N55236-17-R-0012_Solicitation.pdf
PDF 1 MB Posted
- Solicitation number
- N55236-17-R-0012
About this file
Solicitation
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N5523617R0012 02-Aug-2017
b. TELEPHONE NUMBER
619-556-7266
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 01 Sep 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N552369. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SHARON M YOUNG
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
N5523617R0012B
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
SOUTHWEST REGIONAL MAINTENANCE CENTER
ATTN: PRESTON CARLSON
3755 BRINSER STREET BLDG 77 RM 108H
SAN DIEGO CA 92136-5205
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE N55236 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
X SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
SOUTHWEST REGIONAL MAINTENANCE CENTER
GLORIA SEMBACH
3755 BRINSER STREET, BLDG. 3339
SAN DEIGO CA 92136-5205
TEL: (619) 545-2832 FAX:
FAX:
TEL: (619) 556-4708
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
X 8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$38,500,000
NAICS:
561210
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF205
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N5523617R0012
Section A - Solicitation/Contract Form
This is a competitive small business 8(a) program Firm-Fixed Price (FFP) service contract for Southwest Regional
Maintenance Center (SWRMC) Facilities requires the contractor to provide support services in facilities maintenance and bicycle repair areas. The contractor shall provide qualified personnel for technical support to
SWRMC’s Facilities Department.
Section B - Supplies or Services and Prices
NOTES:
NOTE A: SUPPORT HOURS
For Labor Items, Offerors shall propose man-hours specified in Section B to perform the requirements of the
Statement of Work (SOW) provided for the period of performance specified in SECTION F. Subcontractor Labor shall be billed under these line items.
NOTE B: (HQ B-2-0010) OPTION
Option Item to which the OPTION clause in SECTION I applies and which is to be supplied only if and to the extent said Option is exercised.
NOTE C: ADDITIONAL Sub-Line Item Number(s)(SLIN(s))
Additional SLIN(s) will be unilaterally created by the Contracting Officer during performance of this contract to accommodate the multiple types of funds that will be used under this contract.
NOTE D: (HQ B-2-0011) OVERTIME
Offerors shall propose overtime rates only. An estimated amount for each support item shall be set forth in the resulting contract or upon exercise of option(s), as applicable.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
BASE YEAR - STRAIGHT TIME LABOR
FFP
Straight time labor in support of Southwest Regional Maintenance Center
(SWRMC) Facilities Department. See Statement of Work (SOW) for details. See notes: A and C. Period of Performance: 03 Nov 2017 - 02 Nov 2018.
PURCHASE REQUEST NUMBER: N5523617R0012B
NET AMT
0001AA
1,960 Hours
WORD PROCESSOR III
FFP
Straight time labor for Inventory Specialist in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
(SOW) for details. See note: A.
FOB: Destination
0001AB
3,920 Hours
ELECTRICIAN, MAINTENANCE
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
0001AC
5,880 Hours
ELECTRONIC TECHNICIAN MAINTENANCE III
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
0001AD
ENGINEERING TECHNICIAN V
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
0001AE
HEATING, VENTILATION & AC MECHANIC
FFP
Straight time labor for Support Electrician AC & R in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
Work (SOW) for details. See note: A.
0001AF
FFP
Straight time labor for Support Electrician AC & R in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
0001AG
PIPEFITTER, MAINTENANCE
FFP
Straight time labor for Support Pipefitter in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
0001AH
9,800 Hours
MACHINERY MAINTENANCE MECHANIC
FFP
Straight time labor for Support Mechanic in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
0001AJ
FFP
Straight time labor for Preventative Maintenance Mechanic in support of
Southwest Regional Maintenance Center (SWRMC) Facilities Department. See
Statement of Work (SOW) for details. See note: A.
0001AK
GROUND SUPPORT EQUIPMENT WORKER
FFP
Straight time labor for Support Mechanic in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
0001AL
MAINTENANCE TRADES HELPER
FFP
Straight time labor for Maintenance Trades Helper in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
0001AM
TOOLS AND PARTS ATTENDANT
FFP
Straight time labor for Tool Issue in support of Southwest Regional Maintenance
Center (SWRMC) Facilities Department. See Statement of Work (SOW) for details. See note: A.
0001AN
WELDER, COMBINATION, MAINTENANCE
FFP
Straight time labor for Support Welder in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
0001AP
BICYCLE REPAIRER
FFP
Straight time labor for Bicycle Repairer in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
BASE YEAR - OVERTIME
Overtime hours in support of 0001. See notes: A, C, and D. Period of Performance:
02 Nov 2017 - 02 Nov 2018.
0002AA
100 Overtime
Hours
WORD PROCESSOR III
Overtime hours in support of 0001AA. See notes: A and D.
0002AB
200 Overtime
ELECTRICIAN MAINTENANCE
Overtime hours in support of 0001AB. See notes: A and D.
