This modification notice updates the anticipated request for proposals release date to March 21, 2018 and the proposal due date to April 20, 2018 for solicitation N62470-17-R-4014. The solicitation is for professional services for mission assurance assessments of installation and facility infrastructure and facility-related control systems for the Department of the Navy. Services include all hazard threat analysis, mission analysis, mission assurance assessments, utility security assessments, critical asset management training, and critical infrastructure protection review.

N6247017R4014_Amendment_0002.pdf

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0002

PROFESSIONAL SERVICES FOR MISSION ASSURANCE ASSESSMENTS OF INSTALLATION/FACILITIES INFRASTRUCTURE AND

FACILITY-RELATED CONTROL SYSTEMS (FRCS) FOR THE DEPARTMENT OF THE NAVY (DON)

This amendment is issued to provide revisions to Sections A, I, J, and L and to extend the deadline for the submission of proposals to 2:00PM (EDT) on May 31, 2018. This amendment also provides responses to pre-aw ard inquiries. (SEE CONTINUATION PAGE)

CS: Kathleen Delashmitt, kathleen.delashmitt@navy.mil, 757-322-4431

1. CONTRACT ID CODE PAGE OF PAGES

J 1 29

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247017R4014

X 9B. DATED (SEE ITEM 11)

18-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-May-2018

CODE

COMMANDER NAVFAC ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247017R4014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

The purpose of this amendment is to disseminate the below information.

1.) Section A – Section A has been revised to reflect the revised deadline for the submission of proposals of

2:00PM (EDT) on May 31, 2018.

2.) Section I – FAR Clause 52.219-28 is revised to correct a typo regarding the applicable NAICS code.

3.) Section L – L.2 has been revised to extend the deadline for pre-award inquiries to May 16, 218 at 2:00PM (EDT) and L.6 (b) (4) Factor – Small Business Utilization, Solicitation Submittal Requirements, has been revised to correct a typo regarding Attachment numbers.

4.) Section J – Amendment 0002 pre-award inquiry responses.

(Revisions are provided by the use of red font.)

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 24-May-2018 02:00 PM to 31-May-2018 02:00 PM.

The following have been modified:

SECTION A

NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC), ATLANTIC

6506 HAMPTON BLVD

NORFOLK, VIRGINIA 23508-1278

SOLICITATION: N62470-17-R-4014: PROFESSIONAL SERVICES FOR MISSION ASSURANCE

ASSESSMENTS OF INSTALLATION/FACILITIES INFRASTRUCTURE AND FACILITY-RELATED

CONTROL SYSTEMS (FRCS) FOR THE DEPARTMENT OF THE NAVY (DON)

NOTICE: PROPOSALS ARE DUE BY 2:00 P.M. (EDT) ON MAY 31, 2018.

Proposal is to be submitted to office listed below:

Naval Facilities Engineering Command (NAVFAC), Atlantic Attn: Kathleen Delashmitt and Erin Quimby, Code ACQ22 6506 Hampton Blvd, Mail Room Norfolk, Virginia 23508-1278

A.1 CONTRACT TITLE

Professional Services for Mission Assurance Assessments of Installation/Facilities Infrastructure and Facility- Related Control Systems (FRCS) for the Department of the Navy (DON).

A.2 TYPE OF CONTRACT

Single award Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) contract.

A.3 COMPETITION REQUIREMENTS/SET-ASIDE

This procurement is unrestricted.

A.4 NAICS CODE

The NAICS code assigned to this procurement is 541690, Other Scientific and Technical Consulting Services, having a size standard of $15 Million. Refer to Section K, Representations, Certifications and Other Statements of Offerors.

A.5 REQUEST FOR PROPOSAL (RFP) FILES

It is the sole responsibility of the Offeror to obtain the RFP files, along with any amendments, from either Navy Electronic Commerce Online (NECO) website (www.neco.gov) or Federal Business Opportunities (www.fbo.gov).

Unprotected, editable, and electronic file copies of the RFP documents, including Word, Excel, and/or Adobe files will not be provided. Please plan accordingly.

SECTION I - CONTRACT CLAUSES

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JULY 2013)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code 541690 assigned to contract number ____________________.

(Contractor to sign and date and insert authorized signer's name and title).

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been added by full text:

AMENDMENT 0002: PPI RESPONSES

Amendment 0002: Pre-award Inquiries

Question No.

REFERENCE QUESTION GOVERNMENT RESPONSE

Page Section Para.

