PM 19F3A (NEWPORT) CDRLs_P_(10 JUN 19).doc

DOC document 289 KB Posted

Attached to
Surface Fire Fighting Trainer Smoke/Fog Generation System Federal contract opportunity
Solicitation number
N6134020R0013
Issued by
Department of the Navy Naval Air Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Surface Fire Fighting Trainer Smoke/Fog Generation System, newest first.
File Type Posted
IMG_NP_DCWT_114920.jpg JPG image
Questions-Responses 11 DEC 2019.xlsx XLSX spreadsheet
IMG_SD_DCWT_081625987.jpg JPG image
Smoke_MOD_PRF190016(Nov2019)_Final.docx DOCX document
IMG_NP_DCWT_114930.jpg JPG image
ILSM 19F3B (SAN DIEGO) CDRLs_BD_(10 JUN 19).pdf PDF
PROV 19F3A (NEWPORT) CDRLs_Q_(16 JUL 2019).pdf PDF
ILSM 19F3A (NEWPORT) CDRLs_R_(10 JUN 19).pdf PDF
PROV 19F5 (GREAT LAKES RTC) CDRLs_BQ_(16 JUL 2019).pdf PDF
PM 19F3C (GREAT LAKES) CDRLs_V_(10 JUN 19).pdf PDF
PM 19F1A (MAYPORT) CDRLs_B_(10 JUN 19).pdf PDF
PROV 19F1B (NORFOLK) CDRLs_AQ_(16 JUL 19).pdf PDF
TMSS 19F3B (SAN DIEGO) CDRLs_BE_ (10 JUN 19).pdf PDF
PM 19F1B (NORFOLK) CDRLs_AP_(10 JUN 19).pdf PDF
PM 19F3B (SAN DIEGO) CDRLs_BB_(10 JUN 19).pdf PDF
PM 19F3B (NORFOLK) CDRLs_BH_(10 JUN 19).pdf PDF
ENG 19F3C (GREAT LAKES) CDRLs_U_(10 JUN19).pdf PDF
TMSS 19F4A (SAN DIEGO) CDRLs_AE_ (10 JUN 19).pdf PDF
PM 19F4A (NORFOLK) CDRLs_AH_(10 JUN 19).pdf PDF
ENG 19F4A (SAN DIEGO) CDRLs_AA_(10 JUN19).pdf PDF
Attachment 3 - DIT_Form_-_Data-Item-Transmittal_-_2013.pdf PDF
TMSS 19F3C (GREAT LAKES) CDRLs_Y_(10 JUN 19).pdf PDF
Attachment 5 - TMCR_19-13_2019-06-11.pdf PDF
Attachment 4 - GFP_GFI Smoke.docx DOCX document
ILSM 19F3C (GREAT LAKES) CDRLs_X_(10 JUN 19).pdf PDF
ENG 19F1B (SAN DIEGO) CDRLs_AU_(10 JUN19).pdf PDF
PROV 19F4A (SAN DIEGO) CDRLs_AC_(16 JUL 2019).pdf PDF
TMSS 19F1B (SAN DIEGO) CDRLs_AY_ (10 JUN 19).pdf PDF
ENG 19F3B (SAN DIEGO) CDRLs_BA_(10 JUN19).pdf PDF
TMSS 19F3B (NORFOLK) CDRLs_BL_ (10 JUN 19).pdf PDF
PROV 19F4A (NORFOLK) CDRLs_AJ_(16 JUL 2019).pdf PDF
ILSM 19F3B (NORFOLK) CDRLs_BK_(10 JUN 19).pdf PDF
ILSM 19F4A (MAYPORT) CDRLs_K_(10 JUN 19).pdf PDF
TMSS 19F1A (MAYPORT) CDRLs_E_(10 JUN 19).pdf PDF
TMSS 19F4A (NORFOLK) CDRLs_AL_ (10 JUN 19).pdf PDF
PROV 19F3B (SAN DIEGO) CDRLs_BC_(16 JUL 2019).pdf PDF
ENG 19F1B (NORFOLK) CDRLs_AN_(10 JUN19).pdf PDF
PROV 19F3B (NORFOLK) CDRLs_BJ_(16 JUL 2019).pdf PDF
TMSS 19F3A (NEWPORT) CDRLs_S_(10 JUN 19).pdf PDF
ILSM 19F1A (MAYPORT) CDRLs_D_(10 JUN 19).pdf PDF
Final RFP.docx DOCX document
PM 19F3A (NEWPORT) CDRLs_P_(10 JUN 19).pdf PDF
Attachment 1 - Smoke_MOD_SOW190015(Sept2019)__FinalCLEAN.docx DOCX document
L-1 Submittal of 11 OCT 2019 -N6134020R0013_FFT_Questions_and_Answers (002).xlsx XLSX spreadsheet
PROV 19F1A (MAYPORT) CDRLs_C_(16 JUL 2019).pdf PDF
PROV 19F3C (GREAT LAKES) CDRLs_W_(16 JUL 19).pdf PDF
ILSM 19F4A (NORFOLK) CDRLs_AK_(10 JUN 19).pdf PDF
PM 19F4A (MAYPORT) CDRLs_H_(10 JUN 19).pdf PDF
PM 19F1B (SAN DIEGO) CDRLs_AV_(10 JUN 19).pdf PDF
ILSM 19F1B (NORFOLK) CDRLs_AR_(10 JUN 19).pdf PDF
Show all 50