0002AC
300 Overtime
ELECTRONIC TECHNICIAN MAINTENANCE III
Overtime hours in support of 0001AC. See notes: A and D.
0002AD
Overtime hours in support of 0001AD. See notes: A and D.
0002AE
HEATING, VENTILATION & AC MECHANIC
Overtime hours in support of 0001AE. See notes: A and D.
0002AF
Overtime hours in support of 0001AF. See notes: A and D.
0002AG
PIPEFITTER, MAINTENANCE
Overtime hours in support of 0001AG. See notes: A and D.
0002AH
500 Overtime
Overtime hours in support of 0001AH. See notes: A and D.
0002AJ
Overtime hours in support of 0001AJ. See notes: A and D.
0002AK
GROUND SUPPORT EQUIPMENT WORKER
Overtime hours in support of 0001AK. See notes: A and D.
0002AL
MAINTENANCE TRADES HELPER
Overtime hours in support of 0001AL. See notes: A and D.
0002AM
WELDER, COMBINATION, MAINTENANCE
Overtime hours in support of 0001AN. See notes: A and D.
OPTION BASE YEAR - ADDITIONAL LABOR
Additional straight time labor in support of SOW paragraphs 3.3 and 3.8 for
Southwest Regional Maintenance Center (SWRMC) Facilities Department. See
Statement of Work (SOW) for details. See notes: A, B, and C. Period of
Performance: 28 Apr 2018 - 02 Nov 2018.
0003AA
2,112 Hours
OPTION WORD PROCESSOR III
FFP
Straight time labor for Inventory Specialist in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
(SOW) for details. See notes: A, and B.
0003AB
OPTION ADMINISTRATIVE ASSISTANT
FFP
Straight time labor for Help Desk Administration in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
0003AC
OPTION SUPPLY TECHNICIAN
FFP
Straight time labor for Material Coordinator in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
0003AD
1,056 Hours
OPTION DISPATCHER, MOTOR VEHICLE
FFP
Straight time labor for Motor Vehicle Dispatcher in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
OPTION BASE YEAR - ADDITIONAL OVERTIME
Overtime hours in support of 0003. See notes: A, B, C and D. Period of
Performance: 28 Apr 2018 - 02 Nov 2018.
0004AA
Overtime hours in support of 0003AA. See notes: A, B, and D.
0004AB
Overtime hours in support of 0003AB. See notes: A, B, and D.
0004AC
Overtime hours in support of 0003AC. See notes: A, B, and D.
0004AD
50 Overtime
Overtime hours in support of 0003AD. See notes: A, B, and D.
Each
CONTRACT DATA REQUIREMENTS LIST (CDRLS)
CDRLS in support of CLINs 0001, 0002 , and if exercised, 0003, 0004 - Not separately priced. Period of Performance: 03 Nov 2017 - 02 Nov 2018.
OPTION OPTION YEAR ONE - STRAIGHT TIME LABOR
Straight time labor in support of Southwest Regional Maintenance Center
(SWRMC) Facilities Department. See Statement of Work (SOW) for details. See notes: A, B, and C. Period of Performance: 03 Nov 2018 - 02 Nov 2019.
1001AA
FFP
Straight time labor for Inventory Specialist in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
(SOW) for details. See notes: A and B.
1001AB
OPTION ELECTRICIAN, MAINTENANCE
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
1001AC
OPTION ELECTRONIC TECHNICIAN MAINTENANCE III
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
(SOW) for details. SSee notes: A and B.
1001AD
OPTION ENGINEERING TECHNICIAN V
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
1001AE
OPTION HEATING, VENTILATION & AC MECHANIC
FFP
Straight time labor for Support Electrician AC & R in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
Work (SOW) for details. See notes: A and B.
1001AF
FFP
Straight time labor for Support Electrician AC & R in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
1001AG
OPTION PIPEFITTER, MAINTENANCE
FFP
Straight time labor for Support Pipefitter in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
1001AH
OPTION MACHINERY MAINTENANCE MECHANIC
FFP
Straight time labor for Support Mechanic in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
1001AJ
FFP
Straight time labor for Preventative Maintenance Mechanic in support of
Southwest Regional Maintenance Center (SWRMC) Facilities Department. See
Statement of Work (SOW) for details. See notes: A and B.
1001AK
OPTION GROUND SUPPORT EQUIPMENT WORKER
FFP
Straight time labor for Support Mechanic in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
1001AL
OPTION MAINTENANCE TRADES HELPER
FFP
Straight time labor for Maintenance Trades Helper in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
1001AM
OPTION TOOLS AND PARTS ATTENDANT
FFP
Straight time labor for Tool Issue in support of Southwest Regional Maintenance
Center (SWRMC) Facilities Department. See Statement of Work (SOW) for details. See notes: A and B.
1001AN
OPTION WELDER, COMBINATION, MAINTENANCE
FFP
Straight time labor for Support Welder in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
1001AP
OPTION BICYCLE REPAIRER
FFP
Straight time labor for Bicycle Repairer in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
1001AQ
FFP
Straight time labor for Help Desk Administration in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
1001AR
FFP
Straight time labor for Material Coordinator in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
1001AS
OPTION DISPATCHER,MOTOR VEHICLE
FFP
Straight time labor for Support Dispatcher in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
OPTION OPTION YEAR ONE - OVERTIME
Overtime hours in support of 1001. See notes: A, B, C, and D.Period of
Performance: 03 Nov 2018 - 02 Nov 2019.
1002AA
Overtime hours in support of 1001AA. See notes: A, B, and D.
1002AB
OPTION ELECTRICIAN MAINTENANCE
Overtime hours in support of 1001AB. See notes: A, B, and D.
1002AC
Overtime hours in support of 1001AC. See notes: A, B, and D.
1002AD
Overtime hours in support of 1001AD. See notes: A, B, and D.
1002AE
Overtime hours in support of 1001AE. See notes: A, B, and D.
1002AF
Overtime hours in support of 1001AF. See notes: A, B, and D.
1002AG
Overtime hours in support of 1001AG. See notes: A, B, and D.
1002AH
Overtime hours in support of 1001AH. See notes: A, B, and D.
1002AJ
OPTION MACHINERY MAITENANCE MECHANIC
Overtime hours in support of 1001AJ. See notes: A, B, and D.
1002AK
Overtime hours in support of 1001AK. See notes: A, B, and D.
1002AL
Overtime hours in support of 1001AL. See notes: A, B, and D.
1002AM
Overtime hours in support of 1001AN. See notes: A, B, and D.
1002AN
Overtime hours in support of 1001AQ. See notes: A, B, and D.
1002AP
Overtime hours in support of 1001AR. See notes: A, B, and D.
1002AQ
Overtime hours in support of 1001AS. See notes: A, B, and D.
OPTION OPTION YEAR ONE - ADDITIONAL LABOR
Additional straight time labor in support of SOW paragraphs 3.1, 3.2.1, and 3.8 for
Southwest Regional Maintenance Center (SWRMC) Facilities Department. See
Statement of Work (SOW) for details. See notes: A, B, and C. Period of
Performance: 30 Aug 2019 - 02 Nov 2019.
1003AA
360 Hours
OPTION ENGINEERING TECHNICIAN IV
FFP
Straight time labor for Preventative Maintenance Coordinator in support of
Southwest Regional Maintenance Center (SWRMC) Facilities Department. See
Statement of Work (SOW) for details. See notes: A, and B.
1003AB
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
1003AC
FFP
Straight time labor for Support Mechanic in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
1003AD
FFP
Straight time labor for Preventative Maintenance Mechanic in support of
Southwest Regional Maintenance Center (SWRMC) Facilities Department. See
Statement of Work (SOW) for details. See notes: A, and B.
OPTION OPTION YEAR ONE - ADDITIONAL OVERTIME
Overtime hours in support of 1003. See notes: A, B, C, and D. Period of
Performance: 30 Aug 2019 - 02 Nov 2019.
1004AA
35 Overtime
OPTION ENGINEERING TECHICIAN IV
Overtime hours in support of 1003AA. See notes: A, B, and D.
1004AB
Overtime hours in support of 1003AB. See notes: A, B, and D.
1004AC
Overtime hours in support of 1003AC. See notes: A, B, and D.
1004AD
Overtime hours in support of 1003AD. See notes: A, B, and D.
OPTION CONTRACT DATA REQUIREMENTS LIST (CDRLS)
CDRLS in support of CLINs 1001, 1002 , and if exercised, 1003, 1004 - Not separately priced. Period of Performance: 03 Nov 2018 - 02 Nov 2019.
OPTION OPTION YEAR TWO - STRAIGHT TIME LABOR
Straight time labor in support of Southwest Regional Maintenance Center notes: A, B, and C. Period of Performance: 03 Nov 2019 - 02 Nov 2020.
