TMSS 19F1B (NORFOLK) CDRLs_AS_ (10 JUN 19).pdf

PDF 105 KB Posted

Attached to
Surface Fire Fighting Trainer Smoke/Fog Generation System Federal contract opportunity
Solicitation number
N6134020R0013
Issued by
Department of the Navy Naval Air Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Surface Fire Fighting Trainer Smoke/Fog Generation System, newest first.
File Type Posted
IMG_NP_DCWT_114920.jpg JPG image
Questions-Responses 11 DEC 2019.xlsx XLSX spreadsheet
IMG_SD_DCWT_081625987.jpg JPG image
Smoke_MOD_PRF190016(Nov2019)_Final.docx DOCX document
IMG_NP_DCWT_114930.jpg JPG image
PM 19F3A (NEWPORT) CDRLs_P_(10 JUN 19).doc DOC document
IMG_SD_DCWT_123450073.jpg JPG image
Smoke_MOD_SOW190015(Nov2019)__Final.docx DOCX document
IMG_SD_DCWT_081603006.jpg JPG image
IMG_NP_DCWT_114957.jpg JPG image
20R00130001.docx DOCX document
Site Visit P.O.C Information.docx DOCX document
Norfolk hatch_scuttle.jpg JPG image
ILSM 19F3B (SAN DIEGO) CDRLs_BD_(10 JUN 19).pdf PDF
PROV 19F3A (NEWPORT) CDRLs_Q_(16 JUL 2019).pdf PDF
ILSM 19F3A (NEWPORT) CDRLs_R_(10 JUN 19).pdf PDF
PROV 19F5 (GREAT LAKES RTC) CDRLs_BQ_(16 JUL 2019).pdf PDF
PM 19F3C (GREAT LAKES) CDRLs_V_(10 JUN 19).pdf PDF
PM 19F1A (MAYPORT) CDRLs_B_(10 JUN 19).pdf PDF
PROV 19F1B (NORFOLK) CDRLs_AQ_(16 JUL 19).pdf PDF
TMSS 19F3B (SAN DIEGO) CDRLs_BE_ (10 JUN 19).pdf PDF
PM 19F1B (NORFOLK) CDRLs_AP_(10 JUN 19).pdf PDF
PM 19F3B (SAN DIEGO) CDRLs_BB_(10 JUN 19).pdf PDF
PM 19F3B (NORFOLK) CDRLs_BH_(10 JUN 19).pdf PDF
ENG 19F3C (GREAT LAKES) CDRLs_U_(10 JUN19).pdf PDF
TMSS 19F4A (SAN DIEGO) CDRLs_AE_ (10 JUN 19).pdf PDF
PM 19F4A (NORFOLK) CDRLs_AH_(10 JUN 19).pdf PDF
ENG 19F4A (SAN DIEGO) CDRLs_AA_(10 JUN19).pdf PDF
Attachment 3 - DIT_Form_-_Data-Item-Transmittal_-_2013.pdf PDF
TMSS 19F3C (GREAT LAKES) CDRLs_Y_(10 JUN 19).pdf PDF
Attachment 5 - TMCR_19-13_2019-06-11.pdf PDF
Attachment 4 - GFP_GFI Smoke.docx DOCX document
ILSM 19F3C (GREAT LAKES) CDRLs_X_(10 JUN 19).pdf PDF
ENG 19F1B (SAN DIEGO) CDRLs_AU_(10 JUN19).pdf PDF
PROV 19F4A (SAN DIEGO) CDRLs_AC_(16 JUL 2019).pdf PDF
TMSS 19F1B (SAN DIEGO) CDRLs_AY_ (10 JUN 19).pdf PDF
ENG 19F3B (SAN DIEGO) CDRLs_BA_(10 JUN19).pdf PDF
TMSS 19F3B (NORFOLK) CDRLs_BL_ (10 JUN 19).pdf PDF
PROV 19F4A (NORFOLK) CDRLs_AJ_(16 JUL 2019).pdf PDF
ILSM 19F3B (NORFOLK) CDRLs_BK_(10 JUN 19).pdf PDF
ILSM 19F4A (MAYPORT) CDRLs_K_(10 JUN 19).pdf PDF
TMSS 19F1A (MAYPORT) CDRLs_E_(10 JUN 19).pdf PDF
TMSS 19F4A (NORFOLK) CDRLs_AL_ (10 JUN 19).pdf PDF
PROV 19F3B (SAN DIEGO) CDRLs_BC_(16 JUL 2019).pdf PDF
ILSM 19F1B (SAN DIEGO) CDRLs_AX_(10 JUN 19).pdf PDF
PROV 19F4A (MAYPORT) CDRLs_J_(16 JUL 2019).pdf PDF
Attachment 2 - Smoke_MOD_PRF190016(Sep2019)_FinalDraft_KAGdocx.docx DOCX document
L-2 GFI-Request_NDA.docx DOCX document
ENG 19F1A (MAYPORT) CDRLs_A_r1(10 sept19).pdf PDF
ENG 19F3B (NORFOLK) CDRLs_BG_(10 JUN19).pdf PDF
Show all 50