7 N/A N/A N/A Request the government provide historical information regarding the level of effort (number of site visits and duration of each) expended throughout the life of the current contract, or the last 5 years, whichever is longer?

Historically, the average number of site visits per month is four, each typically lasting about a week, but varies according to size of the base and number of tenants.

8 N/A N/A N/A Request the government provide historical information on required frequency / revisit rate that each installation / facility has been and is required to be visited by MA teams.

The Mission Assurance Program is continually evolving to keep up with the requirements of the DoN warfighters and is always looking at ways to streamline reports and site visits where possible.

9 N/A N/A N/A FY18 and FY17 OPNAV MA messages list approximately 53 Naval installations for MAAs to be completed in their respective fiscal year. Request the government clarify whether or not additional MAA for these installations are required as part of this effort. If not, please indicate how may additional MAAs are anticipated worldwide under the scope of work.

The MAA is a continuous process.

Any specific MAAs required will be defined within the individual task order.

10 7-11 C 2.5 Several specific personnel requirements include certification requirements relevant to the positions. Would the government consider private industry certifications as equivalent to DoD certifications? For example, the Certified Protection Professional (CPP) certification covers 7 domains so it is an applicable counterpart to multiple relevant DoD certifications.

Yes, the Government will consider accepting non-DoD certifications where equivalency to the relevant DoD certification is explained in the proposal.

11 7 C 2.5 States “If, during the performance of this contract, the Contractor must utilize personnel other than those identified in the technical proposal,..." There is no requirement in Sections C, L, or M to identify proposed personnel. Request the government clarify which personnel must be identified in the proposal.

Offerors must provide a Staffing Plan in accordance with Factor 2, b.

Management Approach, 2. Staffing Plan “including availability of the required competent personnel identified in Section C, 2.5 Specific Personnel Requirements.”

12 7 C 2.5 States “…the KO shall have the right to request documentation sufficient to verify compliance with the qualification requirements at any time during the course of the contract.” Request the government clarify what it means by

Sufficient documentation will be defined by the KO's request at the the time thereof.

“sufficient documentation” and how will it be provided? For example, is a resume sufficient to demonstrate education qualifications or will the KO want a transcript? What about security clearances?

13 87 M M2(b)(1) States “… Offerors demonstrating that they have at least 7 employees with Top Secret Clearance—or Interim Top Secret personnel security clearance with in-progress clearance investigation— currently available may be viewed more favorably than those who do not.” Request the government clarify what constitutes successful “demonstration” of this requirement? If the offer has more than 7 technically qualified personnel with TS, will they be evaluated evaluation more favorably than offerors who do not?

Please reference Sections L for submittal requirements and Section M for the basis of evaluation of various factors.

14 87 M M2(b)(1) States: "Relevant experience performed by the Offeror as a prime contractor may be considered more favorably than experience performed by the Offeror as a subcontractor, or by a proposed subcontractor." Request the Government remove this statement due to the fact that most small businesses teaming with the Prime potentially do not have prime contracts; however they meet the other PP requirements, limits competition, and provides the incumbent with the advantage.

No.

15 83 L L6(b)(5) States: "Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation." Request the Government remove the second sentence regarding previously submitted PPQ information.... as this does not provide for a even evaluation and limits competition as some companies might not have previously submitted PPQs.

Factor 5 will not be revised as requested. Please reference Section M, Factor 5, Basis of Evaluation: “In the case of offerors without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)), and will receive a Neutral Confidence Rating.”

16 5 1.2 3 The Last Sentence states "Refer to UFC 4-010-06, Cybersecurity of Facility- Related Control Systems". This document has been cancelled is there a replacement?

Refer to the Whole Building Design Guide at www.wbdg.org.

17 5 1.2 6 “The Contractor shall possess and maintain a TOP SECRET facility clearance from the Defense Security Service (DSS). All permanent storage of

Per the Solicitation: “All permanent storage of classified information will be on cleared government facilities.”

classified information will be on cleared government facilities.” Please clarify that it is the government's intention to not allow support contractors from storing any mission-relevant classified information in their cleared facilities.

18 5 1.2 6 “The Contractor shall possess and maintain a TOP SECRET facility clearance from the Defense Security Service (DSS). All permanent storage of classified information will be on cleared government facilities.” Based on this statement it would appear that all contractor facilities would have to be in close proximity to government facilities capable of storing classified information.

