SF 30 Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Marine Boatyard Services, newest first.
File Type Posted
N55236-15-R-0008-0004.pdf PDF
Exhibit_A-K_Revised_6-15-15.xls XLS spreadsheet
Exhibit_A-K_Revised_6-15-2015.xls XLS spreadsheet
N55236-15-R-0008-0003.pdf PDF
Exhibit_A-K_Revised_6-11-15.xls XLS spreadsheet
N55236-15-R-0008-0001.pdf PDF
Exhibit_A-K.xls XLS spreadsheet
N55236-15-R-0008.doc DOC document
J-1_-_Reference_Information_Sheet.docx DOCX document
J-3_-_Request_for_Specification_Clarification_Form.doc DOC document
J-4_Small_Boat_Listing.docx DOCX document
Exhibit_L_CDRLs__N55236-15-R-0008.docx DOCX document
J-2_-DD254.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N5523615R0008

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answer requests for specification clarification.

All other terms and conditions of the solicitation remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N55236-15-R-0008

X 9B. DATED (SEE ITEM 11)

18-May-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jun-2015

CODE

SOUTHWEST REGIONAL MAINTENANCE CENTER

CODE 410 3755 BRINSER STREET, STE 1

SAN DIEGO CA 92136

N55236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

N55236-15-R-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS 2

1. Item B.3.b on page 16 of 85 states, under facility requirements that apply to Lot II, in Section B.3.b.(i), that

Contractor must have dockside slips capable of docking two (2) 135’ LCUs, 10’ draft and in subsection (ii) navigable water minimum 10' depth at mean low water.

Does the government intend to compete work that does not require dry docking of Lot II vessels, but which can be performed pierside at the vessels' homeport, among all qualified ship repair small business contractors if we are not Lot II contract holders?

Answer: No, only qualified Lot II contractors can bid on Lot II work.

2. 6.0 of Section L states: Each offer must submit either written confirmation of an approved QMS, or written confirmation that a QMS Plan has been submitted for evaluation. If a QMS Plan is not submitted for evaluation with the proposal, then the offeror will not be considered for award of the basic contract. Further, if a contractor does not have an approved QMS, the contractor will not be eligible for subsequent delivery order awards.

Question: We are unsure if the intent is for the QMS manual to be submitted if an offeror has a QMS approved by SWRMC. Please clarify.

Answer: If the offeror has a SWRMC approved QMS on file, we only require proof via written confirmation such as an approval letter that the plan has been approved. There is no need to submit another manual if their

QMS has already been approved.

(End of Summary of Changes)