Questions-Responses 11 DEC 2019.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Surface Fire Fighting Trainer Smoke/Fog Generation System Federal contract opportunity
Solicitation number
N6134020R0013
Issued by
Department of the Navy Naval Air Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Surface Fire Fighting Trainer Smoke/Fog Generation System, newest first.
File Type Posted
IMG_NP_DCWT_114930.jpg JPG image
PM 19F3A (NEWPORT) CDRLs_P_(10 JUN 19).doc DOC document
IMG_SD_DCWT_123450073.jpg JPG image
Smoke_MOD_SOW190015(Nov2019)__Final.docx DOCX document
IMG_SD_DCWT_081603006.jpg JPG image
IMG_NP_DCWT_114957.jpg JPG image
20R00130001.docx DOCX document
Site Visit P.O.C Information.docx DOCX document
Norfolk hatch_scuttle.jpg JPG image
IMG_SD_DCWT_081514064.jpg JPG image
IMG_NP_DCWT_114853.jpg JPG image
TMSS 19F3C (GREAT LAKES) CDRLs_Y_(10 JUN 19).pdf PDF
Attachment 5 - TMCR_19-13_2019-06-11.pdf PDF
Attachment 4 - GFP_GFI Smoke.docx DOCX document
ILSM 19F3C (GREAT LAKES) CDRLs_X_(10 JUN 19).pdf PDF
ENG 19F1B (SAN DIEGO) CDRLs_AU_(10 JUN19).pdf PDF
PROV 19F4A (SAN DIEGO) CDRLs_AC_(16 JUL 2019).pdf PDF
TMSS 19F1B (SAN DIEGO) CDRLs_AY_ (10 JUN 19).pdf PDF
ENG 19F3B (SAN DIEGO) CDRLs_BA_(10 JUN19).pdf PDF
TMSS 19F3B (NORFOLK) CDRLs_BL_ (10 JUN 19).pdf PDF
PROV 19F4A (NORFOLK) CDRLs_AJ_(16 JUL 2019).pdf PDF
ILSM 19F3B (NORFOLK) CDRLs_BK_(10 JUN 19).pdf PDF
ILSM 19F4A (MAYPORT) CDRLs_K_(10 JUN 19).pdf PDF
TMSS 19F1A (MAYPORT) CDRLs_E_(10 JUN 19).pdf PDF
TMSS 19F4A (NORFOLK) CDRLs_AL_ (10 JUN 19).pdf PDF
PROV 19F3B (SAN DIEGO) CDRLs_BC_(16 JUL 2019).pdf PDF
ILSM 19F1B (SAN DIEGO) CDRLs_AX_(10 JUN 19).pdf PDF
PROV 19F4A (MAYPORT) CDRLs_J_(16 JUL 2019).pdf PDF
Attachment 2 - Smoke_MOD_PRF190016(Sep2019)_FinalDraft_KAGdocx.docx DOCX document
L-2 GFI-Request_NDA.docx DOCX document
ENG 19F1A (MAYPORT) CDRLs_A_r1(10 sept19).pdf PDF
TMSS 19F1B (NORFOLK) CDRLs_AS_ (10 JUN 19).pdf PDF
ENG 19F3B (NORFOLK) CDRLs_BG_(10 JUN19).pdf PDF
ILSM 19F5 (GREAT LAKES RTC) CDRLs_BR_(10 JUN 19).pdf PDF
PM 19F4A (SAN DIEGO) CDRLs_AB_(10 JUN 19).pdf PDF
ENG 19F3A (NEWPORT) CDRLs_N_(10 JUN19).pdf PDF
PM 19F5 (GREAT_LAKES RTC) CDRLs_BP_(10 JUN 19).pdf PDF
ENG 19F1B (NORFOLK) CDRLs_AN_(10 JUN19).pdf PDF
PROV 19F3B (NORFOLK) CDRLs_BJ_(16 JUL 2019).pdf PDF
TMSS 19F3A (NEWPORT) CDRLs_S_(10 JUN 19).pdf PDF
ILSM 19F1A (MAYPORT) CDRLs_D_(10 JUN 19).pdf PDF
Final RFP.docx DOCX document
PM 19F3A (NEWPORT) CDRLs_P_(10 JUN 19).pdf PDF
Attachment 1 - Smoke_MOD_SOW190015(Sept2019)__FinalCLEAN.docx DOCX document
L-1 Submittal of 11 OCT 2019 -N6134020R0013_FFT_Questions_and_Answers (002).xlsx XLSX spreadsheet
PROV 19F1A (MAYPORT) CDRLs_C_(16 JUL 2019).pdf PDF
PROV 19F3C (GREAT LAKES) CDRLs_W_(16 JUL 19).pdf PDF
ILSM 19F4A (NORFOLK) CDRLs_AK_(10 JUN 19).pdf PDF
PM 19F4A (MAYPORT) CDRLs_H_(10 JUN 19).pdf PDF
PM 19F1B (SAN DIEGO) CDRLs_AV_(10 JUN 19).pdf PDF
Show all 50