Surface Fire Fighting Trainer Smoke/Fog Generation System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0024 AS TDP TM X OTHER ________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

FFT 19F1B S/N 2 N61340-

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

AS01 OPERATION AND MAINTENANCE (O&M) MANUAL

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

NAWCTSD TMCR 19-13 SOW PARA 3.2.9.3 PMS 339

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

SD REQUIRED 4 TIMES SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

D

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final A N/A SEE BLK 16 Reg Repro

16. REMARKS NAWCTSD TMSS 1 1 0

1. BLK 8: THE GOVERNMENT WILL HAVE 45 CALENDAR DAYS FOR REVIEW AND

ACCEPT, ACCEPT WITH COMMENTS, OR REJECT EACH SUBMISSION.

THE CONTRACTOR SHALL HAVE 30 CALENDAR DAYS TO CORRECT AND

RESUBMIT REJECTED MATERIALS.

2. BLK 12: THE FIRST SUBMISSION SHALL BE DUE 20 CALENDAR DAYS PRIOR TO

THE FIRST IN-PROCESS REVIEW (IPR). FIRST SUBMISSION IS NOT REQUIRED

FOR FOLLOW ON DEVICE 19F1B OPTION AWARDS.

3. BLK 13: THE SECOND SUBMISSION SHALL BE DUE 20 CALENDAR DAYS PRIOR

TO THE SECOND IN-PROCESS REVIEW (IPR).

THE THIRD SUBMISSION (PRELIMINARY) SHALL BE DUE 10 CALENDAR DAYS

AFTER THE PHYSICAL CONFIGURATION AUDIT.

THE FOURTH SUBMISSION (FINAL) SHALL BE DUE 30 CALENDAR DAYS AFTER

ACCEPTANCE OF THE PRELIMINARY SUBMISSION.

4. BLK 14: DELIVERABLES SHALL BE IN ACCORDANCE WITH TMCR 19-13.

THE FIRST AND SECOND SUBMISSIONS ARE NOT REQUIRED FOR NAWCTSD

ISEO.

THE NAWCTSD ILSM, PJM, AND PCO SHALL RECEIVE LETTER NOTIFICATIONS

FOR EACH DELIVERY.

THE FINAL MANUAL SHALL BE PROVIDED FOR ANY PREVIOUS DELIVERED

DEVICE 19F1B OPTION AWARD SITE TO MAINTAIN THE SAME

DOCUMENTATION CONFIGURATION FOR ALL 19F1B TRAINERS.

NAWCTSD ISEO NF 1 1 0

NAWCTSD ILSM 0 0 0

NAWCTSD PJM 0 0 0

NAWCTSD PCO 0 0 0

NAWCTSD ISEO SD 0 1 0

SD = SAN DIEGO S/N 1

NF = NORFOLK S/N 2

15. TOTAL ▬▬▬▬► 2 3 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

M. WATT, CODE 6.8.5.1 10 JUNE 2019 ROBERTO SOTO-ALBINO, NAWCTSD PJM 10 JUNE 2019

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 4 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0024 AS TDP TM X OTHER ________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

FFT 19F1B S/N 2 N61340-

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

AS02 PLANNED MAINTENANCE SYSTEM (PMS)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

NAWCTSD TMCR 19-13 SOW PARA 3.2.9.3 PMS 339

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

SD REQUIRED 4 TIMES SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

D

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final A N/A SEE BLK 16 Reg Repro

16. REMARKS NAWCTSD TMSS 1 1 0

1. BLK 8: THE GOVERNMENT WILL HAVE 45 CALENDAR DAYS FOR REVIEW AND

ACCEPT, ACCEPT WITH COMMENTS, OR REJECT EACH SUBMISSION.

THE CONTRACTOR SHALL HAVE 30 CALENDAR DAYS TO CORRECT AND

RESUBMIT REJECTED MATERIALS.

2. BLK 12: THE FIRST SUBMISSION SHALL BE DUE 20 CALENDAR DAYS PRIOR TO

THE FIRST IN-PROCESS REVIEW (IPR). FIRST SUBMISSION IS NOT REQUIRED

FOR FOLLOW ON DEVICE 19F1B OPTION AWARDS.

