L-1 Submittal of 11 OCT 2019 -N6134020R0013_FFT_Questions_and_Answers (002).xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Surface Fire Fighting Trainer Smoke/Fog Generation System
Solicitation number
N6134020R0013
Issued by

View the file

Other files

File Type Posted
IMG_SD_DCWT_081748691.jpg JPG image
IMG_SD_DCWT_081514064.jpg JPG image
20R00130001 (conformed).docx DOCX document
PM 19F3A (NEWPORT) CDRLs_P_(10 JUN 19).doc DOC document
IMG_NP_DCWT_114853.jpg JPG image
Smoke_MOD_PRF190016(Nov2019)_Final.docx DOCX document
IMG_NP_DCWT_114920.jpg JPG image
IMG_NP_DCWT_114930.jpg JPG image
IMG_SD_DCWT_081436957.jpg JPG image
IMG_Norfolk.jpg JPG image
IMG_NP_DCWT_114846.jpg JPG image
IMG_NP_DCWT_114855.jpg JPG image
Questions-Responses 11 DEC 2019.xlsx XLSX spreadsheet
IMG_SD_DCWT_081625987.jpg JPG image
20R00130001.docx DOCX document
IMG_SD_DCWT_081603006.jpg JPG image
Site Visit P.O.C Information.docx DOCX document
Smoke_MOD_SOW190015(Nov2019)__Final.docx DOCX document
IMG_SD_DCWT_123450073.jpg JPG image
IMG_NP_DCWT_114957.jpg JPG image
Norfolk hatch_scuttle.jpg JPG image
TMSS 19F4A (MAYPORT) CDRLs_L_(10 JUN 19).pdf PDF
ENG 19F4A (MAYPORT) CDRLs_G_(10 JUN19).pdf PDF
ENG 19F4A (NORFOLK) CDRLs_AG_(10 JUN19).pdf PDF
PM 19F4A (SAN DIEGO) CDRLs_AB_(10 JUN 19).pdf PDF
ENG 19F3A (NEWPORT) CDRLs_N_(10 JUN19).pdf PDF
TMSS 19F1A (MAYPORT) CDRLs_E_(10 JUN 19).pdf PDF
PROV 19F4A (SAN DIEGO) CDRLs_AC_(16 JUL 2019).pdf PDF
ILSM 19F4A (SAN DIEGO) CDRLs_AD_(10 JUN 19).pdf PDF
ILSM 19F5 (GREAT LAKES RTC) CDRLs_BR_(10 JUN 19).pdf PDF
PM 19F5 (GREAT_LAKES RTC) CDRLs_BP_(10 JUN 19).pdf PDF
PROV 19F1B (NORFOLK) CDRLs_AQ_(16 JUL 19).pdf PDF
TMSS 19F3B (SAN DIEGO) CDRLs_BE_ (10 JUN 19).pdf PDF
Attachment 1 - Smoke_MOD_SOW190015(Sept2019)__FinalCLEAN.docx DOCX document
ILSM 19F1A (MAYPORT) CDRLs_D_(10 JUN 19).pdf PDF
ILSM 19F3A (NEWPORT) CDRLs_R_(10 JUN 19).pdf PDF
PM 19F1B (NORFOLK) CDRLs_AP_(10 JUN 19).pdf PDF
PM 19F3B (NORFOLK) CDRLs_BH_(10 JUN 19).pdf PDF
TMSS 19F3B (NORFOLK) CDRLs_BL_ (10 JUN 19).pdf PDF
ENG 19F1B (SAN DIEGO) CDRLs_AU_(10 JUN19).pdf PDF
ILSM 19F4A (MAYPORT) CDRLs_K_(10 JUN 19).pdf PDF
ILSM 19F3C (GREAT LAKES) CDRLs_X_(10 JUN 19).pdf PDF
Final RFP.docx DOCX document
TMSS 19F3A (NEWPORT) CDRLs_S_(10 JUN 19).pdf PDF
ENG 19F3B (SAN DIEGO) CDRLs_BA_(10 JUN19).pdf PDF
ILSM 19F3B (NORFOLK) CDRLs_BK_(10 JUN 19).pdf PDF
TMSS 19F3C (GREAT LAKES) CDRLs_Y_(10 JUN 19).pdf PDF
PROV 19F3B (SAN DIEGO) CDRLs_BC_(16 JUL 2019).pdf PDF
TMSS 19F4A (SAN DIEGO) CDRLs_AE_ (10 JUN 19).pdf PDF
PM 19F3C (GREAT LAKES) CDRLs_V_(10 JUN 19).pdf PDF
Show 40 more

Latest 50 of 82 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Conformed QA N6134020R0013: Surface Firefighting Trainer (FFT) Smoke System Replacement/Aqueous Film Forming Foam (AFFF) System Removal Visual System Upgrade and Resolution of Hardware Obsolescence as of 19 January 2015

QuestionReferenceAnswerReferenceParagraphPageSource
1CLIN 0010 - Please confirm the Option Exercise Window for this CLIN is 24 MACA, vice 12 MACA as noted for CLINs 0007 - 0009RFP Section B.4Correct to reflect 12 monthsB.423 of 67
2Technical Data CLINs - Given that numerous CDRLs are due after Trainer Acceptance, Section F delivery requirements for Technical Data CLINs should not be the same as the milestones for Device CLINs. Please revise Section F requirements for Tech Data CLINs to reflect DD-1423 requirementsRFP Section F.1Look at RFP pg 31, Tech Data CLINs have been updatedF.131 of 67
3Section 2.1.1 states "the offeror shall provide firm fixed prices for all CLINs listed in Section B". Given that the process defined within 5252.217-9500 will be used for PIOs, we believe PIO CLINS should not be priced at this time. Instead, "TBN" should be entered within Section B for all PIO CLINs. Please confirm our understanding and clarify Section L instructions as appropriate.RFP Section L, Part B 2.1.1TBN has been entered in section B. Section L, 2.1.1 has been corrected.L, Part B 2.1.160 of 67
4Section 2.1.1 requires submittal of a completed Section B. Section 2.1.3.3 includes a second submittal of Section B as well as Section K. Please clarify this redundant requirement for Section B within Section 2.1.3.3. Should Section 2.1.3.3 include only a completed Section K?RFP Section L, Part B 2.1.3.3Corrected with final RFP releaseL, Part B 2.1.3.360 of 67
5Section M-1, Part A, 4.0 states that the Government may incorporate proposed features that benefit the Government into the SOW or SPEC that exceed RFP requirements. While Section M Part B, 1.0 details only two specific technical areas, please confirm that the Government will evaluate and consider within its Award Decision proposed features that are not within the two identified areas.RFP Section M-1, Part A, 4.0Govt will evaluate the technical areas onlyM-1, Part A, 4.064 of 67
6Please provide a copy of TMCR 19-13SOW Section 2.1The package will be delivered at the final RFP.2.13
7Section 3.2.8.12.1 Baseline Configuration Audit (BCA) states "Testing will be accomplished during non-training hours. No tests or examinations shall interfere with training." Will the government provide all personnel required to run all simulations?SOW Section 3.2.8.12.1Yes, Government and COMS will be available to support.3.2.8.12.1
83283962PRF Section 2.1.2.3Yes, flush and reuse hoses.2.1.2.3
92.1.2.5 a. "The existing AFFF system shall be retained except for the removal/flush and cap of the AFFF surrogate fluid." Please confirm that there is no equipment removal associated with the 19F5 AFFF system or clarify otherwise.PRF Section 2.1.2.5Yes, confirm2.1.2.5
103.1.2.4 a. "The existing standalone smoke system for the Egress Chamber compartment shall be replaced with a remote controlled unit." Please confirm that the 19F5 standalone smoke system will not be controlled through the IOS.PRF Section 3.1.2.4Yes, confirm3.1.2.4
113.1.2.6.1 "Damage Control Wet Trainer (DCWT) compartment hatches and scuttles replacement." Will hatches and scuttles be provided as GFE? If not, will manufacturer information and part numbers be provided?PRF Section 3.1.2.6.1The Government does not have this information available at the time.3.1.2.6.1
123.1.2.5 c. "The enclosed compartment containing the AFFF surrogate shall be certified free of all gases prior to accessing the compartment to flush the AFFF surrogate." Will Navy Gas Free Engineering Services be available to perform the required testing as inferred by NAVAL SHIPS’ TECHNICAL MANUAL CHAPTER 074 VOLUME 3 - GAS FREE ENGINEERING?PRF Section 3.1.2.5Government does not have the capability to provide Gas Free services. Contractor will need to provide these services for their staff. RTC Safety POC is Mr. Victor Hernandez (847) 688-4949 XT 2193.1.2.5
13In response to a previous question regarding pictures taken by Government representatives during Industry Day, the Government said that the pictures will be "downloaded to NECO". When will all pictures captured by the Government during site visits be posted?Previous Question SubmittalAll photos have been posted that will be posted.
14In response to a previous question regarding drawings for DCWTs the Government stated that "All DWCT drawings will be provided if Government has available". When will the drawings for the DCWTs be made available?Previous Question SubmittalThe Governement does not have DCWT drawings available.