2001AA
FFP
Straight time labor for Inventory Specialist in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
2001AB
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
2001AC
7,840 Hours
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
2001AD
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
2001AE
FFP
Straight time labor for Support Electrician AC & R in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
2001AF
FFP
Straight time labor for Support Electrician AC & R in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
2001AG
FFP
Straight time labor for Support Pipefitter in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
2001AH
11,760 Hours
FFP
Straight time labor for Support Mechanic in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
2001AJ
FFP
Straight time labor for Preventative Maintenance Mechanic in support of
Southwest Regional Maintenance Center (SWRMC) Facilities Department. See
2001AK
FFP
Straight time labor for Support Mechanic in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
2001AL
FFP
Straight time labor for Maintenance Trades Helper in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
2001AM
FFP
Straight time labor for Tool Issue in support of Southwest Regional Maintenance
Center (SWRMC) Facilities Department. See Statement of Work (SOW) for
2001AN
FFP
Straight time labor for Support Welder in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
2001AP
FFP
Straight time labor for Bicycle Repairer in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
2001AQ
FFP
Straight time labor for Help Desk Administration in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
2001AR
FFP
Straight time labor for Material Coordinator in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
2001AS
FFP
Straight time labor for Support Dispatcher in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
2001AT
FFP
Straight time labor for Preventative Maintenance Coordinator in support of
Southwest Regional Maintenance Center (SWRMC) Facilities Department. See
OPTION OPTION YEAR TWO - OVERTIME
Overtime hours in support of 2001. See notes: A, B, C, and D. Period of
Performance: 03 Nov 2019 - 02 Nov 2020.
2002AA
Overtime hours in support of 2001AA. See notes: A, B, and D.
2002AB
Overtime hours in support of 2001AB. See notes: A, B, and D.
2002AC
400 Overtime
Overtime hours in support of 2001AC. See notes: A, B, and D.
2002AD
Overtime hours in support of 2001AD. See notes: A, B, and D.
2002AE
Overtime hours in support of 2001AE. See notes: A, B, and D.
2002AF
Overtime hours in support of 2001AF. See notes: A, B, and D.
2002AG
Overtime hours in support of 2001AG. See notes: A, B, and D.
2002AH
600 Overtime
Overtime hours in support of 2001AH. See notes: A, B, and D.
2002AJ
Overtime hours in support of 2001AJ. See notes: A, B, and D.
2002AK
Overtime hours in support of 2001AK. See notes: A, B, and D.
2002AL
Overtime hours in support of 2001AL. See notes: A, B, and D.
2002AM
Overtime hours in support of 2001AN. See notes: A, B, and D.
2002AN
Overtime hours in support of 2001AQ. See notes: A, B, and D.
2002AP
Overtime hours in support of 2001AR. See notes: A, B, and D.
2002AQ
Overtime hours in support of 2001AS. See notes: A, B, and D.
2002AR
Overtime hours in support of 2001AT. See notes: A, B, and D.
CDRLS in support of CLINs 2001 and 2002 - Not separately priced. Period of
Performance: 03 Nov 2019 - 02 Nov 2020.
OPTION OPTION YEAR THREE - STRAIGHT TIME LABOR
Straight time labor in support of Southwest Regional Maintenance Center notes: A, B, and C. Period of Performance: 03 Nov 2020 - 02 Nov 2021.
3001AA
FFP
Straight time labor for Inventory Specialist in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
3001AB
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
3001AC
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
3001AD
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
3001AE
FFP
Straight time labor for Support Electrician AC & R in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
3001AF
FFP
Straight time labor for Support Electrician AC & R in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
3001AG
FFP
Straight time labor for Support Pipefitter in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
3001AH
FFP
Straight time labor for Support Mechanic in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
3001AJ
FFP
Straight time labor for Preventative Maintenance Mechanic in support of
Southwest Regional Maintenance Center (SWRMC) Facilities Department. See
3001AK
FFP
Straight time labor for Support Mechanic in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
3001AL
FFP
Straight time labor for Maintenance Trades Helper in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
3001AM
FFP
Straight time labor for Tool Issue in support of Southwest Regional Maintenance
Center (SWRMC) Facilities Department. See Statement of Work (SOW) for
3001AN
FFP
Straight time labor for Support Welder in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
3001AP
FFP
Straight time labor for Bicycle Repairer in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
3001AQ
FFP
Straight time labor for Help Desk Administration in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
3001AR
FFP
Straight time labor for Material Coordinator in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
3001AS
FFP
Straight time labor for Support Dispatcher in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
3001AT
FFP
Straight time labor for Preventative Maintenance Coordinator in support of
Southwest Regional Maintenance Center (SWRMC) Facilities Department. See
OPTION OPTION YEAR THREE - OVERTIME
Overtime hours in support of 3001. See notes: A, B, C, and D. Period of
Performance: 03 Nov 2020 - 02 Nov 2021.
3002AA
Overtime hours in support of 3001AA. See notes: A, B, and D.
3002AB
Overtime hours in support of 3001AB. See notes: A, B, and D.
3002AC
Overtime hours in support of 3001AC. See notes: A, B, and D.
3002AD
Overtime hours in support of 3001AD. See notes: A, B, and D.
3002AE
Overtime hours in support of 3001AE. See notes: A, B, and D.
3002AF
Overtime hours in support of 3001AF. See notes: A, B, and D.
3002AG
Overtime hours in support of 3001AG. See notes: A, B, and D.
3002AH
Overtime hours in support of 3001AH. See notes: A, B, and D.
3002AJ
Overtime hours in support of 3001AJ. See notes: A, B, and D.
