A002_Quality Control Plan_6 Nov 2019.pdf
PDF 80 KB Posted
- Attached to
- Advanced Helicopter Training System Program for Ground Based Training System (N61340-19-R-0096)
- Solicitation number
- N6134019R0096
About this file
This document contains a Contract Data Requirements List (CDRL) and information about an upcoming Industry Day event. The CDRL outlines quality control plan requirements for the Advanced Helicopter Training System program. A draft program level quality control plan must be submitted 14 days before mobilization, with an update 30 days later and a final plan due by the last day of mobilization. The Navy will have 10 days to review drafts and 15 days for the final.
The Industry Day announcement provides details about an event on July 9-10, 2019 to increase awareness of capabilities for the Advanced Helicopter Training System Ground Based Training System program. It will include an overview of the draft Performance Work Statement and allow one-on-one sessions for industry to ask questions. Registration is required by June 28, 2019 for both the general session and one-on-one meetings. The primary point of contact is Cynthia Armound and secondary is Erin Young.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
| 1_DATA_ITEM_NO: A002 |
| 2_TITLE_OF_DATA_ITEM: Quality Control Plan (QCP) |
| 3_SUBTITLE: |
| 4_AUTHORITY_Data_Acquisit: OT-19-00026 |
| 5_CONTRACT_REFERENCE: PWS Addendum A 2.4 |
| 6_REQUIRING_OFFICE: PMA-273 |
| 7_DID_250_REQ: DD |
| 8_APP_CODE: A |
| DIST_STATEMENT: C (SEE BLK 16) |
| 10_FREQUENCY: SEE BLK 16 |
| 11_AS_OF_DATE: N/A |
| 12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16 |
| addressee1: (SEE BLK 16) |
| draft1: |
| reg1: 1 |
| repro1: |
| addressee2: |
| draft2: |
| reg2: |
| repro2: |
| addressee3: |
| draft3: |
| reg3: |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_repro: 0 |
| 16_REMARKS: Block 9: Distribution Statement C: Distribution Authorized to U.S. Government agencies and their contractors for administrative or operational use November 5, 2019. Other requests for this document shall be referred to the Naval Undergraduate Flight Training Systems Program Office, PMA-273, 48187 Standley Road, Bldg 4010, Patuxent River, MD 20670. |
Blocks 10,12,13: A draft program level QCP shall be submitted fourteen days prior to the mobilization period. An update to the QCP shall be submitted thirty calendar after the mobilization period begins. A final QCP shall be submitted on the last day of the final working week of the mobilization period. The Government has ten days for review and comment on the draft submittals. The Contractor will resubmit drafts with corrections within ten days. The Government has 15 days for review and acceptance or rejection the final submission.
Block 14: Data submittal shall be IAW Attachment 3 “Supplement to the Exhibits: Contract Data Requirements List (CDRL) data submission, Government Integrated Data Environment (IDE) instructions."
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| H_DATE: |
| J_DATE: |
| Page: 1 |
| reg38t: 1 |
| A_CONTRACT_LINE_ITEM_NO: |
| B_EXHIBIT: A |
| TDP: |
| TM: |
| OTHER: OT |
| DSYSTEMITEM: CNATRA TH-73 ATS |
| E_CONTRACTPR_NO: N61340-19-R-0096 |
| FCONTRACTOR: TBD |
| of_pages: 1 |
| Reset: |
| G_PREPARED_BY: JOSHUA CROUSE, NAWCTSD IPTL |
| G_APPROVED_BY: CHRISTINA HALL, PMA-273 ROTARY DPM |
| Form Date: PMA265 ACQ 08MAY15 |
File details come from the government source that posted it. Updated .