This document is a comment resolution matrix for a solicitation to provide large capacity weight handling equipment. The Navy seeks proposals to establish multiple award contracts to furnish cranes and hoists for shipyards in Virginia and Hawaii. Offerors must submit proposals by a June deadline, and awards will be made by September 2022. The opportunity is set aside for small businesses. The document provides responses to industry questions on technical requirements, drawings, existing equipment details, schedules, testing procedures, and preferences regarding union labor. It clarifies that cybersecurity scoring is not required and confirms thruster brakes meet specifications. No further details on products or services are specified beyond what is in the original solicitation.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Comment Resolution Matrix for Sol. N62470‐22‐R‐9013 Amendment 0002
Industry Submitted Information
ID # RFP
Document Section Subsection Page # Information Request (Question) Government Response 1 RFP L3 NA 61 Request for drawings of existing crane and bldg crane is located Drawings are provided via this Amendment (Amendment 0005)
2 Specification 2 2.3.3 44
Section 2.3.3.5, states “Notebook computer compatible software and all…” is the intent to only supply the needed software or is a notebook computer required with the crane. It seems a comma could be missing after “computer”.
Only the compatible software and cable connections are required. There would have been a separate paragraph specifically calling out a laptop computer/engineering workstation if one had been required.
3 Specification 2 2.3.3 48
Section 2.3.3.12, is the contractor required to supply a new “wall or column mounted disconnect switch” for the entire bar system or just for the new 20ft section? Can the existing disconnect be used to supply power to this new section?
The contractor is required to provide all necessary hardware to the crane from a wall or column mounted disconnect switch. The disconnect switch will be appropriately sized for the electrification system, including the new 20ft., and provided by the government.
4 Specification 2 2.3.3 49 2.3.3.18. Capacity Overload Protection, no display of weight is required. Is this the intent?
Correct. No weight display is required.
5 Specification 2 2.3.3 49
2.3.3.21 Software and Services & 2.3.3.22 Access Control, 2.3.3.23 Account Management etc. Discuss approach
Specification sections 2.3.3.21through 2.3.3.30 are design requirements to be implemented into the control system and network design. For this project, it appears the requirements will have to be implemented into any variable frequency drives, programmable logic units, remote terminal units, and/or any other devices with microprocessors. It is noted there is to be no laptop or engineering worksation provided therefore it is not necessary to implement the design requirements into that device. Note the associated cyber security closeout submittals SD-11.7 through SD-
11.16 reuires the contractor to provide documentation/declarations of satisfactory implementation of the design requirements in sections 2.3.3.21 through 2.3.3.30.
6 Specification 2 2.3.2 36
Section 2.3.2.10 states that hoist brakes are to be “Electro-mechanical” is the intent to have DC Magnet brakes or are thrusters allowed. This section also specifies thruster housing material requirements.
Thruster brakes meet the intent of this specification requirement.
7 RFP N/A N/A N/A
Will the contractor be allowed to add a hatch to the roof to remove / install the cranes?
No, unless specific coordination efforts were to take place including (but not limited to) those given below:
8 RFP N/A N/A N/A
Can the Navy provide the building drawings prior to the bid for use in estimating the installation cost?
See PPI#1
9 RFP N/A N/A N/A
Can the Navy provide the relevant drawings of the old crane for estimating removal cost?
See PPI#1
10 RFP
J4 form - if the client doesn't respond should we at least complete block 5? Per RFP Section M - Evaluation Factors for Award, (2) Factor 2 Past Performance, "If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).
11 Specification 2.3.2 Mechanical design 2.3.2.9 35
This section states "Enclosed hoist drive gearing shall be selected for service factor greater than or equal to 3.0 if CMAA service class D or higher, or industrial duty if CMAA rated service class C."
Our supplier thinks the service factor of 3.0 will make the gearbox unnecessarily huge and push the price up. Is the service factor of 3.0 required? Would a service factor lower than 3.0 be acceptable?
Per Section 1.3.1, the crane is CMAA 70 Class C (minimum), so industrial duty service factors are required. Industrial duty service factors are given in Table A.4 of AGMA 6013.
ID # RFP
Document Section Subsection Page # Information Request (Question) Government Response 12 RFP L b 2
Requesting additional site visit opportunity after the Q/A results are posted. This can be facilitated by the shipyard. All persons that perform a site visit shall coordinate the visit through NCC to the shipyard.
13 SF33_2249013 F F1 9
Will evaluation criteria be weighted more favorably should the contractor ensure delivery order date occur earlier than June 30, 2024 for the initial seed project?
No.
14 SF33_2249013 C.6 C.6.6 6
Under "Bonding Requirements" it states "... WHEMAC will include requirements for a Bid Guarantee, Payment and Performance Bonds, or other alternative security." What qualifies for NAVFAC as "alternative security"?
Bid Guarantee requirements are outlined in the following sections of the solicitation: 1) FAR 52.228-1 Bid Guarantee (Sep 1996); 2) FAR 52.228-11 Pledges of Assets (Apr 2020)(Deviation 2020-O0016) ;and Section M / Basis of Award / M1 Evaluation Factors for Award / Price.
Performance and Payment Bond requirements are outlined in FAR 52.228-16 Performance and Payment Bonds--Other Than Construction (Nov 2006) of the solicitation.
