Attachment_J.4_Potential_Hazardous_Environments.docx

DOCX document 15 KB Posted

Attached to
Depot Level Repair and Maintenance of Airborne Mine Countermeasures (AMCM) Systems
Solicitation number
N61331-17-R-0003
Issued by

About this file

Attachment J.4

View the file

Other files

File Type Posted
Attachment_J.11__DD1155_v2_updated_POP_in_6.0_and_5.2.docx DOCX document
RFP_Amend_02_N61331-17-R-0003.pdf PDF
EXH_A__CDRLs_01.pdf PDF
Attachment_J.10__DD1155.docx DOCX document
Attachment_J.11__DD1155.docx DOCX document
Attachment_J.9__DD1155.docx DOCX document
RFP_amend01_N61331-17-R-0003.pdf PDF
Industry_Questions_N61331-17-R-0003__03.5.2018.pdf PDF
Attachment_J.10__DD1155.pdf PDF
RFP__N61331-17-R-0003__02.23.2018(F).pdf PDF
Attachment_J.2_Desired_Quals_Key_Personnel.docx DOCX document
Attachment_J.8_Historical_Data.docx DOCX document
Attachment_J.6_Past_Performance_Questionnaire.docx DOCX document
EXH_A__CDRLs.pdf PDF
EXH_A.1_DI_MGMT-81864A.pdf PDF
Attachment_J.11__DD1155.pdf PDF
Attachment_J.1_DD254.pdf PDF
EXH_A.2_DI-MGMT-80441B.pdf PDF
Attachment_J.7_GFP_List.xlsx XLSX spreadsheet
Attachment_J.5_Past_Performance_Ref_Template.xlsx XLSX spreadsheet
Attachment_J.9__DD1155.pdf PDF
N61331-17-R-0003_DRAFT_RFP_MARK105_20171208_TJS.pdf PDF
Attachment_J.10__DD1155.pdf PDF
Attachment_J.2_Desired_Quals_Key_Personnel.docx DOCX document
Attachment_J.7_GFP.List.pdf PDF
Attachment_J.8_Historical Data.pdf PDF
Attachment_J.6_Past_Performance_Questionnaire.docx DOCX document
Attachment_J.9__DD1155.pdf PDF
Attachment_J.5_Past_Performance_Ref_Template.xlsx XLSX spreadsheet
Attachment_J.11__DD1155.pdf PDF
Attachment_J.1_DD254.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

With respect to following delivery orders, one could expect being involved with the following potentially hazardous environments/materials:

Delivery Order Option 1 – Fixture Installation

· Lifting of heavy equipment

· The need for overhead crane (lifting of heavy equipment)

· Use of power tools for assembly and installation into foundation (which may be loud and could produce projectiles) Delivery Order Option 2 – Engineering Services

· There are no anticipated hazardous conditions or materials with respect to engineering services Delivery Order option 3 – Starboard Main Float Manufacture (Overhaul)

· Moving of heavy equipment (fixtures) and parts

· Use of overhead crane

· Extensive riveting (loud and repetitious)

· Sheet metal fabrication

· Use of power tools for assembly

· Hazardous Materials

· Hydraulic Fluid

· RTV Sealant

· Silicone

· Primer and Paint

· Chemical conversions (passivation, alodine, anodization)

· Hydraulic Actuations (up 3000 PSI)

· Moving objects - pinch points and hydrofoil arc

· Foil arc consists of large and heavy metal objects actuating about the main float causing an area where objects could cause injury

· Electrical testing consisting of 28 Volts

· Using pressurized air (could produce projectiles)

· Machining and welding

File details come from the government source that posted it.