISPOSITION OF PROPOSALS

Proposals from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .