Att_(E)_Schedule_B_Pricing_-_Revised.pdf

PDF 56 KB Posted

Attached to
Construction of P-117, Vicenza High School Replacement, Vicenza Italy
Solicitation number
N6247019R5007
Issued by

About this file

Att_(E)_Schedule_B_Pricing_-_Revised.pdf

View the file

Other files

File Type Posted
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
AMEND_0005.pdf PDF
BLDG-P117-1554450-AMEND0004.pdf PDF
AMEND_0004.pdf PDF
Amend_0003.pdf PDF
Attachment_(G)_LRA_Commercial_Vehicle_Inspection_Procedures.pdf PDF
Amend_0002.pdf PDF
19R5007_Amend_0001.pdf PDF
N6247019R5007_Pre-Solicitation_Notice.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 22 13.00 20 ATTACHMENT A - BID SCHEDULE

PROJECT #: EU00119 - REPLACE VICENZA HIGH SCHOOL

VILLAGIO DELLA PACE, VICENZA, ITALY

SOLICITATION NO: N62470-19-R-5007

CLIN DESCRIPTION TOTAL

BASE BID:

0001 BASE PRICE– Price for the entire work for MILCON Project P117 Replace Vicenza High School, Vicenza, Italy in accordance with the drawings and specifications, but excluding work described in CLIN 0002, 0003, 0004, 0005, 0006, 0007, and 0008.

Enter total of CLIN 0001AA through 0001AC

0001AA PRIMARY FACILITY – Price for the entire work to construct Vicenza High School and the Field House inclusive of all materials, plant, labor and equipment in accordance with the drawings and specifications to the 1.5m (5-foot) line outside of the building. Complete, exclusive of all other work listed as separate CLIN items.

0001AB SUPPORT FACILITIES - Price for the entire project Site Work and support facilities outside the 1.5m (5 foot) line inclusive of all materials, plant, labor and equipment in accordance with the drawings and specifications.

Including Utilities, Clearing, Grading, Paving, Landscaping, Athletics Facilities and Site furnishings. Complete, exclusive of all other work listed as separate CLIN items.

0001AC HAZARDOUS MATERIAL SAMPLING, TESTING AND REPORTING

(Existing Vicenza High School) - Sampling/testing and reporting for asbestos (NESHAP compliant, semi-destructive), lead based paint, polychlorinated biphenals (PCBs), mercury containing and all other regulated, controlled or monitored building materials interior and exterior to the existing Vicenza High school campus as delineated in the demolition drawings;

Development of compliant removal plans in accordance with specifications and host nation laws.

CLIN DESCRIPTION TOTAL

OPTION 1 - ATHLETIC FIELD LIGHTING: Add field and tennis court lighting, and associated conduit and wiring as defined in the plans and specifications.

OPTION 2 - TEMPORARY ENTRANCE: Add construction of temporary access point along west perimeter fence. Local community traffic restrictions may limit the use of the access point by construction vehicles.

Contractor shall plan to use the Main Entry Control point for all construction traffic.

Enter total of CLIN 0003AA through 0003AE

0003AA Demolition and removal of wood framed storage building, clearing and removal of 4 existing trees and stumps, removal of fencing, extension of pavement, curb and gutter to tie into the existing Via Cesar Augusto road, area clearing, grading and preparation of rejection turnaround compacted gravel drive for the temporary ACP construction. Includes all labor, equipment, plant material, housing, dumping and disposal.

0003AB Design and Installation for wedge style refusal barrier.

Inclusive of engineering design, plant, labor, materials and utility infrastructure for complete and usable final assembly where indicated in the plan drawings.

0003AC Design and Installation for lighted vehicle inspection canopy. Inclusive of engineering design, plant, labor, materials and utility infrastructure for complete and usable final assembly where indicated in the plan drawings.

0003AD Procurement, installation and utility connections for pre-fabricated, modular guard kiosk building.

0003AE Installation of precast concrete "T" wall elements, concrete "Jersey" vehicle barriers and fencing repairs.

Inclusive of all required design, plant, labor and materials for complete and usable final assembly where indicated in the plan drawings

OPTION 3 -ROADWAY REPAIR - SURFACE REPAIR PATCH -

Price for continuous repair (assume bi-weekly) of the 4.25-4.5m wide residential road by repair consisting of replacement of 50mm wear surface with hot mix patch and compaction to restore complete and usable road surface. Repair a quantity of 750 SM over the duration of the construction access usage of the gate.

OPTION 4 - ROADWAY REPAIR - FULL DEPTH REPAIR - Price for repair of the 4.25-4.5m wide residential road by full depth repair consisting of saw cutting and removal to sound edges of 50mm surface pavement, removal of 150mm compacted aggregate base, recompaction of subgrade and replacement to restore complete and usable road surface. Repair a quantity of 750 SM over the duration of the construction access usage of the gate.

CLIN DESCRIPTION

TOTAL

OPTION 5 - HAZARDOUS MATERIAL REMOVAL EXISTING

VICENZA HIGH SCHOOL - Removal, handling and disposal of the materials identified in CLIN 0003

Estimated to begin July 1, 2022

OPTION 6 - DEMOLITION/DECONSTRUCTION OF EXISTING

VICENZA HIGH SCHOOL

(BUILDINGS 309, 309A, 309B, 309C, 309E, 309F AND RO309

ON CASERMA EDERLE)

Removal, recycling, haul dump and disposal of building, structures, utilities, surface improvements and underground elements as indicated.

Estimated to begin August 1, 2022

OPTION 7 - REMOVAL OF MODULAR BUILDINGS ON VHS

SITE - Removal/demolition/deconstruction, hauling, dumping and disposal of modular buildings identified on the drawings as RO358, 352, 353, 354, 355, 356, and 357.

Includes removal and capping of all associated utilities to the nearest point of connection.

Estimated to begin July 1, 2022.

BASE BID PLUS OPTIONS

TOTAL:

(SUM OF CLINS #

THROUGH

GENERAL BID NOTES

a. Provide a Lump Sum price for each Contract Line Item Number (CLIN). Award will be made on the total sum of CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007 and 0008.

b. The Government reserves the unilateral right to award CLIN 0002, CLIN 0003, CLIN 0004 and CLIN 0005 to the Contractor at the proposed price within 90 calendar days after the contract award. The Government reserves the unilateral right to award CLIN 0006, CLIN 0007, and CLIN 0008 to the Contractor at the proposed price within 600 calendar days after the contract award. A firm fixed proposed price is required for CLIN 0001, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, and CLIN 0008. No provision is made for economic price adjustment.

c. If CLIN 0002, CLIN 0003, CLIN 0004 and CLIN 0005 are exercised, the contract completion date remains 835 calendar days after award of the contract. CLIN 0006, CLIN 0007, and CLIN 0008 shall not start until CLIN 0001 is complete and determined to be capable of occupancy by the Contracting Officer.

d. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for the Base Bid. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).

e. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities.

An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

f. If CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007 and CLIN 0008 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.

g. Offerors must submit their bid in U.S. Dollars. Contract award and payment will be made in U.S. Dollars.

h. Include all costs for shipping and packaging in the base bid amount with the exclusion of any shipping and packaging done by the Government.