Will this preclude contractors from working from their remote facilities or will the government provide space at their facilities for contractor personnel?

Contractors will only be provided a location to work on classified documentation on an as-needed basis.

19 73 L all There is no mention of the desire for a transition plan in Section L requirements for the Technical Approach / Management Approach. Request the government clarify its intentions on the transition period for this contract.

Per clause 52.216-1 Type of Contract (Apr. 1984), “The Government contemplates award of a Firm-Fixed- Price Indefinite Delivery Indefinite Quantity contract resulting from this solicitation.” Additionally, Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

20 N/A N/A N/A Please describe the relationship, if any, between NAVFAC MA activities and Dahlgren’s NSWCDD MA activities.

They appear duplicative.

NAVFAC does not know the SOW of the Dahlgren's MA activities.

21 N/A N/A N/A Attachments J-3 through J-8 are PDF files. Will the government provide PDF Forms, or Microsoft Word versions of these documents, or would the government allow Offerors to convert these file to editable format?

Offerors may edit the files as necessary to provide the submittal requirements listed in the solicitation.

22 NA NA NA Will there be a shortlist and interview process performed for this Solicitation?

No, please see Section M.1, paragraph 2.

23 78 (b) Volume 2: Non-price Factors

1 May graphics, exhibits, and tables use 8 pt font or larger for captions, legends, or footnotes?

Please see Section L.6 (b): “font no smaller than 10 point.”

24 81 (3) Factor 3

- Safety

Please confirm that the required Safety Rates can be provided on a separate page from the allotted two pages for the Technical Approach for Safety.

Yes. Please references Section L.6 (b) regarding page limitations.

25 5 C.1.2 Page 5 Section C.1.2 defines Utility systems as: ‘In alignment with Title 10 USC, Section 2688, the term “utility system” means generation and supply of electric power; treatment or supply of

Yes, these systems may be included in the scope of individual task orders.

water; collection or treatment of wastewater; generation or supply of steam, hot water, and chilled water;

supply of natural gas; and transmission of telecommunications. This also includes equipment, fixtures, structures, and other improvements utilized in connection with a system; real property, easements, and rights of way associated with utility systems.’

It is well known that shipyards, air stations, and MCBs have utility systems that are essential to the execution of mission but may not be a part of the USC definition. Are these systems included in this effort?

26 11 2.7 Travel Will contractor personnel be allowed or required to stay in OCONUS or CONUS government quarters. If yes, which locations?

Travel and lodging expenses and availability will be addressed on a task order by task order basis.

27 12 3.3.1 Quality Control

What are the specific requirements to be included within a QCP? When are QCPs required for task orders? the Solicitation states "as necessary." Two and a half pages of the solicitation describe the government's Quality Assurance Surveillance Plan, yet little is provided on what is required of the contractor.

Task Order QCPs shall be developed in accordance with and as required by the individual task order's PWS to ensure the Contractor maintains an effective quality control program to ensure services are performed in accordance with the IDIQ contract and the individual task order.

28 79 Factor (1)

Please define the DoN accreditation process?

Please reference Section M.2 (b), Factor 1 - Corporate Experience, “assessment of the Offeror's recent and relevant experience will be used as a means of evaluating the capability of the Offeror”—“relevant contract is defined as ... containing one or more of the following...Performance of Facility- Related Control System assessments to include working knowledge of the DoN accreditation process.”

29 81 Factor (2). b.1.

Manage ment Capabilit ies and Plan

The Management Capabilities and Plan states: “The Offeror shall provide a Management Plan that describes the Offeror’s ability to provide personnel for on-site assessments and its ability to provide support at multiple sites simultaneously”. What are the expectations for the simultaneous delivery of site visits and/or task orders?

How many sites require this number of Top Secret and Secret cleared staff on-site simultaneously? Given the size of this contract, this has a big impact on staffing and pricing.

Per Section L.6 (b), Factor 2 (b) (1):

“The Offeror shall provide a Management Plan that describes the Offeror's ability to provide personnel for on-site assessments and its ability to provide support at multiple sites simultaneously.”

30 81 Factor (2). b.3.

QC

Program

QC Program – What are the UFC or UFGS or NAVFAC standard Quality Control standards that are required for this contract?

Please refer to the solicitation, the solicitation clauses, and any and all appropriate laws and regulations.

31 86 M.2.

