Atch

PDF 56 KB Posted

Attached to
FY20 RRL CC Final RFP Posting
Solicitation number
N6134019R0022
Issued by

About this file

Attachment L-4 with Track Changes

View the file

Other files

File Type Posted
FY20_Final_RFP_QA_Amend02.pdf PDF
Atch PDF
N6134019R0022_Amend0002_FINAL_6Aug19.docx DOCX document
N6134019R0022_SecL_SecM_Track_Changes_Amend02.pdf PDF
N6134019R0022_Conformed_Copy_Amend0002.docx DOCX document
N6134019R0022_Amend0002_Announcement_6Aug19.pdf PDF
Atch —
N6134019R0022_Amend0001_SecM_Track_Changes.pdf PDF
N6134019R0022_Conformed_Copy_Amend0001.docx DOCX document
Atch —
N6134019R0022_Amend0001_Announcement_12Jul19.pdf PDF
N6134019R0022_Amend0001_SecL_Track_Changes.pdf PDF
FY20_Final_RFP_QA_Amend0001.pdf PDF
N6134019R0022_Amend0001.zip ZIP file
N6134019R0022_Amend0001_FINAL_12Jul19.docx DOCX document
TDPC_Contact_List_10Jul19.xlsx XLSX spreadsheet
FY20_CC_RFP_PPQ_Info_2Jul19.pdf PDF
N6134019R0022_FY20CC_RFP_Announcement_28Jun19.pdf PDF
TDPC_Contact_List_5Nov18_(2).xlsx XLSX spreadsheet
Att_(L-1)_Q&A_Form_21Mar2019.xlsx XLSX spreadsheet
DRAFT_RFP_Q&A_Government_POSTING_28Jun19.pdf PDF
Atch_(L-3)_Past_Performance_Questionaire(PPQ).docx DOCX document
Atch_(L-2)_PastPerformanceContractReferenceWorksheet.docx DOCX document
N6134019R0022_FINAL_RFP_28Jun19.docx DOCX document
Atch_(L-4)_Relevancy_Information_of_the_PP_Contract_FINAL_28Jun19.docx DOCX document
FY20_CC_PreSolSign-In_Sheet.pdf PDF
FY20_CC_PreSolConf_rv1.pptx PPTX presentation
N6134019R0022_DRAFT.docx DOCX document
Atch_(1)_S2025_RRL_FY20CC_SOW.docx DOCX document
Atch_(L-1)_Q&A_Form_21Mar2019.xlsx XLSX spreadsheet
TDPC_Contact_List_Lot_1_FA_2.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment L-4 25 June12 July 2019

Relevancy Information of the Past Performance Contract Reference Worksheet

S2025 RRL FY20 CC: Solicitation No. N6134019R0022

Complete this form as per Section L Part B 1.2

Prime or Principal Team Member’s Name: ____________________________

Contract Number*: ____________________________

* If proposing to an entire Single Award IDIQ contract, identify the Base Contract Number and each of the three Delivery Order Numbers as well.

The relevancy information below should support each Delivery Order. If proposing three of the most relevant

Relevancy Information

a. Contract Types

Contract Type: Compare the contract type (e.g., FFP, CPFF, CPAF, etc.) of the past performance contract reference to the contract type of this solicitation’s effort.

b. Total Dollar Amount of Past Performance Contract

Compare the total dollar amount of the past performance contract reference to the proposed amount the prime or principal team member is proposing to complete for the instant solicitation requirement. This The amount the prime or principal team member is proposing to complete for the instant solicitation requirement should shall match the amount identified in Section L.B.1.1.c.

The past performance contract reference dollar amount compared to the instant solicitation requirement shall be the dollar amount relevant to the scope requirement reflected above. The instant solicitation (i.e., this solicitation) is estimated at a total of $86 million, inclusive of Options.

c. Relevant Dollar Amount

Relevant Dollar Amount Actually Performed (this is for effort already performed): Compare the Relevant dollar amount of the past performance contract reference effort actually performed by the Offeror Prime or principal team member under the past performance contract reference to the dollar amount of the effort proposed to be performed by the Offeror Prime or principal

Actually Performed (this is for effort already performed) team member under this solicitation’s effort. The offeror shall express this number in terms of total dollars and in terms of total dollars and in terms of percentage of total effort. If the past performance contract reference effort is still in performance, provide the relevant amount up to the RFP Release Date stated on block 5 of Standard Form 33 of the RFP, and indicate if a delivery has been completed.

d. Locations and Divisions (include CAGE and DUNS)

Compare the location and division of the company that performed the past performance contract reference effort to the location and division of the company that is proposed to perform this solicitation’s effort. Note: Location and Division of the past performance contract reference shall be the same as the Location and Division performing this instant solicitation.

e. Period of Performances

Compare the period of performance of the past performance contract reference to the period of performance actually performed under that past performance contract reference for the Offeror Prime or principal team member.

f.1 SCOPE OF EFFORT Scope of work proposed under contract reference Required Under This Solicitation's SOW

Identify the Statement of Work, Performance Work Statement, Specifications, Statement of Objectives, and/or Contract Data Requirements Lists (CDRLs) specific sections and or paragraphs used to support its rationale below:

Supporting SOW paragraphs are Design Phase (SOW 3.3.1), Development Phase (SOW 3.3.2), Implementation Phase (3.3.3), Evaluation Phase (3.3.4) phases and 3.4, Systems Engineering of the instant solicitation SOW.

Offeror to complete its rationale why its past performance contract reference is relevant to the scope of effort for this solicitation and the Offeror cites the paragraph reference(s) of the portion of the past performance contract reference’s Statement of Work, Performance Work Statement, Specifications, Statement of Objectives, and/or Contract Data Requirements Lists (CDRLs) used to support its rationale:

End Scope of Effort f.2 Magnitude of Effort

End Magnitude of Effort

Past Performance Contract Reference

1. Total dollar amount of the prime or principal team member on the past performance contract reference.

2. Total dollar amount of the prime or principal team member’s relevant past performance contract reference actually performed

Required Under This Solicitation

1. Proposed total dollar amount of the prime or principal team member on the instant solicitation. This amount should shall match the amount identified in Section L.B.1.1.c.

Insert Amount here (Amounts #1 and #2 can be the same but might not be. For example, a contract with a CLIN 0001 for ICW of $2M and a CLIN 0002 for an Airplane of $100M will only have a total relevant dollar amount of $2M.):

1.

2.

Insert Amount here (should be same amount in Section L.B.1.1.c.):

1.

The Pprime or principal team member to shall compare the total relevant total dollar amount of the past performance contract reference to the proposed amount it is amount it is proposing to complete for the instant solicitation requirement.

f.3 Complexity of Effort

Total ICW hours proposed on Past Performance Contract Reference

Required Under This Solicitation

Insert Total hours of ICW: Proposed hours under this solicitation: (5,378 x (percentage of prime or principal team member’s identified in Section L.B.1.1.c to the instant solicitation)

Offeror to identify and provide rationale comparing the prime or principal team member’s proposed ICW hours, to be quantified as illustrated in Section L.B.1.2.g.3, to the hours of ICW delivered or to be delivered for each proposed past performance contract reference:

End Complexity of Effort

File details come from the government source that posted it.