3002AK
Overtime hours in support of 3001AK. See notes: A, B, and D.
3002AL
Overtime hours in support of 3001AL. See notes: A, B, and D.
3002AM
Overtime hours in support of 3001AN. See notes: A, B, and D.
3002AN
Overtime hours in support of 3001AQ. See notes: A, B, and D.
3002AP
Overtime hours in support of 3001AR. See notes: A, B, and D.
3002AQ
Overtime hours in support of 3001AS. See notes: A, B, and D.
3002AR
Overtime hours in support of 3001AT. See notes: A, B, and D.
CDRLS in support of CLINs 3001, and 3002 - Not separately priced. Period of
Performance: 03 Nov 2020 - 02 Nov 2021.
OPTION OPTION YEAR FOUR - STRAIGHT TIME LABOR
Straight time labor in support of Southwest Regional Maintenance Center notes: A, B, and C. Period of Performance: 03 Nov 2021 - 02 Nov 2022.
4001AA
FFP
Straight time labor for Inventory Specialist in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
4001AB
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
4001AC
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
4001AD
FFP
Straight time labor for Support Electrician in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
4001AE
FFP
Straight time labor for Support Electrician AC & R in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
4001AF
FFP
Straight time labor for Support Electrician AC & R in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
4001AG
FFP
Straight time labor for Support Pipefitter in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
4001AH
FFP
Straight time labor for Support Mechanic in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
4001AJ
FFP
Straight time labor for Preventative Maintenance Mechanic in support of
Southwest Regional Maintenance Center (SWRMC) Facilities Department. See
4001AK
FFP
Straight time labor for Support Mechanic in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
4001AL
FFP
Straight time labor for Maintenance Trades Helper in support of Southwest
Regional Maintenance Center (SWRMC) Facilities Department. See Statement of
4001AM
FFP
Straight time labor for Tool Issue in support of Southwest Regional Maintenance
Center (SWRMC) Facilities Department. See Statement of Work (SOW) for
4001AN
FFP
Straight time labor for Support Welder in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
4001AP
FFP
Straight time labor for Bicycle Repairer in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
4001AQ
FFP
Straight time labor for Help Desk Administration in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
4001AR
FFP
Straight time labor for Material Coordinator in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
4001AS
FFP
Straight time labor for Support Dispatcher in support of Southwest Regional
Maintenance Center (SWRMC) Facilities Department. See Statement of Work
4001AT
FFP
Straight time labor for Preventative Maintenance Coordinator in support of
Southwest Regional Maintenance Center (SWRMC) Facilities Department. See
OPTION OPTION YEAR FOUR - OVERTIME
Overtime hours in support of 4001. See notes: A, B, C, and D. Period of
Performance: 03 Nov 2021 - 02 Nov 2022.
4002AA
Overtime hours in support of 4001AA. See notes: A, B, and D.
4002AB
Overtime hours in support of 4001AB. See notes: A, B, and D.
4002AC
Overtime hours in support of 4001AC. See notes: A, B, and D.
4002AD
Overtime hours in support of 4001AD. See notes: A, B, and D.
4002AE
Overtime hours in support of 4001AE. See notes: A, B, and D.
4002AF
Overtime hours in support of 4001AF. See notes: A, B, and D.
4002AG
Overtime hours in support of 4001AG. See notes: A, B, and D.
4002AH
Overtime hours in support of 4001AH. See notes: A, B, and D.
4002AJ
Overtime hours in support of 4001AJ. See notes: A, B, and D.
4002AK
Overtime hours in support of 4001AK. See notes: A, B, and D.
4002AL
Overtime hours in support of 4001AL. See notes: A, B, and D.
4002AM
Overtime hours in support of 4001AN. See notes: A, B, and D.
4002AN
Overtime hours in support of 4001AQ. See notes: A, B, and D.
4002AP
Overtime hours in support of 4001AR. See notes: A, B, and D.
4002AQ
Overtime hours in support of 4001AS. See notes: A, B, and D.
4002AR
Overtime hours in support of 4001AT. See notes: A, B, and D..
CDRLS in support of CLINs 4001 and 4002 - Not separately priced. Period of
Performance: 03 Nov 2021 - 02 Nov 2022.
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)
(a) As part of the negotiated fixed price or total estimated amount of this contact, both the Government and the
Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term “residual dollar amount” shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)
This entire contract is fixed price.
Section C - Descriptions and Specifications
STATEMENT OF WORK
1.0 Performance Objective
This contract is to provide technical support services to the Southwest Regional Maintenance Center (SWRMC)
Facilities Department.
1.1 Background
SWRMC has a primary mission responsibility to provide direct support to Type Commanders and U.S.