(b)(1)

Basis of Evaluatio n

M.2. (b)(1) states that the basis for evaluation will be the “Offeror demonstrates experience in performing work of similar size scope and complexity to this requirement…..a relative contract …having a value of $1,000,000 or more….” This means that a contractor who has successfully delivered a contract with a total value of $1M will be evaluated on par with a contractor who has experience in delivering global contracts with a total value of $95M or more per this criterion.

The skills and abilities to manage and execute a $1M contract are completely different than those required to execute a $95M contract. Selection of contractor whole past experience is limited to $1M contract oversight and execution places the government at significant risk. Does the government consider previous successful execution of a $1M contract to be the standard of acceptance for the ability to execute this $95M contract? Is this the intent of this paragraph?

Please reference Sections L and M for the definition of a relevant contract.

32 2 Section A

Notice We are requesting that NAVFAC consider a 2 week extension to the proposal due date if key personnel requirements, corporate experience requirements, or other Solicitation requirements change substantially from the initial posting.

Please see revised Section A.

33 9 and

2.5 3 and 4 on page 9 and 4 and 5 on

Several subsections state “possesses and demonstrates unique technical knowledge” but this unique knowledge is not discussed. Will the government define this unique technical knowledge?

Please reference Section C.

34 1 and

J-5 All Attachment J-5 is 2 pages long and does not provide the space required to adequately describe our relevant experience. Can offerors recreate Attachment J-5 in our proposal response, allowing the space needed or are we required to use the PDF J-5 form? If the latter, are offerors allowed to add follow-on pages to the form, as needed?

Offerors may edit the files as necessary to provide the submittal requirements listed in the solicitation.

35 75 and

Vol 1 Tab A and Vol 2 Tab A and

The requirements of Volume 1, Tab A Corporate Profile and Volume 2, Tab A Cover Page are virtually identical. Is the government’s intent to have these apparent redundancies between Volumes

Yes.

1 and 2?

36 75 and

Vol 1 Tab F and Vol 2 Tab B and

The requirements of Volume 1, Tab F Teaming Arrangements and Volume 2, Tab B Teaming Arrangements are exact duplicates, including Letters of Commitment being required for both volumes. Is the government’s intent to have these redundancies between Volumes 1 and 2?

Yes.

37 56-57 J n/a Will you provide the following “References” (electronic copy or a link to a website), as they are key to understanding the scope of the services to be provided in the Solicitation:

- USMC Assessment Team Guide, Version 5.0;

- USMC ESA Program Guide, 24 NOV 14;

- USMC OUTA Program Guide, 24 NOV 14;

- USMC/Navy AHTA Methodology;

- USMC MAA CY17 Benchmarks;

- Navy MA Team Guide, Version 2.0;

- Navy MAA FY18 Benchmarks; and,

- Facility-Related Control System (FRCS) Type List.

Please note these references are not provided on the NECO site.

Please see Amendment 0001, which removed several of the identified documents as references.

38 5 1.3 n/a Please identify the specific “Technical, professional, fieldwork, and administrative support required to perform Mission Analysis and site visits”, as those “requirements” are not identified in the Solicitation.

Please refer to the solicitation, the solicitation clauses, and any and all appropriate laws and regulations and DOD guidance. Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

39 5 1.3 n/a Please identify the specific “Technical, professional, fieldwork, and administrative support required to perform assessments and reporting in the following fields: Antiterrorism/Risk Management, Physical Security, Law Enforcement, DoD Communications, FRCS, Cybersecurity, Critical Infrastructure Program Analysis, Mission Analysis, Supporting Infrastructure, Critical Asset Security, and Program Support” as those requirements are not identified in the Solicitation.

Please refer to the solicitation, the solicitation clauses, and any and all appropriate laws and regulations and DOD guidance. Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

40 5-6 1.3 n/a Please identify the specific “Technical, professional, fieldwork, and administrative support required to perform Utility Security Assessments

Per clause 52.216-1 Type of Contract (Apr. 1984), “The Government contemplates award of a Firm-Fixed- Price Indefinite Delivery Indefinite

(USA), Utilities Strategic Planning, Energy Security Analysis, Privatization Studies, and associated reporting in the following fields for facilities and utility systems: Engineering (Electrical, Mechanical and Civil), Cybersecurity, Telecommunications (both wired and wireless), FRCS, Mission Dependency Index (MDI) database management, and Program Support Analysis”, as those requirements are not identified in the Solicitation.

a. Will the anticipated number of MAA assessments conducted per year per Service remain the same throughout the period of performance?

b. If not, what is the anticipated range for number of MAA assessments conducted for each year of the contract period of performance per Service, to include option years if exercised?

