N6134019R0022_Amend0002_FINAL_6Aug19.docx

DOCX document 96 KB Posted

Attached to
FY20 RRL CC Final RFP Posting
Solicitation number
N6134019R0022
Issued by

About this file

N6134019R0022 Amendment 0002 FINAL

View the file

Other files

File Type Posted
FY20_Final_RFP_QA_Amend02.pdf PDF
Atch PDF
N6134019R0022_SecL_SecM_Track_Changes_Amend02.pdf PDF
N6134019R0022_Conformed_Copy_Amend0002.docx DOCX document
N6134019R0022_Amend0002_Announcement_6Aug19.pdf PDF
Atch —
N6134019R0022_Amend0001_SecM_Track_Changes.pdf PDF
N6134019R0022_Conformed_Copy_Amend0001.docx DOCX document
Atch PDF
Atch —
N6134019R0022_Amend0001_Announcement_12Jul19.pdf PDF
N6134019R0022_Amend0001_SecL_Track_Changes.pdf PDF
FY20_Final_RFP_QA_Amend0001.pdf PDF
N6134019R0022_Amend0001.zip ZIP file
N6134019R0022_Amend0001_FINAL_12Jul19.docx DOCX document
TDPC_Contact_List_10Jul19.xlsx XLSX spreadsheet
FY20_CC_RFP_PPQ_Info_2Jul19.pdf PDF
N6134019R0022_FY20CC_RFP_Announcement_28Jun19.pdf PDF
TDPC_Contact_List_5Nov18_(2).xlsx XLSX spreadsheet
Att_(L-1)_Q&A_Form_21Mar2019.xlsx XLSX spreadsheet
DRAFT_RFP_Q&A_Government_POSTING_28Jun19.pdf PDF
Atch_(L-3)_Past_Performance_Questionaire(PPQ).docx DOCX document
Atch_(L-2)_PastPerformanceContractReferenceWorksheet.docx DOCX document
N6134019R0022_FINAL_RFP_28Jun19.docx DOCX document
Atch_(L-4)_Relevancy_Information_of_the_PP_Contract_FINAL_28Jun19.docx DOCX document
FY20_CC_PreSolSign-In_Sheet.pdf PDF
FY20_CC_PreSolConf_rv1.pptx PPTX presentation
N6134019R0022_DRAFT.docx DOCX document
Atch_(1)_S2025_RRL_FY20CC_SOW.docx DOCX document
Atch_(L-1)_Q&A_Form_21Mar2019.xlsx XLSX spreadsheet
TDPC_Contact_List_Lot_1_FA_2.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6134019R0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

The reason for this solicitation amendment is to:

A. Answer Industry Questions

B. Section A

· Extend proposal submission to 11:00am Eastern Time on Friday, 23 August 2019. See Block 9 of Standard Form 33 of the RFP.

C. Section B

· Update CLINs 0002, 0003, and 0004 to remove “Basic Engineering Common Core (BECC)” and replace with “Engineering Professional Apprenticeship Career Track (EPACT).” EPACT was originally on CLINs 1013, 1014, and 1015. As a result of BECC becoming part of EPACT, and EPACT being reflected on CLINs 0002, 0003, and 0004, CLINs 1013, 1014, and 1015 have been removed and are now RESERVED.

D. Section F

· Update tables in F.1 to remove font bolding and “ * ” from references to CDRL F006

· Update F.1 in CDRL table to show CLINs 0002, 0003, and 0004 represent EPACT

· Update F.1 to remove the CDRL table for CLINs 1013, 1014, and 1015

· Update F.3 (table) to remove CLINs 1013, 1014, and 1015 from the Option Schedule

E. Section L

· Update Part A, 3.2

· Add Part A, 3.5

· Update Part B, 1.1.a

· Update Part B, 1.1.c

· Update Part B, 1.1.f

· Update Part B, 1.1.l, Row 6b within table (changed “Hardware” to “Product”)

· Update Part B, 1.1.l, Row 12 within table

· Update reference notations in Part B, 1.1.l, Rows 13, 14, 15, 16, and 21 within table

· Add a new Reference Note 1 below table within Part B, 1.1.l. Pre-existing reference notes to this table are re-numbered.

· Update Part B, 1.1.o

· Update Attachment L-4

F. Section M

· Update Part B, 1.2.a

G. Statement of Work (SOW)

· Remove “Draft” watermark

· Update Figure 1 within the SOW

· Update Section 3.5 to remove sentence that referenced Section 3.3.7.

