About this file

18R4010_Amendment_0005.pdf

View the file

Other files

File Type Posted
N6247018R4010_Amend_0004.pdf PDF
Att_(F)_ICG_Visit_Request.xlsx XLSX spreadsheet
Att_(G)_Site_Visit_Map.docx DOCX document
Att_(E)_SCHEDULE_B.docx DOCX document
18R4010_Amend_03_SF30.pdf PDF
N6247018R4010_Amend_0002.pdf PDF
N6247018R401001.pdf PDF
Att_(A)_Const_and_Design_Exp_Project_Data.doc DOC document
N6247018R4010_SF1442.pdf PDF
Att_(B)_PPQ.docx DOCX document
Att_(C)_Visitor_Pass.xls XLS spreadsheet
N6247018R4010_N6247018R4010_Pre-Solicitation_Notice.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0005 is issued for the follow ing:

1. Provide revisions to Description of Work on Page 3 of the SF 1442

2. To answ er PPI 38

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247018R4010

X 9B. DATED (SEE ITEM 11)

03-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Sep-2018

CODE

COMMANDER NAVFAC ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247018R4010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

Amendment 0005 is issued for the following:

1. Provide revisions to Description of Work on Page 3 of the SF 1442

2. To answer PPI 38

This is the final amendment. The Government does not intend to answer anymore inquiries or issue any other amendments

1. The Description of Work on Page 3 of the SF 1442 is changed

From;

P-307 will modify existing aircraft maintenance Hangar 831 to accommodate and allow full enclosure of P-8A aircraft. The existing hangar doors will be replaced to accommodate the tail vertical stabilizer height of the P-8A and the hangar structural members modified to provide for an increased door height. The project will also reconnect the facility to a 400HZ power source and replace an existing segment of the floor that spans an existing utility tunnel with a thicker floor slab.

To;

P-307 will modify existing aircraft maintenance Hangar 831 to accommodate and allow full enclosure of P-8A aircraft. The existing hangar doors will be replaced to accommodate the tail vertical stabilizer height of the P-8A and the hangar structural members modified to provide for an increased door height. The project will also reconnect the facility to a 400HZ power source, modify existing fire suppression system and mark an existing segment of the floor that spans an existing utility tunnel to prevent the aircraft main landing gear from crossing the utility tunnel.

2. Pre-proposal inquirie and response:

Question 38: Please clarify if the slab over the utility tunnel is to be replaced or just marked to prevent the aircraft main landing gear from crossing the utility tunnel.

Answer 38: The slab over the utility tunnel does not need to be replaced, but it must be marked to prevent the aircraft main landing gear from crossing the utility tunnel. The SF1442 page 3 of 44 Description of Work incorrectly states that the slab over the utility tunnel needs to be replaced. Please see item 1 of this amendment.

(End of Summary of Changes)