Quantity contract resulting from this solicitation.” Additionally, Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

41 5-6 1.3 n/a Please identify the specific “Technical, professional, fieldwork, and administrative support required to perform Utility Security Assessments (USA), Utilities Strategic Planning, Energy Security Analysis, Privatization Studies, and associated reporting in the following fields for facilities and utility systems: Engineering (Electrical, Mechanical and Civil), Cybersecurity, Telecommunications (both wired and wireless), FRCS, Mission Dependency Index (MDI) database management, and Program Support Analysis”, as those requirements are not identified in the Solicitation.

What is the required minimum number of MAA assessors, and their associated functional area expertise (e.g. physical security, emergency management, etc.), that is to be provided under the scope of this Solicitation to support the conduct of MAAs per Service?

Please reference Section C.

Additionally, Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

42 5-6 1.3 n/a Please identify the specific “Technical, professional, fieldwork, and administrative support required to perform Utility Security Assessments (USA), Utilities Strategic Planning, Energy Security Analysis, Privatization Studies, and associated reporting in the following fields for facilities and utility systems: Engineering (Electrical, Mechanical and Civil), Cybersecurity, Telecommunications (both wired and

Please reference Section C and Section L.6(a), Tab G, Note.

wireless), FRCS, Mission Dependency Index (MDI) database management, and Program Support Analysis”, as those requirements are not identified in the Solicitation.

Do the number of assessor SMEs required vary based on the size of the installation being assessed? If yes, please provide the range of the minimum number of assessor SMEs to support the conduct of a MAA at installations of various sizes per Service.

43 5-6 1.3 n/a Please identify the specific “Technical, professional, fieldwork, and administrative support required to perform Utility Security Assessments (USA), Utilities Strategic Planning, Energy Security Analysis, Privatization Studies, and associated reporting in the following fields for facilities and utility systems: Engineering (Electrical, Mechanical and Civil), Cybersecurity, Telecommunications (both wired and wireless), FRCS, Mission Dependency Index (MDI) database management, and Program Support Analysis”, as those requirements are not identified in the Solicitation.

Is the time (number of days) for conducting each of the identified MAA assessment fixed or standardized, per Service?

If not, what is the general range of days required to execute a MAA on various installations or other identified sites, based on execution of prior MAAs in the last two years per Service?

Historically, the average number of site visits per month is four, each typically lasting about a week, but varies according to size of the base and number of tenants.

44 5-6 1.3 n/a Please identify the specific “Technical, professional, fieldwork, and administrative support required to perform Utility Security Assessments (USA), Utilities Strategic Planning, Energy Security Analysis, Privatization Studies, and associated reporting in the following fields for facilities and utility systems: Engineering (Electrical, Mechanical and Civil), Cybersecurity, Telecommunications (both wired and wireless), FRCS, Mission Dependency Index (MDI) database management, and Program Support Analysis”, as those requirements are not identified in the Solicitation.

Per clause 52.216-1 Type of Contract (Apr. 1984), “The Government contemplates award of a Firm-Fixed- Price Indefinite Delivery Indefinite Quantity contract resulting from this solicitation.” Additionally, Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

45 6 1.3 n/a For the hazard and threat development task, what are the requirements – if any -for staff qualifications and experience to support production of that product?

Please reference Section C.

46 6 1.3 n/a With reference for the requirement for “Training to support the management of data entry into CAMS”, how many training events are required?

a. What are the anticipated locations of the training events?

b. In addition to CAMS training, what other training topics are expected to be developed and presented at training events?

Per clause 52.216-1 Type of Contract (Apr. 1984), “The Government contemplates award of a Firm-Fixed- Price Indefinite Delivery Indefinite Quantity contract resulting from this solicitation.” Additionally, Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

47 9 2.5 n/a Senior Technical Specialist (Communication): This position indicates that, “The Senior Technical Specialist (Communication) provides task unique, functional expertise necessary to interpret requirements, ensure responsiveness, and achieve successful performance. The Senior Technical Specialist (Communication) possesses and demonstrates unique technical knowledge."

Can you identify the “unique” functional expertise and technical knowledge referred to, and required to be demonstrated for this position?

Please reference Section C.