Navy Fleet units in matters of shipboard equipment and systems assessment, technical assistance and training, installation, operation, maintenance, repair, and readiness. Using Information Technology (IT), leveraging upon the specialized expertise of command personnel, and contracting resources, SWRMC has implemented various programs to increase the reliability and maintainability of shipboard Combat Systems
(CS) and Hull, Mechanical, and Electrical (HM&E) equipment and systems. This support encompasses dedicated field technical support, enhanced availability planning and execution, emergent systematic technical and repair assistance, automated maintenance techniques, documentation and procedures in accordance with defined Navy maintenance philosophies, and systematic program management oversight.
1.2 Scope of Work
SWRMC Facilities requires the contractor to provide support services in facilities maintenance and bicycle repair areas. The contractor shall provide qualified personnel for technical support to SWRMC’s Facilities
Department.
1.2.1 Personal Services
This requirement is for non-personal services.
1.2.2 Inherently Governmental
At no time shall the contractor perform any task that is deemed “Inherently Governmental.” This includes work approval of any type by direction of the Government (including civilian and military) or third-party contractor personnel, or any other task that would normally only be tasked to or accomplished by a Government employee.
1.3 General Requirements
1.3.1 Relocation of SWRMC Property
Applicable to all trades (section 3.4 through 3.13), contractor’s employees will be called upon, at times, by a SWRMC Facilities Representative to assist Government employees in the relocation of furniture, equipment, storage boxes, refrigerators, computers and other miscellaneous office related items.
1.3.2 Forklift Training and Certification Requirements
The contractor’s employees (with the exception to Word Processor III positions, 1 of 2 Administrative
Assistant positions, Supply Technician positions, and Dispatcher Motor Vehicle position) shall operate
4k through 20k forklifts, man lifts, and scissor lifts. The contractor’s employees shall provide medical certifications, and licenses as required by reference 2.8 to operate forklifts, man lifts, and scissor lifts onboard locations listed in Section 1.4. The contractor shall provide copies of all employee’s required medical certificates and licenses to SWRMC, Transportation Division at the time of contract award.
1.3.3 Government Furnished Equipment/Information
1.3.3.1 Common Access Card (CAC) (with the exception of Maintenance Trades Helper positions)
Contractor’s employees assigned to perform work under this contract shall be required to obtain/maintain a Government-issued Common Access Card (CAC) in order to access the Navy
Marine Corps Intranet (NMCI) computer network, and other Government computer systems and programs. Each support contractor employee under this contract shall have a CAC in-hand before providing direct support to SWRMC and charging to this contract.
The contractor’s lead/supervisor or Contractor Program Manager is responsible for notifying the
Contracting Officer’s Representative (COR) and the Trusted Agent (TA) when an employee who has been issued a CAC leaves the contractor’s company or transfers to another program or project. In the case of an employee who no longer works for the contractor’s company, the contractor’s company must collect the CAC and turn it over to the TA with-in two (2) working days of the employee’s departure. In the case of an employee still retained by the contractor’s company, while they are being transferred to another program or project, the contractor’s company must notify the COR and the TA within two (2) working days so the TA can transfer the TA responsibilities to the new TA vice revoking and issuing a new CAC.
1.3.3.2 Defense Biometric Identification System (DBIDS)(Maintenance Trades Helper positions only)
Contractor’s employees assigned to perform work under this contract shall be required to gain/maintain a DBIDS access card to gain access to locations listed in Section 1.4 by completely filling out The Secretary of the Navy (SECNAV) form 5512/1 and turning in the form to the COR. Each support contractor employee under this contract shall have a DBIDS in-hand before providing direct support to SWRMC and charging to this contract. The contractor’s lead/supervisor or Contractor Program Manager is responsible for notifying the COR when an employee who has been issued a DBIDS leaves the contractor’s company or transfers to another program or project. In the case of an employee who no longer works for the contractor’s company, the contractor’s company must collect the DBIDS and turn it over to the COR with-in two (2) working days of the employee’s departure. In the case of an employee still retained by the contractor’s company, while they are being transferred to another program or project, the contractor’s company must notify the COR within two (2) working days so the COR can transfer the COR responsibilities to the new COR vice revoking and issuing a new DBIDS.
1.3.3.3 Tools and equipment, parts, and supplies (i.e. golf carts) will be provided by the Government and maintained by the Contractor.
1.3.4 Contract Data Requirements List
See Contracts Data Requirements List (CDRL), Exhibit A.
1.3.5 Non-Disclosure Agreements
The contractor will be provided Contractor Employee Non-Disclosure Agreement forms (Attachment J-
2) that shall be completed and signed by each employee as a condition for each employee providing services under this contract. Completed non-disclosure agreements shall be returned to the COR
(identified in Section G) within fifteen (15) working days after contract award or from the date of hire for new employees.
