Date: 25 Oct 2021 From: Surface Warfare Schools Command N79 Director To: Surface Fire Fighter and Damage Control Trainers, Contractor Operation and Maintenance Services (COMS)
Subj: STANDARD OPERATING PROCEDURES FOR THE CLEANING OPERATIONS
AND PROCEDURES
Ref: (a) Sani Defenx FD Owner’s Manual.
1. Purpose: Cleaning Operations and Procedures.
2. Location: ELS San Diego, ELS Norfolk, ELS Mayport, ELS Yokosuka, ELS Pearl Harbor, SWESC Great Lakes.
3. Safety Warnings:
a. Always operate the Sani Defenx FD on a level surface.
b. No special ventilation is required as the Sani Defenx FD machine is fully enclosed.
c. The machine will not function with the door open. Please ensure that the door is closed prior to running the machine.
d. Please refer to the ozone monitor, affixed to the exterior of the machine, to determine when it is safe to open the cabinet doors.
e. Do not attempt to repair or modify components without Sani Defenx factory approval. This will void the warranty.
f. Do not run the drying rack heat cycle, inside the cabinet.
4. Equipment:
a. Sani Defenx FD:
(1) Sani Defenx FD Cabinet
(a) Ozone Generator
(b) Ozone Destruct
(c) Ozone Sensor
(d) Ozone Monitor
(2) Dryer Racks
5. Cleaning Operations:
a. During normal working hours COMS Shall dry and sanitize five (5) complete
b. FPG sets every 2 hours (20 set per day per unit).
6. Operating Procedures:
a. Place five (5) complete sets of fire protection gear on drying rack.
NOTE: If gear is wet or damp complete drying procedures prior to conducting Ozone Cycle.
7. Heat drying procedures dryer outside the cabinet:
a. Commence the heating cycle by turning the RED switch to the on position (If you have less than five (5) sets of gear, cover the empty skeleton with a garbage bag to ensure all heat is directed towards the turnout gear.)
b. The heater will reach approximately 100 degrees (38 degrees Celsius) after 20 minutes.
c. The dryer runs a 2-hour cycle.
8. Forced air drying procedures dryer inside the cabinet:
WARNING: DO NOT RUN THE HEAT CYCLE INSIDE THE CABINET.
a. Flip the green air fan switch to the on position.
b. Open the Sani Defenx FD Cabinet door and release the ramp.
c. Ensure that all controls and boxes are facing left and gently roll the drying rack all the way to the back of the cabinet. .
d. Plug the dryer into the outlet inside the cabinet.
e. Lift the ramp back into the cabinet and close the cabinet door.
f. Flip the white switch on the exterior of the cabinet.
g. The dryer runs a 2-hour cycle.
9. Ozone Sanitizing Procedures:
a. Open the Sani Defenx FD Cabinet door and release the ramp.
b. Ensure that all controls and boxes are facing left and gently roll the drying rack all the way to the back of the cabinet.
c. Lift the ramp back into the cabinet and close the cabinet door.
d. To start the cycle, press the on button on the Sani Sport Control Board and then press Cycle.
e. The ozone cycle will run for 1h30 minutes and will be followed by a 30 minute ozone destruct cycle (2 Hour run time).
f. Open the Sani Defenx FD Cabinet door and Release the ramp.
g. Gently roll the drying rack out of the cabinet.
Digitally signed by OUELLETTE.JOSEPH.MICHAEOUELLETTE.JOSE
PH.MICHAEL.109 L.1098269858
8269858
Date: 2021.10.25 08:23:44 -07'00'
J. M. OUELLETTE Deputy Director