· Basic Engineering Common Core (BECC) is now part of Engineering Professional Apprenticeship Track (EPACT). As such, references to BECC throughout the SOW have been removed.

· Removed references to Computer Aided Instructions (CAI) and Instructor Led Training (ILT) throughout SOW to align with Appendix A, which references Instructor Facilitated Interactive Courseware (IFIT ICW) and Self-Directed Interactive Courseware (SDIT).

· Updated Section 3.3.1.3

· Updated Mobile Requirements in Section 3.4.7.2 and as applicable throughout the SOW to clarify mobile ready vice mobile optimized

· Update Appendix A to account for updates to data set information for the following ratings: HT, EN, MM, MR, EPACT, RP, GSE, GSM, EM, and DC.

· Update Appendix F to add note to GSE

· Update Appendix F, CLIN 0011 to align with Appendix A

· Update Appendix F to account for a change in number of Content Conversion data gathering trips

· Update Appendix F to align with Appendix A updates

· Update Appendix J to remove reference to BECC

H. Exhibits

· Update applicable Exhibit F CDRLs to remove references to CLINs 1013, 1014, and 1015

· Update CDRL F00B, Block 16, Note 4

· Update CDRL F00C, Block 16, Note 4

· Update CDRL F00G, Block 16, Note 5

The following have been deleted:

AMENDMENT 0001 BLOCK 14

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 12-Aug-2019 02:00 PM to 23-Aug-2019 11:00 AM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0002

The CLIN description has changed from BECC, Content Conversion to EPACT, Content Conversion.

The CLIN extended description has changed from:

Basic Engineering Common Core (BECC), Content Conversion

To:

Engineering Professional Apprenticeship Career Track (EPACT), Content Conversion

CLIN 0003

The CLIN description has changed from BECC, T3 to EPACT, T3.

Basic Engineering Common Core (BECC), Train the Trainer (T3)Upon exercise of this option, delivery of this CLIN shall be 4 months after delivery of BECC Content Conversion CLIN.

Engineering Professional Apprenticeship Career Track (EPACT), Train the Trainer (T3)Upon exercise of this option, delivery of this CLIN shall be 4 months after delivery of BECC Content Conversion CLIN.

CLIN 0004

The CLIN description has changed from BECC, Pilot to EPACT, Pilot.

Basic Engineering Common Core (BECC), PilotUpon exercise of this option, delivery of this CLIN shall be 4 months after delivery of BECC T3 CLIN.

Engineering Professional Apprenticeship Career Track (EPACT), PilotUpon exercise of this option, delivery of this CLIN shall be 4 months after delivery of BECC T3 CLIN.

CLIN 1013

The CLIN type priced has been deleted.

The CLIN description has changed from EPACT, Content Conversion to RESERVED.

The CLIN extended description has changed from:

Engineering Professional Apprenticeship Career Track (EPACT), Content ConversionDelivery of this CLIN shall be 24 months after this option is exercised.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

The pricing detail quantity 1.00 has been deleted.

The unit of issue Each has been deleted.

The option status has changed from Option to No Status.

The FOB Destination has been deleted.

The PSC code 6910 has been deleted.

The PROG code C9E has been deleted.

The WSC Equipment code 000 has been deleted.

The NAICS code 541330 has been deleted.

The MDAP/MAIS Code 000 has been deleted.

CLIN 1014

The CLIN description has changed from EPACT, T3 to RESERVED.

The CLIN extended description has changed from:

Engineering Professional Apprenticeship Career Track (EPACT), Train the Trainer (T3)Upon exercise of this option, delivery of this CLIN shall be 4 months after delivery of the EPACT Content Conversion CLIN.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

The unit of issue Each has been deleted.

The option status has changed from Option to No Status.

The FOB Destination has been deleted.

CLIN 1015

The CLIN description has changed from EPACT, Pilot to RESERVED.

The CLIN extended description has changed from:

Engineering Professional Apprenticeship Career Track (EPACT), PilotUpon exercise of this option, delivery of this CLIN shall be 4 months after delivery of the EPACT T3 CLIN.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

The unit of issue Each has been deleted.

The option status has changed from Option to No Status.

The FOB Destination has been deleted.

The PSC code 6910 has been deleted.

The PROG code C9E has been deleted.

The WSC Equipment code 000 has been deleted.

The NAICS code 541330 has been deleted.

The MDAP/MAIS Code 000 has been deleted.

SECTION E - INSPECTION AND ACCEPTANCE

The Acceptance/Inspection Schedule for CLIN 1013 has been changed from:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
N/A
N/A
N/A
N/A

The Acceptance/Inspection Schedule for CLIN 1014 has been changed from:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
N/A
N/A
N/A
N/A

The Acceptance/Inspection Schedule for CLIN 1015 has been changed from:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
N/A
N/A
N/A
N/A

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule for CLIN 1013 has been deleted:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
01-DEC-2022
1
NAWCTSD

JUDY DELANEY

12211 SCIENCE DRIVE

ORLANDO FL 32826-3224

407-380-8494 FOB: Destination N61340

The following Delivery Schedule for CLIN 1014 has been deleted:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
01-APR-2023
1
NAWCTSD

JUDY DELANEY

12211 SCIENCE DRIVE

ORLANDO FL 32826-3224

407-380-8494

N61340

The following Delivery Schedule for CLIN 1015 has been deleted:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
01-AUG-2023
1
NAWCTSD

JUDY DELANEY

12211 SCIENCE DRIVE

ORLANDO FL 32826-3224

407-380-8494

N61340

The following have been modified:

F.3 OPTION SCHEDULE

The Government may unilaterally exercise any or all of the Option CLINs in accordance with FAR clause 52.217-7 and within the time frames specified in the below F.3 Table, Option CLINs Exercise Timeframe Periods. After the Option CLINs are exercised, the following delivery schedule will apply and the “DELIVERY INFORMATION” will be updated accordingly:

F.3 TABLE

Option CLIN
Exercise Time Frame Start*
Exercise Time Frame End**
Delivery
0003
20 Months After Contract Award
24 Months After Contract Award
4 Months After Government Acceptance of Applicable Content Conversion CLIN
0004
20 Months After Contract Award
28 Months After Contract Award
4 Months After Government Acceptance of Applicable T3 CLIN
0006
20 Months After Contract Award
24 Months After Contract Award
4 Months After Government Acceptance of Applicable Content Conversion CLIN
0007
20 Months After Contract Award
28 Months After Contract Award
4 Months After Government Acceptance of Applicable T3 CLIN
0009
8 Months After Contract Award
12 Months After Contract Award
4 Months After Government Acceptance of Applicable Content Conversion CLIN
0010
8 Months After Contract Award
16 Months After Contract Award
4 Months After Government Acceptance of Applicable T3 CLIN
0012
8 Months After Contract Award
12 Months After Contract Award
4 Months After Government Acceptance of Applicable Content Conversion CLIN
0013
8 Months After Contract Award
16 Months After Contract Award
4 Months After Government Acceptance of Applicable T3 CLIN
0015
20 Months After Contract Award
24 Months After Contract Award
4 Months After Government Acceptance of Applicable Content Conversion CLIN
0016
20 Months After Contract Award
28 Months After Contract Award
4 Months After Government Acceptance of Applicable T3 CLIN
0018
20 Months After Contract Award
24 Months After Contract Award
4 Months After Government Acceptance of Applicable Content Conversion CLIN
0019
20 Months After Contract Award
28 Months After Contract Award
4 Months After Government Acceptance of Applicable T3 CLIN
0021
20 Months After Contract Award
24 Months After Contract Award
4 Months After Government Acceptance of Applicable Content Conversion CLIN
0022
20 Months After Contract Award
28 Months After Contract Award
4 Months After Government Acceptance of Applicable T3 CLIN
0024
20 Months After Contract Award
24 Months After Contract Award
4 Months After Government Acceptance of Applicable Content Conversion CLIN
0025
20 Months After Contract Award
28 Months After Contract Award
4 Months After Government Acceptance of Applicable T3 CLIN
1001
At Contract Award
1 March 2021
21 Months After Exercise of Option
1002
As soon as 17 Months after the applicable Contract Conversion CLIN has been exercised
1 December 2022
4 Months After Government Acceptance of Applicable Content Conversion CLIN
1003
As soon as 20 Months after the applicable Contract Conversion CLIN has been exercised
1 April 2023
4 Months After Government Acceptance of Applicable T3 CLIN
1004
At Contract Award
1 March 2021
21 Months After Exercise of Option
1005
As soon as 17 Months after the applicable Contract Conversion CLIN has been exercised
1 December 2022
4 Months After Government Acceptance of Applicable Content Conversion CLIN
1006
As soon as 20 Months after the applicable Contract Conversion CLIN has been exercised
1 April 2023
4 Months After Government Acceptance of Applicable T3 CLIN
1007
At Contract Award
1 March 2021
21 Months After Exercise of Option
1008
As soon as 17 Months after the applicable Contract Conversion CLIN has been exercised
1 December 2022
4 Months After Government Acceptance of Applicable Content Conversion CLIN
1009
As soon as 20 Months after the applicable Contract Conversion CLIN has been exercised
1 April 2023
4 Months After Government Acceptance of Applicable T3 CLIN
1010
At Contract Award
1 March 2021
21 Months After Exercise of Option
1011
As soon as 17 Months after the applicable Contract Conversion CLIN has been exercised
1 December 2022
4 Months After Government Acceptance of Applicable Content Conversion CLIN
1012
As soon as 20 Months after the applicable Contract Conversion CLIN has been exercised
1 April 2023
4 Months After Government Acceptance of Applicable T3 CLIN
1016
At Contract Award
1 March 2021
21 Months After Exercise of Option
1017
As soon as 17 Months after the applicable Contract Conversion CLIN has been exercised
1 December 2022
4 Months After Government Acceptance of Applicable Content Conversion CLIN
1018
As soon as 20 Months after the applicable Contract Conversion CLIN has been exercised
1 April 2023
4 Months After Government Acceptance of Applicable T3 CLIN
1019
At Contract Award
1 March 2021
21 Months After Exercise of Option
1020
As soon as 17 Months after the applicable Contract Conversion CLIN has been exercised
1 December 2022
4 Months After Government Acceptance of Applicable Content Conversion CLIN
1021
As soon as 20 Months after the applicable Contract Conversion CLIN has been exercised
1 April 2023
4 Months After Government Acceptance of Applicable T3 CLIN