1.3.6 Safety Equipment / Personal Protective Equipment (PPE)
The contractor shall provide PPE and PPE training In Accordance With (IAW) reference 2.8 to their employees to accomplish the tasks in this SOW. The Contractor is responsible, at no additional cost to the Government, for the replacement of employee’s PPE. The minimum PPE required for this SOW is as follows:
DOL Labor Category Minimum PPE required
Word Processor III hard hat, safety glasses, leather gloves, ear plugs and safety shoes (steel toe)
Administrative Assistant hard hat, safety glasses, ear plugs and safety shoes (steel toe)
Supply Technician hard hat, safety glasses, leather gloves, ear plugs and safety shoes (steel toe)
Engineering Technician IV (Preventative Maintenance
Coordinator) hard hat, safety glasses, safety shoes (steel toe),suits such as Tyvek (or equivalent), leather gloves and ear plugs
Electrician, Maintenance hard hat, safety glasses, safety shoes (steel toe), full body harness, leather gloves, ear plugs, respirator with
P-100 filter, suits such as Tyvek (or equivalent), goggles and face shield
Electronic Technician Maintenance III hard hat, safety glasses, safety shoes (steel toe), full body harness, leather gloves, ear plugs, respirator with
P-100 filter, suits such as Tyvek (or equivalent), goggles and face shield
Engineering Technician V (Facilities Electrical Support) hard hat, safety glasses, safety shoes (steel toe), full body harness, respirator with P-100 filter, goggles, leather gloves, suits such as Tyvek (or equivalent), ear plugs and face shield
Heating, Ventilation & Air-Conditioning Mechanic hard hat, safety glasses, safety shoes (steel toe), full body harness, leather gloves, ear plugs, respirator with
P-100 filter, suits such as Tyvek (or equivalent), goggles and face shield
Heating, Ventilation & Air-Conditioning Mechanic
(Engineering Technician V) hard hat, safety glasses, safety shoes (steel toe), full body harness, leather gloves, ear plugs, respirator with
P-100 filter, suits such as Tyvek (or equivalent),goggles and face shield
Pipefitter, Maintenance hard hat, safety glasses, safety shoes (steel toe), full body harness, leather gloves, ear plugs, respirator with
P-100 filter, suits such as Tyvek (or equivalent), goggles and face shield
Machinery Maintenance Mechanic hard hat, safety glasses, safety shoes (steel toe), full body harness, leather gloves, ear plugs, respirator with
P-100 filter, suits such as Tyvek (or equivalent), goggles and face shield
Ground Support Equipment Worker hard hat, safety glasses, safety shoes (steel toe), full body harness, respirator with P-100 filter, goggles, leather gloves, suits such as Tyvek (or equivalent), ear plugs and face shield
Dispatcher, Motor Vehicle hard hat, safety glasses, safety shoes (steel toe) and ear plugs
Maintenance Trades Helper hard hat, safety glasses, safety shoes (steel toe), full body harness, leather gloves, ear plugs , respirator with
P-100 filter, goggles, suits such as Tyvek (or equivalent) and face shield
Tools and Parts Attendant hard hat, safety glasses, safety shoes (steel toe), leather gloves, ear plugs, respirator with P-100 filter, suits such as Tyvek (or equivalent) goggles and face shield
Welder, Combination, Maintenance hard hat, safety glasses, safety shoes (steel toe), full body harness, respirator with P-100 filter, goggles, welding gloves, welding hood, welding jacket, leather gloves, suits such as Tyvek (or equivalent), ear plugs and face shield
Bicycle Repairer hard hat, safety glasses, safety shoes (steel toe), goggles, leather gloves, suits such as Tyvek (or equivalent), ear plugs and face shield
1.3.7 Business Behavior
Contractor employees shall conduct business in a professional manner as military and Government officials will often observe them while performing their prescribed duties.
1.3.8 Weight Lifting Requirement
Contractor employees shall be able to lift up to 50 pounds. If an item is over 50 pounds, the two (2) man-rules or use of material handling equipment will be utilized.
1.3.9 Required Mobility
The contractor’s employees shall be required to walk, stand, climb stairs, have dexterity as well as have visual skills in order to assess work requirements and/or command moves (section 1.3.1) as required to complete assigned tasks.
1.3.10 Applicable Laws, Codes, and Regulations
The contractor’s employees shall ensure all work performed under this contract is in accordance with the requirements of Section 2, as it pertains to the SOW.
1.3.11 General Support
The contractor’s employees shall provide ancillary general support in the area of various SWRMC command and departmental/divisional programs and functions such as attend meetings, training, and conferences, when required by the COR and as directed by the contractor lead or supervisor (i.e. team lead, program manager).
1.3.12 Voluntary Protection Program
The contractor’s employees shall participate in SWRMC’s Voluntary Protection Program (VPP), and shall attend applicable VPP events, workload permitting, as determined by SWRMC IAW reference
2.4.
1.3.13 TRAINING REQUIREMENTS
The contractor shall accomplish all general DOD/DON mandatory “mando” training requirements, as required. Contractor management shall track and provide results of completion for all contractors training to the SWRMC Training Division, when requested.