15 J1_Seed_Project Specificiation SD-08 SD-08.2. 20
SD-08.2. Crane Removal/Installation Plan does not note facility requirements of removal of current existing parts, equipment on-site, especially if crane is demobilized. Are there any further details other than what is in OSHA standard?
When the crane is removed from the rail, the parts taken down are expected to be loaded onto trucks as soon as possible and removed per paragraph 1.3.6. (page 9 of 58) and as described in section 1.3.6 Crane Removal. See Appendix E and Section H for additional information. If there questions on specific parts or pieces, please revise and resubmit PPI.
16 J1_Seed_Project Specificiation 1.8 n/a 25
Is there a preferred amount of time in which the stop/start work impact to facility?
For example, does the facility prefer to have impacted work preferrably stop Monday-Wednesday? Are weekends able to be added to the schedule in the event that facility mission critical work cannot be stopped?
Standard work hours are an 8 hour shift between 0700 and 1530 Monday through Friday. Extended hours and weekends shall be coordinated between the shipyard, NCC and the contractor and is not garunteed. Work shall be coordinated with the shipyard to minimize impact on production, however it is generally desired to dedicate a length of time to the contractor to perform all work the originates an outage with the shop in one window of opportunity. If during that window of opportunity the shipyard has mission critical work, it will be coordinated from the shipyard through NCC to the contractor as soon as is reasonably achievable.
17 J1_Seed_Project Specificiation 2.7. 2.7.1-2.7.3. 52-55
Understanding the appropriate certifications and licenses for engineering, welding, etc. during the design and fabrication process, is there a requirement, preference, or limitations on union labor?
There is no current requirement, preference, or limitation on union labor.
18 J1_Seed_Project Specificiation 2.8 2.8.1. 55
Is there a preferred format in which the contractor self test results should be reported - or - is the "Shop Test" document in Appendix B and H of J1_Seed Project document required?
Per SD-07.8, the self-test shall be recorded on the approved Shop Test document.
19 J1_Seed_Project Specificiation 3.6 3.6.1.3. 57
Are the weights provided by the government as noted in "Field Test Acceptance" water weights? If so, is there a facility procedure for disposal of water?
Water weights are not utilized at the shipyard. Steel weights of varying nominal capacities are used in a stackable configuration.
ID # RFP
Document Section Subsection Page # Information Request (Question) Government Response
20 J1_Seed_Project Specificiation 3.6 3.6.1.3. 57
Where does the field Inspection and Test occur? The language states " One copy of the post-shop test as-built drawings and a pre-final operation and maintenance manual shall be made available at the test site" Are we to assume the test site is the same as the field site (with the dimensions) outlined in the dimensions in the Clearance Sketch in Appendix A?
Field inspection and Field Test occur once the crane is installed in Building 92 at PNS.
This is the same site that is outlined in Appendix A.
21 J1_Seed_Project Specificiation APPENDIX D Attachment 1 REV 0
Similar to question 4, is there a requirement, preference, or limiations on local union labor regarding mobilization, installation, and removal?
There is no current requirement, preference, or limitation on union labor.
J3_Past Performance Questionnaire_Cover
_Sheet Cover Sheet Cover Sheet 1
Can the clients of the offeror completing the PPQs be submitted back to the offeror to include in the proposal or should these be submitted directly from the client reference to the contracting officer directly? Based on the language of the cover sheet, we are assuming the client reference can submit the PPQ back to us (the offeror) to include in the final proposal submission.
Refer to Section M, (2) Factor 2 Past Performance, (i) Solicitation Submittal Requirements of the RFP.
23 Specification 1 SD-02.S11 12
This crane is going on an existing runway system. What drawings of the runway and supports structure are to be submitted by the crane manufacturer?
Drawings of the runway and runway support structure are not required to be submitted by the crane manufacturer. This has been removed from the specification.
(Amendmendment 0005).
24 Specification 2 2.3.1.5 28
Are 2 part rail clips accetable for the bridge rail attachedment? One piece is welded to the bridge girder then a second piece is bolted to the first piece.
A 2 part rail clip design as described is acceptable and meets the specification.
Installation requirements (required torque) shall be shown on the fabrication drawings.
Product data for the clips shall be provided in SD-03.S2.
25 RFP Document L2 60
Can we send one (via snail mail) and one electronically? If it is sent electronically do we get a confirmation? And finally, do we address this proposal to you?
Refer to section L2 CONTRACT AWARD of the RFP for submission requirements. It is unknown if offerors receive a confirmation from PIEE when a proposal is uploaded.
Please contact the PIEE help desk to address this question.
26 J1_Seed_Project_Spe cification 34 56
Does the Navy shipyard have a recommended/approved local mobile crane company?
Moore's Crane and Cote Crane are the two most common companies on the shipyard and have vast experience with both the facility as well as the inspection and security requirements for the vehicles and personnel. Other qualified and capabale crane contractors are still permitted.
27 RFP
What are the cyber requirements as far as the NIST score etc? I see that the SF33 calls out a reference to a DFARS 252.204-7019, but are we required to upload a NIST score?
No, offerors are not required to implement NIST SP 800-171 for this solicitation.