48 11-12 2.7 n/a For the base year of this solicitation, what are the anticipated locations for travel for the conduction of mission analysis, utility Security Assessments, and Mission Assurance Assessments?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

49 11-12 2.7 n/a For the base year of this solicitation, are there specific dates already set for the base year for execution of mission analysis, Utility Security Assessments, and Mission Assurance Assessments?

If the answer is yes, please provide a list of dates and locations for the execution of these assessments.

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

50 11-12 2.7 n/a For travel to execute tasks for mission analysis, Utility Security Assessments, and Mission Assurance Assessments, is there a set number of functional staff pre-determined by the Navy/Marine Corps to support each such assessment?

If the answer is yes, what are those pre-determined staff that will support each such assessment?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

51 4-10 J-3 Option Year Pricing

The Schedule of Services shows an across the board decrease in required staff hours in Option Year 1 and similar decreases in Option Years 2-4?

Per clause 52.216-1 Type of Contract (Apr. 1984), “The Government contemplates award of a Firm-Fixed- Price Indefinite Delivery Indefinite

Given the contract is anticipated to be a Firm Fixed Price Award, can the client describe any anticipated reduction in scope of work, decrease in MA Assessment throughput, or elimination of other work production requirements corresponding with staff decreases in the Option Years?

Quantity contract resulting from this solicitation.” Additionally, Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

Furthermore, reference Section L.6(a) Tab G, Note states “the quantities listed in Attachment J-3 Schedule of Services are estimates only and will not be ordered with the award of the basic contract. Actual quantities ordered over the duration of the contract are expected to vary and are not limited to those estimated in Attachment J-3 Schedule of Services and shall not exceed the total contract not-to-exceed amount of $95,000,000.00 (base period and all option years).”

52 5-6 1.3 n/a What are the minimum of staff technical positions required to support the conduct of each Utility Security Assessment?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

53 5-6 1.3 n/a What are the minimum of staff technical positions required to support the conduct of each Mission Assurance Assessment?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

54 10-11 2.5 n/a The RFP states for the Senior Planner, “The Senior Planner must be a U.S.

citizen and may require a minimum of a SECRET personnel security clearance if used to support Mission Assurance assessments.

Is the Senior Planner required to attend and support the MAA and/or the Utility Security Assessment?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

55 10-11 2.5 n/a 6. Section 2.5, pages 10-11: The RFP states for the junior Planner, “The Senior Planner must be a U.S. citizen and may require a minimum of a SECRET personnel security clearance if used to support Mission Assurance assessments.

Is the Senior Planner required to attend and support each MAA and/or the Utility Security Assessment?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

56 11 2.5 n/a Is the Senior GIS staff position required to travel in support of the Mission Assurance Assessment Team?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

57 11 2.5 n/a Is the Senior GIS staff position required to travel in support of the Utility Security Assessment Team?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

58 11 2.5 n/a Is the junior GIS staff position required to travel in support of the Mission Assurance Assessment Team?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

59 11 2.5 n/a Is the junior GIS staff position required to travel in support of the Utility Security Assessment Team?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

60 1-2 J-5 n/a Since the Corporate Experience Project Data Form attachment is included in the proposal response and is included in the page limit, may vendors convert this to Word, which will make it easier to manipulate and include in Volume 2?

Also, are the J-5 responses limited to 2 pages as the attachment suggests?

Offerors may edit the files as necessary to provide the submittal requirements listed in the solicitation.

61 11 2.7 1 It is understood that travel cost will be negotiated in accordance with the JTR per task order and billed as a fixed price item upon completion of the task.

For overseas travel is this where DBA insurance cost should be included or is there another line item for DBA insurance cost?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

62 all J-3 all Would the Government consider converting attachment J-3 to an editable format?

Offerors may edit the files as necessary to provide the submittal requirements listed in the solicitation.

63 2 A.2 1 The contract type states this will be a single award Firm Fixed Price IDIQ contract.

Will the government accept other cost offers that are not FFP, e.g., is a CPFF offer of interest and one that would be considered?

No.

64 11 2.7 1 It appears that all travel will be negotiated on a FFP basis.

Will the government consider a proposal where Travel is Cost Reimbursable (actual travel costs within per diem are reimbursed)?

No.

65 37 52.219-

(g) Is the NAICS code correct of 541960?

Or should it be 541690?

Please see revised Section I, FAR Clause 52.219-28

66 Can NAVFAC provide PDF fillable or WORD Docs for attachments J-3, J-6, J-7 and J-8?

Offerors may edit the files as necessary to provide the submittal requirements listed in the solicitation.