1.3.14 Fall Protection Gear
Contractor’s personnel are required to have a full body harness PPE, as listed in paragraph 1.3.6, and shall conduct visual inspections on full body harness prior to each use IAW reference 2.3.
1.4 Place of Performance
The normal place of performance under this contract shall be at SWRMC Facilities at Naval Base San
Diego. Other locations are at Naval Base Coronado (North Island), and Naval Base Point Loma, however, only as an on needed basis. There will be no performance conducted aboard U.S. Naval ships.
Transportation to the other locations will be conducted via Government vehicles.
1.5 Security
A Department of Defense Contract Security Classification Specification (DD254) form is not required;
however, contractor’s employees shall be accompanied and escorted at all times by Government personnel into controlled areas with authorized access.
1.6 Working Hours
1.6.1 Regular Working Hours:
Regular (normal) working hours under the terms of this contract are from 6:30 AM through 3:00 PM
(PST), Monday through Friday except for Federal Holidays (New Year’s Day, Martin Luther King Jr.’s
Birthday, Washington’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day).
1.6.2 Work Outside Regular Working Hours:
Except as specified, all work will be performed during regular working hours. Overtime work may be required for extended weekday hours and weekend work, for which the contractor’s employees shall be available to support. The SWRMC COR will approve all premium hours and unusual shift work prior to being worked.
2. APPLICABLE REFERENCES/DOCUMENTS
2.1 Contractor’s employees shall comply with applicable federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
2.2 Various U.S. Navy, military, and industrial technical documents (to include manufacturer’s specifications and standards, handbooks, and technical manuals) will be required to perform the duties described within the
SOW. Additionally, as applicable, the contractor’s employees shall coordinate with the COR or a SWRMC
Facilities Representative, in order to gain access to required documents via the SWRMC Technical Library or any other available resources. When technical documents are required from an original equipment manufacturer (OEM), the contractor’s employees shall coordinate with the COR or a SWRMC Facilities
Representative, in order to gain access to the specific document(s), and shall ensure that any and all proprietary rights are observed. The contractor shall maintain an accurate accounting of all regulations, specifications, and relevant documentation utilized in the performance of work under this contract.
2.3 SWRMCINST 5100.8A, Naval Occupational Safety and Health (NAVOSH) Manual
2.4 SWRMCINST 5100.9, Voluntary Protection Program (VPP) Recognition.
2.5 SWRMCINST 11240.2B, Policy and Procedure for testing and Licensing Responsibilities of self-propelled
Motor Vehicle Operators.
2.6 NAVFAC P-307, Weight Handling Program Management
2.7 NAVFAC P300, Management of Civil Engineering Support Equipment
2.8 NAVSUP 538, Management of Materials Handling Equipment (MHE) and Shipboard Mobile Support
Equipment (SMSE)
2.9 SWRMCINST 5090.1A, Management of Navy Generated Hazardous Waste and Disposal Control
3. REQUIREMENTS
3.1 The contractor shall be able to fulfill the entire contract supporting hours within sixty (60) calendar days of contract award.
3.2 The contractor shall be able to back fill a vacancy within forty five (45) calendar days of position vacancy start date.
3.3 For Sections 3.4 through 3.13, the contractor’s employees shall meet and fully comply with the General
Requirements Section of SOW (Sections 1 through 3).
3.4 FACILITIES MECHANICAL SUPPORT
3.4.1 Repair and maintain industrial equipment in accordance with diagrams, sketches, operation manuals, and manufacturer’s specifications on all machinery and mechanical equipment, including engines, motors, pneumatic tools, and production machines and equipment, via the use of hand tools, power tools, and precision-measuring and testing instruments, as needed.
3.4.2 Perform preventative and corrective maintenance tasks associated with the upkeep and operation of various types of equipment, based on a maintenance schedule provided by the Government.
3.4.3 Troubleshoot, perform and/or assist SWRMC personnel in operational testing, removals/installations, alignments, assembly/disassembly and equipment inspections, as needed.
3.4.4 Set up and operate lathes, drill presses, grinders, and other metalworking tools to make and repair parts.
3.4.5 Rebuild a Gusher 7550 series centrifugal pump, a Dynamic Fluid gear pump (model# GP-F20-16-P1-A), and an ARO Double Diaphragm Pump (model# 6661A3-34B-C) as required.
3.4.6 Rebuild centrifuges, gears, vane pumps, hydraulic systems, rubber conveyor belts, and pillow block bearings.
3.4.7 Perform preventive maintenance and OEM repairs on Computer Numerical Controls (CNC), which would also include gear replacement and alignment.
3.4.8 Repair screw augers, which would also include bearing replacement and alignment.
3.4.9 Make precise adjustments for alignments, parallelism, and concentricity due to the continuing effect
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .