Attachment_0011_SOP_GFP_Sanitation_Cabinet.docx

DOCX document 45 KB Posted

Attached to
PACNORWEST Turn Key live-fire Fire Fighting and Damage Control Training
Solicitation number
N6134022B0001
Issued by

View the file

Other files

File Type Posted
SF 1409.pdf PDF
Attachment_0009_QandA_v2.xlsx XLSX spreadsheet
N6134022B0001_AMD02.pdf PDF
Attachment_0001 - Amend 2_PNW Competitive Effort Performance Work Statement_10MAY22.doc DOC document
N6134022B0001_AMD02_CONFORM.pdf PDF
Attachment_0009_Question_and_Answer.xlsx XLSX spreadsheet
Attachment_0010-GFP Fire Sanitation Cabinet Owners Manual.pdf PDF
N6134022B0001_AMD01.pdf PDF
Attachment_0007_GFP_List_5.02.22.xlsx XLSX spreadsheet
Attachment_0001 - Amend 1_PNW Competitive Effort Performance Work Statement_05MAY22.doc DOC document
N6134022B0001_CONFORM_AMD01.pdf PDF
Attachment 4 Wage Adjustment Baseline Form.xlsx XLSX spreadsheet
CDRL A006- Technical Report_PACNORWEST.docx DOCX document
CDRL A008- QSP_PACNORWEST.docx DOCX document
Attachment 6 NETCINST 1500.13C (NETC High and Moderate Risk Training Safety Program).pdf PDF
Attachment 5 (TCCD) A-495-0018A Shipboard Firefighting Integrated Team Trainer.pdf PDF
Attachment 5 (TCCD) A-495-0416B General Shipboard Firefighting-(SCBA).pdf PDF
N6134022B0001.pdf PDF
CDRL A001 - Monthly Reports_PACNORWEST.doc DOC document
PWS Attachment 1 HRTSE Checklist and Firefighting Checklist.pdf PDF
Attachment_L1_PACNORWEST_Bid_Price.xlsx XLSX spreadsheet
CDRL A005 - Structural Integrity Survey_PACNORWEST.doc DOC document
Attachment 2 Data Item Transmittal (DIT) Form 4330.pdf PDF
Attachment 5 (TCCD) K-495-0045B General Shipboard Damage Control Training.pdf PDF
Attachment 5 (TCCD) J-495-0419B Advanced Shipboard Firefighting.pdf PDF
Attachment 5 (TCCD) A-495-0021 Shipboard Firefighting Damage Control Emergency Team Trainer.pdf PDF
CDRL A003 - Conference Minutes_PACNORWEST.doc DOC document
Attachment 8_Standard_Operating_Procedures.docx DOCX document
Attachment 3 DOL Wage Determination 15-5536 Rev 12 061020.pdf PDF
Attachment 7 GFP 071420 Final.xlsx XLSX spreadsheet
CDRL A002 - Contractor Operation and Mainentance of TSG_GFE Management report_PACNORWEST.doc DOC document
CDRL A007- Mishap Investigation and Reporting_PACNORWEST.docx DOCX document
CDRL A004 - Facility Modifications_PACNORWEST.doc DOC document
Attachment 1 - PNW Competitive Effort Performance Work Statement - signed.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 25 Oct 2021 From: Surface Warfare Schools Command N79 Director To: Surface Fire Fighter and Damage Control Trainers, Contractor Operation and Maintenance Services (COMS)

Subj: STANDARD OPERATING PROCEDURES FOR THE CLEANING OPERATIONS

AND PROCEDURES

Ref: (a) Sani Defenx FD Owner’s Manual.

1. Purpose: Cleaning Operations and Procedures.

2. Location: ELS San Diego, ELS Norfolk, ELS Mayport, ELS Yokosuka, ELS Pearl Harbor, SWESC Great Lakes.

3. Safety Warnings:

a. Always operate the Sani Defenx FD on a level surface.

b. No special ventilation is required as the Sani Defenx FD machine is fully enclosed.

c. The machine will not function with the door open. Please ensure that the door is closed prior to running the machine.

d. Please refer to the ozone monitor, affixed to the exterior of the machine, to determine when it is safe to open the cabinet doors.

e. Do not attempt to repair or modify components without Sani Defenx factory approval. This will void the warranty.

f. Do not run the drying rack heat cycle, inside the cabinet.

4. Equipment:

a. Sani Defenx FD:

(1) Sani Defenx FD Cabinet

(a) Ozone Generator

(b) Ozone Destruct

(c) Ozone Sensor

(d) Ozone Monitor

(2) Dryer Racks

5. Cleaning Operations:

a. During normal working hours COMS Shall dry and sanitize five (5) complete

b. FPG sets every 2 hours (20 set per day per unit).

6. Operating Procedures:

a. Place five (5) complete sets of fire protection gear on drying rack.

NOTE: If gear is wet or damp complete drying procedures prior to conducting Ozone Cycle.

7. Heat drying procedures dryer outside the cabinet:

a. Commence the heating cycle by turning the RED switch to the on position (If you have less than five (5) sets of gear, cover the empty skeleton with a garbage bag to ensure all heat is directed towards the turnout gear.)

b. The heater will reach approximately 100 degrees (38 degrees Celsius) after 20 minutes.

c. The dryer runs a 2-hour cycle.

8. Forced air drying procedures dryer inside the cabinet:

WARNING: DO NOT RUN THE HEAT CYCLE INSIDE THE CABINET.

a. Flip the green air fan switch to the on position.

b. Open the Sani Defenx FD Cabinet door and release the ramp.

c. Ensure that all controls and boxes are facing left and gently roll the drying rack all the way to the back of the cabinet. .

d. Plug the dryer into the outlet inside the cabinet.

e. Lift the ramp back into the cabinet and close the cabinet door.

f. Flip the white switch on the exterior of the cabinet.

g. The dryer runs a 2-hour cycle.

9. Ozone Sanitizing Procedures:

a. Open the Sani Defenx FD Cabinet door and release the ramp.

b. Ensure that all controls and boxes are facing left and gently roll the drying rack all the way to the back of the cabinet.

c. Lift the ramp back into the cabinet and close the cabinet door.

d. To start the cycle, press the on button on the Sani Sport Control Board and then press Cycle.

e. The ozone cycle will run for 1h30 minutes and will be followed by a 30 minute ozone destruct cycle (2 Hour run time).

f. Open the Sani Defenx FD Cabinet door and Release the ramp.

g. Gently roll the drying rack out of the cabinet.

Digitally signed by OUELLETTE.JOSEPH.MICHAEOUELLETTE.JOSE

PH.MICHAEL.109 L.1098269858

8269858

Date: 2021.10.25 08:23:44 -07'00'

J. M. OUELLETTE Deputy Director

File details come from the government source that posted it. Updated .