67 78 Tab K 3 Item b. states,"A list of the cleared personnel (Full Name and SSN) who are proposed to work on this effort so that the clearances of the Offeror personnel can be verified by the NAVFAC Atlantic Security Office." Does this mean that all positions requiring a security clearance must be identified by name and hold the clearance at the time the proposal is

Please reference Section H.2.

submitted? What if non-key positions are TBD?

68 37 52.219-

(g) Our company is not a Small Business under NAICS 541960. However, we are a SBA-certified 8a, SDB, Native American Owned Corporation with three-year average annual receipts under $27.5M. As such we will be submitting RFP Attachments J-7 and J-8 with our proposal. If we have not been awarded a previous contract as "Other than Small Business" and therefore do not have any prior ISRs are we required to submit Attachment J-6?

Please reference Section L.6 (b), Factor 4 (a)(1). “All offerors (SBs and other than SBs) shall submit small business subcontracting information associated with each project cited under the Corporate Experience Factor….in the format provided in Attachment J- 6...The proposal shall include an explanation for any project that does not require Attachment J-6.”

69 5

J L.6.b.1 M.2.b.1

Ref.

Table

Since most of the Section J reference guides have been deleted in Amendment 0001, does that mean offerors with experience in using these guides in performing MAAs, ESAs, OUTAs and AHTAs will not be provided a preferential evaluation factor or score?

Please see Amendment 0001.

70 78 (b) Can the font used in graphics be less than 10 point? (e.g., 8 pt or 9 pt?)

No.

71 77 Tab J Per Volume 1: Price, items a through c are required to be placed in a SEALED envelope. Is the offeror required to provide items a through c as electronic files on the two (2) electronic CDs with the price proposal?

This data is not to be included on the electronic copies you will provide via a non-rewritable CD.

72 78 (b) If an acronym list is placed in the Volume 2: Non-price Proposal response, will it count against the 50-page limitation?

Offerors shall comply with L.6 (b) submittal requirements.

73 Can government provide anticipated locations CONUS and OCONUS that will need CiP inspections in order to develop manning and travel funding CLINs?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

74 What is estimated travel and odc estimated?

Travel and ODCs will vary based on the individual task order performance work statements (PWS).

75 Can government provide estimated # DO Personnel under each key positions?

No.

76 Does government have IGCE that can be provided?

No.

77 As an organization we have substantive Past Performance over the past fifteen years performing Risk Mitigation; how back are we allowed to go with regard to Relevant Past Performance.

See Sections L and M for Factor 5 requirements.

78 9 (Ame nd 1)

L.6.(a).1 Tab G. Solicitation states "Firm fixed-price task orders will be negotiated for the services required under this contract using the fully burdened labor rates and percent mark-ups for travel and other direct costs proposed under Attachment J-3 Schedule of Services, for the base year and each option year (if exercised).

Section F of the solicitation makes reference to work being performed "within the Continental United States, the Far East, Europe, Africa, and South Western Asia. How does the Government intend Offeror's to propose fully burdened labor ceiling rates, which will be valid throughout the entire IDIQ contract, without specifically knowing OCONUS locations? Additionally, how are Offeror's to take into account potential shift premium pay from evening or weekend requirements as mentioned in Section C.2.6? Will TO specific requirements identified at the individual TO level allow for TO specific categories to be proposed instead of the standard CONUS based ceiling rates established at the IDIQ contract level?

Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).” Furthermore, reference Section L.6(a) Tab G, Note states “Actual quantities ordered over the duration of the contract are expected to vary and are not limited to those estimated in Attachment J-3 Schedule of Services and shall not exceed the total contract not-to-exceed amount of $95,000,000.00 (base period and all option years).” Additionally, the contractor indirect rate is established at time of award of the Basic IDIQ contract and will not be negotiated on task order by task order basis.

79 Vario us

C, M, J-

Various As written, the current PWS in Section C, Evaluation Criteria in Section M, and the Schedule of Services (J-3) do not collectively allow Offerors to demonstrate the true value of their technical and management approaches.

By fixing labor hours by labor category, there is no way for the government to determine the relative value of each technical approach. Would the government consider removing the Schedule of Services (J-3) and evaluating price and value based on individual Offeror responses to a sample Mission Assurance Assessment task that allows Offerors to highlight not only their technical and management approaches in action, but also their staffing plan and the resultant cost? Such an approach fosters true competition and facilitates government assessment of best value approach, as indicated in the RFP.

