N55236-15-R-0008-0001.pdf
PDF 25 KB Posted
- Attached to
- Marine Boatyard Services Federal contract opportunity
- Solicitation number
- N55236-15-R-0008
About this file
SF 30 Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N55236-15-R-0008-0004.pdf | ||
| Exhibit_A-K_Revised_6-15-15.xls | XLS spreadsheet | |
| Exhibit_A-K_Revised_6-15-2015.xls | XLS spreadsheet | |
| Exhibit_A-K_Revised_6-11-15.xls | XLS spreadsheet | |
| N55236-15-R-0008-0003.pdf | ||
| N55236-15-R-0008-0002.pdf | ||
| Exhibit_L_CDRLs__N55236-15-R-0008.docx | DOCX document | |
| J-2_-DD254.docx | DOCX document | |
| Exhibit_A-K.xls | XLS spreadsheet | |
| N55236-15-R-0008.doc | DOC document | |
| J-1_-_Reference_Information_Sheet.docx | DOCX document | |
| J-3_-_Request_for_Specification_Clarification_Form.doc | DOC document | |
| J-4_Small_Boat_Listing.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N5523615R0008
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Answer requests for specification clarification.
2. Remove clause HQ L-0009 in its entirety from Section L of the solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N55236-15-R-0008
X 9B. DATED (SEE ITEM 11)
18-May-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-May-2015
CODE
SOUTHWEST REGIONAL MAINTENANCE CENTER
CODE 410 3755 BRINSER STREET, STE 1
SAN DIEGO CA 92136
N55236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
N55236-15-R-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
1. IAW the Solicitation Document under Section C description of Specification, section C.5 A(2) the specification document states that for Lot I services (2) All office, shop, and storage facilities for the contractor may be at a single site or various sites. Lot I contractor(s) sites shall be in San Diego County.
Any satellite locations available to support work shall be within San Diego County. As the OEM provider for a significant number of the craft designated under Lot 1, placing a geographical restriction to San Diego
County on this specification effectively eliminates the OEM from participating in this solicitation. An OEM who is experienced in production and repair of craft is best positioned to provide the highest quality and most cost effective support to the government in this case. Based on this, will the Navy remove the geographic restriction to San Diego County or expand the restriction area to include Orange and Los
Angeles Counties for Lot 1 Craft?
Answer: Due to quantity of contracts in Lot I, government personnel cannot afford to leave San Diego area every day for oversight/check points of a certain availability project. SWRMC Small Boat IDIQ Contract Lot I restriction of location in San Diego area will stay as is.
2. IAW the Solicitation Document under Section C description of Specification, section C.5 A(2) the specification document states that for Lot I services (2) All office, shop, and storage facilities for the contractor may be at a single site or various sites. Lot I contractor(s) sites shall be in San Diego County.
Any satellite locations available to support work shall be within San Diego County. With this restriction for craft work to San Diego County for Lot I craft, is it allowable for a contractor to conduct the physical work on the craft at the contractors location in San Diego County while the Contract administration/management and oversight is completed in a location in an adjoining county outside of San
Diego County (Orange)?
Answer: A contractor satellite facility within San Diego county where the actual repairs of crafts will occur is acceptable provided the facility will be IAW the IDIQ specifications. Be advised that multiple check points every day and a weekly production meeting will be accomplished within the San Diego county also, where prime contractor presence is mandatory.
3. The solicitation incorporates clause HQ L-2-0009 requires a small business subcontracting plan. Should this clause be deleted from the solicitation since this solicitation is for a small business contract?
Answer: Yes, this clause will be removed as it does not apply to the small businss set-aside procurement..
4. Proposal instruction require submission of Section 4.0 Techinical Capability, Section 5.0 Past Performance, and Section 6.0 Quality Assurance. Will be acceptable if KTR combines all sections into one volume containing all three sections?
Answer: Yes this will be acceptable as long as all required originals and copies are made available.
N55236-15-R-0008
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been deleted:
HQ L-2-0009 SMALL BUSINESS SUBCONTRACTING PLAN JUN 1999
(End of Summary of Changes)
File details come from the government source that posted it. Updated .