Surface Fire Fighting Trainer Smoke/Fog Generation System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Conformed QA N6134020R0013: Surface Firefighting Trainer (FFT) Smoke System Replacement/Aqueous Film Forming Foam (AFFF) System Removal Visual System Upgrade and Resolution of Hardware Obsolescence as of 19 January 2015

QuestionReferenceAnswerReferenceParagraphPageSource
23Attachment 1 - Smoke_MOD_SOW190015(Sept2019)__FinalCLEAN.docx is dated 21 August 2019 and is marked draft throughout. When will the final SOW be released?SOWUpdated to reflect final SOW.
24Attachment 2 - Smoke_MOD_PRF190016(Sep2019)_FinalDraft_KAGdocx.docx is dated 21 August 2019 and is marked draft throughout. When will the final SPEC be released?SPECUpdated to reflect final SPEC.
25The PM 19F3A (NEWPORT) CDRLs_P_(10 JUN 19).pdf file contains the Newport CDRLs but Block D references the 19F3C device. Please clarify.CDRLsBlock D has been updated to reflect the 19F3A device.
26There are no Engineering CDRL file for the 19F5 device. Is this intentional or an oversight?CDRLsIntentional. Engineering CDRLs are not required for the 19F5 device.
27Based on the answer to question 9 above, there is no equipment removal associated with the 19F5 AFFF system. CLIN 0038 is described as "AFFF System Removal" for "RTC Great Lakes". Should the Supplies / Services be clarified to read "AFFF Surrogate Fluid Removal"?Section BUpdated to clarify AFFF Surrogate Fluid Removal on CLIN 0038.
28There were 4 pictures of hatches provided showing 3 hatches that need replacing. Please provide pictures of all hatches and scuttles that need to be replaced along with their locations in each trainer. What specific Hatches and scuttles need to be replaced?GFIPictures of hatch/scuttles per site provided.
29With the release of the RFP on the 25th just prior to the holidays and pre-planned vacations and the lack of GFE and GFI to date, we request an extension of the due date for the RFP until 22nd of JanuaryRFPRFP will be due 23 January 2020
30Please provide additional site visits to the DCWT sites to ensure subcontractors have the opportunity to accurately evaluate the extent of repairsRFPAdditional site visits are authorized for Newport, RI and Norfolk, VA DCWT devices during the week of Dec 16-20 only. POCs for each site are below, contractors MUST coordinate with the site prior to finalizing travel arrangements.
31Site Visit for hatches and deck platesNewport POC: Tom Arbige, NAWCTSD ISEO; 401-841-7133
32Site Visit for hatches and deck platesNorfolk POC: Eric Lee, NAWCTSD ISEO; 757-572-7525
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

File details come from the government source that posted it. Updated .