Please reference Section L.6(a) Tab G, Note states “the quantities listed in Attachment J-3 Schedule of Services are estimates only and will not be ordered with the award of the basic contract. Actual quantities ordered over the duration of the contract are expected to vary and are not limited to those estimated in Attachment J-3 Schedule of Services and shall not exceed the total contract not-to-exceed amount of $95,000,000.00 (base period and all option years).” Additionally, Section C states: “All work shall be performed in accordance with individual task order performance work statements (PWS).”

80 RFP L.6 3 -

Factor 3 Safety

Would Government confirm the EMR, DART, and TRC Rate data is excluded from the Volume II page count.

No, it is not excluded from the page count.

81 RFP L.6 4 -

Factor 4

Please confirm that the five page limit for supplemental narratives is excluded from the Volume II page count.

No, it is not excluded from the page count.

82 RFP All Proposal Graphics

Please confirm the minimum font size for graphics, tables, and charts is 8 point.

Minimum font size per Section L.6 is 10 point.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

SECTION L

L.1 SUBMITTING YOUR PROPOSAL

Proposals must be submitted via express mail carriers or hand –carried the following address:

Naval Facilities Engineering Command, Atlantic Attn: Kathleen Delashmitt and Erin Quimby Code ACQ22 Bldg A - Mail Room 6506 Hampton Blvd Norfolk, Virginia 23508-1278

The signature of the Offeror provided in Box 17 of the SF33 agrees, if this offer is accepted within 180 calendar days from the date of receipt of offers specified as the due date in Box 9 of the SF33 or any extended due date, to furnish any or all items upon which the prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

Annotate solicitation number N62470-17-R-4014 on the bottom of the envelope or box. Proposals must be received and date stamped at the stated address above no later than the date and time identified in block 9 on the SF33.

Hand-carried Proposal Security Information:

All visitors to NAVFAC Atlantic who do not have a CAC badge must have a background check run by the Naval Station Pass & ID office (Security Department at Commander, Naval Region Mid-Atlantic) and be issued a temporary DBIDS (Defense Biometric Identification System) visitor pass.

Visitors who do not have a CAC badge must complete the attached One Day Access Pass Request form (Excel spreadsheet) (Attachment J-1). Visitors must complete and forward the form directly to the following personnel in the security department via email:

1. Iris Gholston, 757-322-8116, iris.gholston@navy.mil

2. Robert Hernandez, 757-322-8044, robert.hernandez3@navy.mil

3. Steven K. Anderson, 757-322-8115, steven.k.anderson@navy.mil

Visitors must complete and provide the attached form to the security department NO LESS THAN 5 BUSINESS DAYS prior to either: 1) the proposal due date or; 2) the date on which the firm plans to hand-deliver their proposal, to allow ample time to process and complete the background check. Please also email a copy of the completed One Day Access Pass Request form (Attachment J-1) spreadsheet to the Contract Specialist, Mr.

Kathleen Delashmitt by email to kathleen.delashmitt@navy.mil.

Express mail carriers Security Information:

Commercial couriers such as FEDEX, DHL or UPS follow the same visitor procedures listed above and they are required to have a background check if they do not have a CAC badge. Commercial couriers must also have their vehicle inspected following LRA commercial vehicle inspection procedures prior to accessing the LRA. The Commercial Vehicle Inspection location for vehicles coming to NAVFAC Atlantic on the Lafayette River Annex (LRA) is located at the Naval Support Activity (NSA) Hampton Roads at the Meredith Street gate. The Meredith Street gate is located off of Terminal Boulevard.

Firms should check with their intended courier to ensure they have the proper identification credentials to access the LRA.

DBIDS passes must be picked up by the approved visitor from the Naval Station Pass and ID Office located at the following address prior to visiting NAVFAC Atlantic on LRA:

Address: Naval Station Pass and ID Office 9040 Hampton Blvd Building #CD9 Norfolk, VA 23505 Telephone Number: 757-322-2975 Hours of Operation: 0700 -1530 on Monday through Friday

All potential offerors must adhere to this notice in order to avoid delay in submitting your proposal. The level of security at Lafayette River Annex may change at any time. As the level of security heightens, the amount of time required to gain access to the Lafayette River Annex also increases.

L.2 PRE-AWARD INQUIRIES/REQUEST FOR PROPOSALS (RFP) INFORMATION/

CLARIFICATIONS/QUESTIONS

Con…