3. BLK 13: THE SECOND SUBMISSION SHALL BE DUE 20 CALENDAR DAYS PRIOR

TO THE SECOND IN-PROCESS REVIEW (IPR).

THE THIRD SUBMISSION (PRELIMINARY) SHALL BE DUE 10 CALENDAR DAYS

AFTER THE PHYSICAL CONFIGURATION AUDIT.

THE FOURTH SUBMISSION (FINAL) SHALL BE DUE 30 CALENDAR DAYS AFTER

THE NAWCTSD ILSM, PJM, AND PCO SHALL RECEIVE LETTER NOTIFICATIONS

FOR EACH DELIVERY.

THE FINAL MANUAL SHALL BE PROVIDED FOR ANY PREVIOUS DELIVERED

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 4 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0024 AS TDP TM X OTHER ________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

FFT 19F1B S/N 2 N61340-

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

AS03 INSTRUCTOR’S UTILIZATION HANDBOOK

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

NAWCTSD TMCR 19-13 SOW PARA 3.2.9.3 PMS 339

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

SD REQUIRED 4 TIMES SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

D

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final A N/A SEE BLK 16 Reg Repro

16. REMARKS NAWCTSD TMSS 1 1 0

1. BLK 8: THE GOVERNMENT WILL HAVE 45 CALENDAR DAYS FOR REVIEW AND

ACCEPT, ACCEPT WITH COMMENTS, OR REJECT EACH SUBMISSION.

THE CONTRACTOR SHALL HAVE 30 CALENDAR DAYS TO CORRECT AND

RESUBMIT REJECTED MATERIALS.

2. BLK 12: THE FIRST SUBMISSION SHALL BE DUE 20 CALENDAR DAYS PRIOR TO

THE FIRST IN-PROCESS REVIEW (IPR). FIRST SUBMISSION IS NOT REQUIRED

FOR FOLLOW ON DEVICE 19F1B OPTION AWARDS.

3. BLK 13: THE SECOND SUBMISSION SHALL BE DUE 20 CALENDAR DAYS PRIOR

TO THE SECOND IN-PROCESS REVIEW (IPR).

THE THIRD SUBMISSION (PRELIMINARY) SHALL BE DUE 10 CALENDAR DAYS

AFTER THE PHYSICAL CONFIGURATION AUDIT.

THE FOURTH SUBMISSION (FINAL) SHALL BE DUE 30 CALENDAR DAYS AFTER

THE NAWCTSD ILSM, PJM, AND PCO SHALL RECEIVE LETTER NOTIFICATIONS

FOR EACH DELIVERY.

THE FINAL MANUAL SHALL BE PROVIDED FOR ANY PREVIOUS DELIVERED

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 3 of 4 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0024 AS TDP TM X OTHER ________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

FFT 19F1B S/N 2 N61340-

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

AS04 COMMERCIAL OFF-THE-SHELF (COTS) MANUALS

AND ASSOCIATED SUPPLEMENTAL DATA

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

NAWCTSD TMCR 19-13 SOW PARA 3.2.9.3 PMS 339

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

SD REQUIRED 4 TIMES SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

D

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final A N/A SEE BLK 16 Reg Repro

16. REMARKS NAWCTSD TMSS 1 1 0

1. BLK 8: THE GOVERNMENT WILL HAVE 45 CALENDAR DAYS FOR REVIEW AND

ACCEPT, ACCEPT WITH COMMENTS, OR REJECT EACH SUBMISSION.

THE CONTRACTOR SHALL HAVE 30 CALENDAR DAYS TO CORRECT AND

RESUBMIT REJECTED MATERIALS.

2. BLK 12: THE FIRST SUBMISSION SHALL BE DUE 20 CALENDAR DAYS PRIOR TO

THE FIRST IN-PROCESS REVIEW (IPR). FIRST SUBMISSION IS NOT REQUIRED

FOR FOLLOW ON DEVICE 19F1B OPTION AWARDS.

3. BLK 13: THE SECOND SUBMISSION SHALL BE DUE 20 CALENDAR DAYS PRIOR

TO THE SECOND IN-PROCESS REVIEW (IPR).

THE THIRD SUBMISSION (PRELIMINARY) SHALL BE DUE 10 CALENDAR DAYS

AFTER THE PHYSICAL CONFIGURATION AUDIT.

THE FOURTH SUBMISSION (FINAL) SHALL BE DUE 30 CALENDAR DAYS AFTER

THE NAWCTSD ILSM, PJM, AND PCO SHALL RECEIVE LETTER NOTIFICATIONS

FOR EACH DELIVERY.

THE FINAL MANUAL SHALL BE PROVIDED FOR ANY PREVIOUS DELIVERED

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 4 of 4 Pages

File details come from the government source that posted it. Updated .