Surface Fire Fighting Trainer Smoke/Fog Generation System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
V ASK \* MERGEFORMAT
TDP
TM
OTHER ADMINISTRATIVE DATA
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

FFT 19F3A

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

P001
CONTRACTOR’S PROGRESS, STATUS AND MANAGEMENT REPORT (CPSMR)
PROGRESS REPORT
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-80227
SOW, PARA 3.1.1
NAWCTSD PJM
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
REQUIRED
MTHLY
SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE IF SUBSEQUENT SUBM.
Draft
Final

N/A

SEE BLK 16

Reg
Repro
16. REMARKS
NAWCTSD PJM

1. BLKS 12/13: FIRST SUBMISSION SHALL BE THE 10TH DAY OF THE SECOND MONTH AFTER CONTRACT AWARD. SUBSEQUENT SUBMISSIONS SHALL BE DUE MONTHLY THROUGH THE END OF THE CONTRACT.

2. THE GOVERNMENT WILL HAVE FIFTEEN (15) DAYS FOR REVIEW AND

ACCEPTANCE/REJECTION OF EACH SUBMISSION.

3. BLK 14: SUBMISSIONS SHALL BE PROVIDED IN MICROSOFT© OFFICE WORD 2016 VIA E-MAIL. EMAIL ADDRESSES ARE PROVIDED IN THE CONTRACT SCHEDULE.

4. ACCEPTANCE OF ANY PROGRESS REPORT WHICH INCLUDES

INFORMATION CONCERNING CHANGES IN CONTRACT REQUIREMENTS/

STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT

AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE

PROCURING CONTRACTING OFFICER (PCO) CAN SUCH CHANGES BE MADE.

5. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION statement D. Distribution authorized to DEPARTMENT OF DEFENSE and U.S. DOD contractors only for administrative or operational use, 1 nOVEMBER 2012. Other requests for this document shall be referred to NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION, pjm, Code 1.3.6.1, 12211 SCIENCE DR., ORLANDO, FL 32826-3224.

NAWCTSD ENGR

NAWCTSD ILSM

NAWCTSD TMSS

NAWCTSD MSS

NAWCTSD PCO

LTR
ONLY
15. TOTAL ▬▬▬▬►
0
0
5
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

A. SANTOS, NAWCTSD ENGR

R. SOTO-ALBINO PROGRAM MANAGER

DD FORM 1423-1, FEB 2001

PREVIOUS EDITION MAY BE USED

Page 1 of 4 Pages

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
V ASK \* MERGEFORMAT
TDP
TM
OTHER ADMINISTRATIVE DATA
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

FFT 19F3A

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

P002
INTEGRATED PROGRAM MANAGEMENT REPORT (IPMR)
INTEGRATED MASTER SCHEDULE (IMS)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

DI-MGMT-81861A
SOW, PARA 3.1.1
NAWCTSD PJM
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
REQUIRED
MTHLY
SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE IF SUBSEQUENT SUBM.
Draft
Final

N/A

SEE BLK 16

Reg
Repro

16. REMARKS

NAWCTSD PJM

THE CONTRACTOR SHALL PROVIDE MONTHLY IPMRS IMS COMPONENTS PER DI-MGMT-81861A EXCEPT AS MODIFIED PER THE FOLLOWING:

1. THE APPLICABLE SECTIONS OF THE IPMR DID ARE 1.3, 1.5, 2.2.5, 2.3, 2.5.1, 2.6.1, 2.7, AND 3.7.

2. BLKS 12/13: FIRST SUBMISSION SHALL BE THE 10TH DAY OF THE SECOND MONTH AFTER CONTRACT AWARD AND SHALL BE COMBINED WITH THE CONTRACTOR’S PROGRESS, STATUS AND MANAGEMENT REPORT. SUBSEQUENT SUBMISSIONS SHALL BE DUE MONTHLY THROUGH THE END OF THE CONTRACT.

3. THE GOVERNMENT WILL HAVE FIFTEEN (15) DAYS FOR REVIEW AND

ACCEPTANCE/REJECTION OF EACH SUBMISSION.

4. BLK 14: SUBMISSIONS SHALL BE PROVIDED IN MICROSOFT© OFFICE PROJECT 2016 AND PDF VIA E-MAIL. EMAIL ADDRESSES ARE PROVIDED IN THE CONTRACT SCHEDULE.

5. ACCEPTANCE OF ANY INTEGRATED MASTER SCHEDULE (IMS) WHICH INCLUDES INFORMATION CONCERNING CHANGES IN CONTRACT REQUIREMENTS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE PROCURING CONTRACTING OFFICER (PCO) CAN SUCH CHANGES BE MADE.

6. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION statement D. Distribution authorized to DEPARTMENT OF DEFENSE and U.S. DOD contractors only for administrative or operational use, 1 NOVEMBER 2012. Other requests for this document shall be referred to NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION, pjm, Code 1.3.6.1, 12211 SCIENCE DR., ORLANDO, FL 32826-3224.

NAWCTSD ENGR

NAWCTSD ILSM

NAWCTSD TMSS

NAWCTSD MSS

NAWCTSD PCO

LTR
ONLY
15. TOTAL ▬▬▬▬►
0
0
5
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

A. SANTOS, NAWCTSD ENGR

R. SOTO-ALBINO PROGRAM MANAGER

Page 2 of 4 Pages

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
V ASK \* MERGEFORMAT
TDP
TM
OTHER ADMINISTRATIVE DATA
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

FFT 19F3A

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

P003
CONFERENCE AGENDA
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

DI-ADMN-81249B
SOW, PARA 3.2.3
NAWCTSD PJM
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
REQUIRED
ASREQ
SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE IF SUBSEQUENT SUBM.
Draft
Final

N/A

SEE BLK 16

Reg
Repro
16. REMARKS
NAWCTSD PJM

1. BLKS 12/13: SUBMISSIONS SHALL BE DUE FIVE (5) WORKING DAYS PRIOR TO EACH CONTRACT SCHEDULED CONFERENCE/REVIEW/MEETING THROUGH THE END OF CONTRACT.

2. THE GOVERNMENT WILL HAVE THREE (3) WORKING DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION.

3. BLK 14: SUBMISSIONS SHALL BE PROVIDED IN MICROSOFT© OFFICE WORD 2016 VIA E-MAIL. E-MAIL ADDRESSES ARE LOCATED IN THE CONTRACT SCHEDULE.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION statement D. Distribution authorized to DEPARTMENT OF DEFENSE and U.S. DOD contractors only for administrative or operational use, 1 NOVEMBER 2012. Other requests for this document shall be referred to NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION, pjm, Code 1.3.6.1, 12211 SCIENCE DR., ORLANDO, FL 32826-3224.

NAWCTSD ENGR

NAWCTSD ILSM

NAWCTSD TMSS

NAWCTSD MSS

NAWCTSD PCO

LTR
ONLY
15. TOTAL ▬▬▬▬►
0
0
5
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

A. SANTOS, NAWCTSD ENGR

R. SOTO-ALBINO PROGRAM MANAGER

Page 3 of 4 Pages

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
V ASK \* MERGEFORMAT
TDP
TM
OTHER ADMINISTRATIVE DATA
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

FFT 19F3A

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

P004
CONFERENCE MINUTES
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

DI-ADMN-81250B
SOW, PARA 3.2.3
NAWCTSD PJM
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
REQUIRED
ASREQ
SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE IF SUBSEQUENT SUBM.
Draft
Final

N/A

SEE BLK 16

Reg
Repro
16. REMARKS
NAWCTSD PJM
1

1. BLKS 12/13: DRAFT MINUTES SHALL BE SUBMITTED FOR APPROVAL WITHIN FIVE (5) WORKING DAYS AFTER THE COMPLETION OF EACH CONFERENCE/REVIEW/MEETING. FINAL DISTRIBUTION SHALL NOT BE MADE UNTIL DRAFT MINUTES ARE APPROVED BY NAWCTSD PJM VIA THE PROCURING CONTRACTING OFFICER (PCO). FINAL MINUTES WILL BE DISTRIBUTED WITHIN FIVE (5) WORKING DAYS AFTER THE RECEIPT OF GOVERNMENT ACCEPTANCE OF DRAFT.

2. THE GOVERNMENT WILL HAVE FIVE (5) WORKING DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION.

3. BLK 14: SUBMISSION SHALL BE PROVIDED IN MICROSOFT© OFFICE WORD 2016. E-MAIL ADDRESSES ARE PROVIDED IN THE CONTRACT SCHEDULE.

4. ACCEPTANCE OF ANY MINUTES WHICH INCLUDE INFORMATION CONCERNING CHANGES IN CONTRACT REQUIREMENTS/ STANDARDS/ SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE PROCURING CONTRACTING OFFICER (PCO) CAN SUCH CHANGES BE MADE.

5. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION statement D. Distribution authorized to DEPARTMENT OF DEFENSE and U.S. DOD contractors only for administrative or operational use, 1 NOVEMBER 2012. Other requests for this document shall be referred to NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION, pjm, Code 1.3.6.1, 12211 SCIENCE DR., ORLANDO, FL 32826-3224.

NAWCTSD ENGR

NAWCTSD ILSM

NAWCTSD TMSS

NAWCTSD MSS

NAWCTSD PCO

LTR
ONLY
15. TOTAL ▬▬▬▬►
1
0
5
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

A. SANTOS, NAWCTSD ENGR

R. SOTO-ALBINO PROGRAM MANAGER

Page 4 of 4 Pages

File details come from the government source that posted it. Updated .