*The START date means that the Government may commence to exercise the Option CLIN on this date.

**The END date means that this is the last date in which the Government may exercise this Option CLIN.

Note that for ALL Option CLINs, the delivery date on the below “DELIVERY INFORMATION” table reflects the last date in which the Option CLIN product would be delivered after it is exercised. It does not mean it is the actual delivery date. As stated in F.3 above, these delivery dates will be updated once the Option CLIN is exercised.

SECTION F ADDITIONAL TERMS

F.1 TECHNICAL DATA AND INFORMATION

Technical Data and Information shall be delivered IAW the SOW, Section J, Attachment # 1, at the frequency specified in the CDRL Exhibits (A), (B) and (F) for the specified CLINs as per the below table, and the terms and conditions set forth in this contract. The Data Item Transmittal (DIT) form , Section J, Attachment # 3, shall be utilized to transmit to the Government all CDRL requirements.

CDRL TITLE
CLIN

CLIN

CLIN

EPACT
EPACT
EPACT
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

GSM
GSM
GSM
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

RP
RP
RP
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

BM
BM
BM
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

MR
MR
MR
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

GSE
GSE
GSE
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

MM(SUR)
MM(SUR)
MM(SUR)
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

EM
EM
EM
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

AME
AME
AME
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

EN
EN
EN
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

DC
DC
DC
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

HT
HT
HT
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

QM
QM
QM
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X
CDRL TITLE
CLIN

CLIN

CLIN

AE
AE
AE
A001
DoD Risk Management Framework (RMF) Package
X
X
X
A002
Requirements Traceability Verification Matrix (RTVM)
X
X
X
A003
Test Procedures (TP)
X
X
X
A004
Test / Inspection Report (T/IR)
X
X
X
A005
Computer Software Product End Item (CSPEI)
X
X
X
B001
Technical and Management Work Plan (Integrated Master Plan)
X
X
X
B002
Integrated Program Management Report (IPMR)
X
X
X
B003
Contract Work Breakdown Structure (CWBS)
X
X
X
B004
Contractor Progress, Status and Management Report
X
X
X
B005
Conference Agenda
X
X
X
B006
Conference Minutes
X
X
X
B007
Site Visit Plan (Conference Agenda and Presentation Materials)
X
X
X
B008
Operations Security (OPSEC) Plan
X
X
X
B009
Vendor Integrity Statements for Software (Scientific and Technical Reports)
X
X
X
F001
Style Guide (Instructional Media Design Package)
X
F002
Model Products (Instructional Media Design Package)
X
F003
Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package)
X
F004
On-Screen Lessons (Instructional Media Package)
X
F005
Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports)
X
F006
CD-ROM/DVD Delivery (Instructional Media Package)
X
X
X
F007
Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package)
X
F008
Test Package (Test Package)
X
X
X
F009
Interactive Training Curriculum Package (Training Conduct Support Document)
X
X
X
F00A
Structured On-the-Job Training (Training Conduct Support Document)
X
X
X
F00B
Training Course Control Document (Training Program Structure Document)
X
X
X
F00C
Training Systems Support Procedures (Training System Support Document)
X
X
X
F00D
Train the Trainer (Course Conduct Information Package)

X

F00E
Pilot (Training Evaluation Document)

X

F00F
Instructional Media Source Files (Instructional Media Package)
X
X
X

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS TO OFFERORS

PART A: GENERAL INSTRUCTIONS

1.0 GENERAL

1.1 Section L contains instructions on how to prepare and submit proposals in response to this solicitation. Nonconformance with these instructions may result in an unfavorable proposal evaluation and elimination from consideration for award.

1.2 The government will base its evaluation on the information presented in the Offeror's proposal. The Offeror has the burden to submit a proposal that convincingly demonstrates that the Offeror has an accurate understanding of the requirements and the associated risks; that the Offeror has viable solutions for the requirements and potential risk areas; and that the Offeror is able, willing and competent to devote the resources necessary to meet the requirements.

1.3 It is the Offeror’s responsibility to submit a proposal that enables government evaluators to effectively evaluate and substantiate the validity of any assertions set forth in the Offeror’s proposal. Assume the government has no prior knowledge of an Offeror’s facilities and experience. Accordingly, do not simply rephrase or restate the government's requirements. Regurgitating the Statement of Work, any Government Instruction, guideline documents or standards are inadequate and will adversely impact the government’s evaluation assessment of the Offeror.

1.4 Alternate proposals are not acceptable. In addition, taking exception or deviating or requesting waivers (including making assumptions and conditions that may be construed as taking exception, deviation or waiver) from any term or condition of the RFP may make an offer unacceptable, and the proposal unawardable, unless the RFP expressly authorizes such an exception or deviation with regard to that specific term or condition.

1.5 There is no need to repeat information in the same volume or in more than one volume. If an overlap exists, the detailed information should be included in the most logical place and summarized and referenced in other areas. No cost or pricing information other than the information required at Section L.B.1.1(c) should appear in the Past Performance volume.

2.0 PROPOSAL FORMAT

Written proposals must be formatted using a Times New Roman 12-point normal font, no reduction permitted, single-spaced, 1-inch margins all around, and formatted for standard 8.5 x 11 inch paper. All pages should be numbered and labeled according to the proposal volume. Attachments to the proposals shall follow the same format described above. When foldout pages are used, they must not exceed 11 x 17 inches and will be counted as 1 page. Drawings may be provided separately and may be any size, but should be folded to approximately 8.5 x 11 inch standard size and will count as 1 page. Graphs, drawings, graphics, tables and figures shall be presented in no smaller than a 10-point font and shall be labeled. The proposal cover sheet shall include the company name as it appears in the TDPC IDIQ contract and include the CAGE and DUNS codes. BE CONSISTENT!

3.0 PROPOSAL VOLUMES

3.1 All proposals must be UNCLASSIFIED. Each volume of the proposal shall be submitted as one paper original with additional paper and separate Compact Disk Read-Only Memory (CD-ROM) copies as specified in the table below.

3.2 The separate CD-ROM copy of the Past Performance Volume shall be fully compatible with Microsoft Office 2016 products. Do not submit in .pdf format unless information is not supported by Microsoft Office products (e.g., drawings, attachments such as CDRLs,). Any information provided in portable document format (.pdf), shall be a fully searchable .pdf using the latest Adobe Acrobat on each CD-ROM. . Do not submit in copy or picture format and do not submit attachments files (e.g., CPARS, SOW copy, contract document copy) using .jpeg (or similar) or picture copy pasted in a Word document or .pdf. All proposal files shall be fully searchable. The separate CD-ROM copy of the Price Volume must be provided in or be compatible with Microsoft Office 2016 Word and Excel (if applicable) format, with spreadsheets unprotected and showing all computations and formulas (if applicable.) The price files shall be fully searchable. Each separate CD-ROM is to be labeled for content and the Offeror’s name. If a discrepancy exists between the original paper version of the proposal and a CD-ROM “copy,” the paper original will take precedence.

3.3 Page limitations for each volume are specified in the table below. Proposal pages beyond the specified limit will not be evaluated. Title/cover pages, table of contents, lists of figures/tables, divider tabs, and worksheets do not count towards the page limit.

Volume Number
Volume Title
Page Limit
Copies Required
1
PAST PERFORMANCE
As needed

(no page limit) 1 Paper Original 2 Paper Copies 2 CD-ROM Copies

2
PRICE
As needed

(no page limit) 1 Paper Original 2 Paper Copies 2 CD-ROM Copies

3.4 There is no Technical proposal required or desired.

3.5 Submission of past performance supporting documentation (in accordance with Section L, Part B, 1.2.g) in electronic format only as part of the CD-ROM submission for the Past Performance Volume is acceptable.

4.0 SOLICITATION QUESTIONS

Questions regarding this solicitation shall be submitted in writing with the use of Attachment L-1. Each question or comment should reference the applicable document, page number, and paragraph number. Do not include any proprietary information in your question, because the government will provide the question and answer to all potential Offerors. All questions must be submitted for the solicitation no later than 5:00 pm EDT on 22 July 2019 to Mr. Austin Brookshire, Contract Specialist, at austin.brookshire@navy.mil (407-380-8192) and carbon copy Mr. Ricardo Elias, at ricardo.l.elias@navy.mil (407-380-4101). The government is under no obligation to try to answer questions received after that date, but may answer the questions if time permits.

5.0 PROPOSAL SUBMISSION

5.1 Clearly mark all packages with the solicitation number. The submission date for the proposal shall be no later than the date and time specified in Block 9 of Standard Form 33 of the RFP. Offerors shall not submit proposals by facsimile or via email.

5.2 Proposals Submitted by Commercial Carrier: Offerors shall submit proposals via United States Postal Service or through a commercial carrier using the following address:

Naval Air Warfare Center Training Systems Division Code: AIR-2.5.3.1.1 Austin Brookshire Tel. (407) 380-8192 12211 Science Drive Orlando, FL 32826 Solicitation Number: N6134019R0022

5.3 Hand Carried Proposals: Hand carried proposals must be delivered to the address above, attention Austin Brookshire, 407-380-8192. If a proposal or amendment is hand carried, the Offeror must submit a written visit request no later than three business days prior to the proposal due date. Without the visit request, the Offeror may not get beyond the installation security gate to deliver its proposal. Guards are not authorized to accept proposals. A visit request may be obtained by contacting Mr. Austin Brookshire, Contract Specialist, at austin.brookshire@navy.mil (407-380-8192). Upon arrival to NAWCTSD, please contact Austin Brookshire from the lobby phone. In the event that Mr. Brookshire is not available, please contact the alternate point of contact, Mr. Ricardo Elias, at ricardo.l.elias@navy.mil (407-380-4101).

5.4 Late Proposals:

(a) Definitions. As used in this provision— “Proposal modification” is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer.

“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of all amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals. Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the government office designated in the solicitation by the time specified in the solicitation.

(1) Any proposal, modification, or revision received at the government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition, and—

(i) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(ii) There is acceptable evidence to establish that it was received at the government installation designated for receipt of offers and was under the government’s control prior to the time set for receipt of offers; or

(iii) It is the only proposal received.

(2)However, a late modification of an otherwise successful proposal that makes its terms more favorable to the government will be considered at any time it is received and may be accepted.
(3)Acceptable evidence to establish the time of receipt at the government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of government personnel.
(4)If an emergency or unanticipated event interrupts normal government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal government processes resume.
(5)Proposals may be withdrawn by written notice received at any time before award.
(6)Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7)Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8)Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

(9) A written award or acceptance of proposal mailed or otherwise furnished to the successful Offeror within the time specified in the proposal shall result in a binding delivery order without further action by either party.

5.5 Restriction on Disclosure and Use of Data: Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the government except for evaluation purposes, shall—

(a) Mark the title page with the following legend:

This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a delivery order is awarded to this Offeror as a result of — or in connection with — the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting delivery order. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(b) Mark each sheet of data it wishes to restrict with the following legend:

Use or disclosure of data contained on this sheet is subject to the restriction…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.