15In the response to a previous question requesting facility drawings that showed plumbing for the AFFF system it was stated that there are "No digital copies are currently available for transmit". Can the Government provide them in hardcopy or picture format?Previous Question SubmittalNo, hardcopy or picture formats available.
16In response to a previous question requesting O&M Manuals as drawing packages for Device 19F3A SN1 and 19F1A SN1 the Government stated that the documents will be provided with the RFP. Can the Government provide now since the Draft RFP has been released? Can the Government also include the documentation for the 19F5 Device?Previous Question SubmittalOfferors utilize Attachment L-2 GFI-Request NDA to request manuals
173.1.2.3 a. "The AFFF System shall be removed which consists of mixing tanks, holding tanks, associated piping, pumps and frame structure." In building 510 Great Lakes (19F3C) there is a 6,008 gallon AFFF tank. Is there a door or removable panel that this tank will fit through to remove it from the building?PRF Section 3.1.2.3No, must be cut to be removed. A freight elevator is available3.1.2.3
183.1.2.3 d. "The AFFF System piping shall be terminated and capped at the ends of each section piped to another location." When a pipe passes through a ceiling, wall or floor, can the contractor cap at the nearest fitting (elbow or coupling) to the penetration?PRF Section 3.1.2.3All Safety regarding trip hazard or head injuries need to be considered. Floors cuts shall be flushed to the floor and filled with concrete. Wall cuts shall protrude the length of the cap. Base Safety personnel will provide direction on-site.3.1.2.3
193.1.2.3 d. "The AFFF System piping shall be terminated and capped at the ends of each section piped to another location." When a pipe passes through a compartment and is not connected to any equipment (valve, tank, gauge etc.) within that compartment, does the pipe need to be removed? Example: 19F3C in building 510 Great Lakes the trainer is at one end of the building and a 6,008 gallon tank is at the other end of the building.PRF Section 3.1.2.3AFFF non-usable piping shall be removed. The long run piping will be retained as it's not cost effective nor practical. We want to retain the AFFF piping within the fireplaces so that we can charge with water for additional water hoses for backup. The AFFF piping (colored green) that remains in use, shall be repainted RED to reflect that process water is being used. For RTC (19F5) piping may be left in place, especially within the tank room since tanks will not be removed. Pipes should be flushed clean and disconnected and capped at opposite end from the tank3.1.2.3
203.1.2.2 d. "The smoke/fog generation system shall include the removal of existing piping and tanks (nitrogen cylinders/fluid drums) associated with the current smoke/fog system." When a pipe passes through a ceiling, wall or floor, can the contractor cap at the nearest fitting (elbow or coupling) to the penetration?PRF Section 3.1.2.2Piping for nitrogen and smoke fluid shall be removed. All conduit can be terminated into a junction box if unused.3.1.2.2
213.1.2.2 d. "The smoke/fog generation system shall include the removal of existing piping and tanks (nitrogen cylinders/fluid drums) associated with the current smoke/fog system." When a pipe passes through a compartment and is not connected to any equipment (valve, tank, gage etc.) within that compartment, does the pipe need to be removed?PRF Section 3.1.2.2All piping for nitrogen and smoke fluid shall be removed..3.1.2.2
22Will the Government allow refurbishment subcontractors to visit Damage Control Wet Trainers for estimating purposes?Visit requestYes. It needs to be coordinated with NAWCTSD and the site.
23
24
25
26
27
28
29
30
31
32
33
34
35
363.2.26.17.1 Baseline Configuration Audit (BCAs)

The contractor shall perform a BCA for both device 2F107-1 and 2F176, located in NASJRB FT Worth. The BCAs will be a coordinated effort among the Government, the modification contractor, and the Contractor Operation and Maintenance of Simulators (COMS) contractor. The contractor shall utilize device 2F176 as the initial functional baseline for this effort. The principal method for obtaining the required data for the 2F176 and 2F107-1 devices shall be by examination of existing documents, drawings, and publications and by testing IAW the pre-modification TTPRR for each device. Testing shall be accomplished during non-training hours. No tests or examinations shall interfere with training

37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

File details come from the government source that posted it. Updated .