Exhibit_A-K_Revised_6-15-15.xls

XLS spreadsheet 112 KB Posted

Attached to
Marine Boatyard Services Federal contract opportunity
Solicitation number
N55236-15-R-0008
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Correct Exhibit A-K for Amendment 4. Disregard previous attachment dated 6-15-2015

View the file

Other files for this federal contract opportunity

Other files attached to Marine Boatyard Services, newest first.
File Type Posted
N55236-15-R-0008-0004.pdf PDF
Exhibit_A-K_Revised_6-15-2015.xls XLS spreadsheet
Exhibit_A-K_Revised_6-11-15.xls XLS spreadsheet
N55236-15-R-0008-0003.pdf PDF
N55236-15-R-0008-0002.pdf PDF
N55236-15-R-0008-0001.pdf PDF
Exhibit_A-K.xls XLS spreadsheet
N55236-15-R-0008.doc DOC document
J-1_-_Reference_Information_Sheet.docx DOCX document
J-3_-_Request_for_Specification_Clarification_Form.doc DOC document
Exhibit_L_CDRLs__N55236-15-R-0008.docx DOCX document
J-2_-DD254.docx DOCX document
J-4_Small_Boat_Listing.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICING SUMMARY

PRICING SUMMARY
LOT IBASE YEAR$ 4,085,098.00
LOT IOPTION YEAR 1$ 4,085,098.00
LOT IOPTION YEAR 2$ 4,085,098.00
LOT IOPTION YEAR 3$ 4,085,098.00
LOT IOPTION YEAR 4$ 4,085,098.00
TOTAL$ 20,425,490.00
LOT IIBASE YEAR$3,941,586.00
LOT IIOPTION YEAR 1$3,941,586.00
LOT IIOPTION YEAR 2$3,941,586.00
LOT IIOPTION YEAR 3$3,941,586.00
LOT IIOPTION YEAR 4$3,941,586.00
TOTAL$19,707,930.00
ALL YEARS$ 40,133,420.00

LOT I - BASE-EXHIBIT A

Supplies/Services LOT I Base YearEst QtyUnitUnit
PriceAmount
A001LABOR & MATERIALS
LABOR145,562MH$0.00
MATERIALS*2,085,098U.S. DOLLARS$2,085,098.00
A002Boat Storage up to 30 feet or 9 meter in length (on land)50DAYS$0.00
A003Boat Storage up to 30 feet or 9 meter in length (wet slip)100DAYS$0.00
A004Boat Storage 30 feet or 9 meter up to 49 feet or 15 meter in length (on land)50DAYS$0.00
A005Boat Storage 30 feet or 9 meter up to 49 feet or 15 meter in length (wet slip)100DAYS$0.00
A006Trailer/Haul boat/trailer from San Diego area to contractor's facility, shorter than 30 ft. or 9 meter100EA$0.00
A007Trailer/Haul boat/trailer from contractor's facility to San Diego area Naval Facilities area, shorter than 30 ft. or 9 meter100EA$0.00
A008Trailer/Haul boat/trailer from San Diego area Naval Facilities area to contractor's facility, 30 ft. or 9 meter to 49 ft. or 15 meter100EA$0.00
A009Trailer/Haul boat/trailer from contractor's facility to San Diego area Naval Facilities area, 30 ft. or 9 meter to 49 ft. or 15 meter100EA$0.00
A010Boat Lift 0 to 49 feet in length10EA$0.00
A011OVER AND ABOVE WORK - LOT 1, BASE YEAR
LABOR25,000MH$0.00
OT LABOR22,500MH$0.00
MATERIALS*2,000,000U.S. DOLLARS$2,000,000.00
Total Estimate for Base Year$4,085,098.00
*For ELIN A001 and A011, MATERIALS, offerors shall propose a material handling rate for the unit price.

LOT I - OPTION YEAR 1-EXHIBIT B

Supplies/Services LOT I Option Year 1Est QtyUnitUnit
PriceAmount
B001LABOR & MATERIALS
LABOR145,562MH$0.00
MATERIALS*2,085,098U.S. DOLLARS$2,085,098.00
B002Boat Storage up to 30 feet or 9 meter in length (on land)50DAYS$0.00
B003Boat Storage up to 30 feet or 9 meter in length (wet slip)100DAYS$0.00
B004Boat Storage 30 feet or 9 meter up to 49 feet or 15 meter in length (on land)50DAYS$0.00
B005Boat Storage 30 feet or 9 meter up to 49 feet or 15 meter in length (wet slip)100DAYS$0.00
B006Trailer/Haul boat/trailer from San Diego area to contractor's facility, shorter than 30 ft. or 9 meter100EA$0.00
B007Trailer/Haul boat/trailer from contractor's facility to San Diego area Naval Facilities area, shorter than 30 ft. or 9 meter100EA$0.00
B008Trailer/Haul boat/trailer from San Diego area Naval Facilities area to contractor's facility, 30 ft. or 9 meter to 49 ft. or 15 meter100EA$0.00
B009Trailer/Haul boat/trailer from contractor's facility to San Diego area Naval Facilities area, 30 ft. or 9 meter to 49 ft. or 15 meter100EA$0.00
B010Boat Lift 0 to 49 feet in length10EA$0.00
B011OVER AND ABOVE WORK - LOT 1, OPTION YEAR 1
LABOR25,000MH$0.00
OT LABOR22,500MH$0.00
MATERIALS*2,000,000U.S. DOLLARS$2,000,000.00
Total Estimate for Option Year 1$4,085,098.00
*For ELIN B001 and B011, MATERIALS, offerors shall propose a material handling rate for the unit price.

LOT I - OPTION YEAR 2-EXHIBIT C

Supplies/Services LOT I Option Year 2Est QtyUnitUnit
PriceAmount
C001LABOR & MATERIALS
LABOR145,562MH$0.00
MATERIALS*2,085,098U.S. DOLLARS$2,085,098.00
C002Boat Storage up to 30 feet or 9 meter in length (on land)50DAYS$0.00
C003Boat Storage up to 30 feet or 9 meter in length (wet slip)100DAYS$0.00
C004Boat Storage 30 feet or 9 meter up to 49 feet or 15 meter in length (on land)50DAYS$0.00
C005Boat Storage 30 feet or 9 meter up to 49 feet or 15 meter in length (wet slip)100DAYS$0.00
C006Trailer/Haul boat/trailer from San Diego area to contractor's facility, shorter than 30 ft. or 9 meter100EA$0.00
C007Trailer/Haul boat/trailer from contractor's facility to San Diego area Naval Facilities area, shorter than 30 ft. or 9 meter100EA$0.00
C008Trailer/Haul boat/trailer from San Diego area Naval Facilities area to contractor's facility, 30 ft. or 9 meter to 49 ft. or 15 meter100EA$0.00
C009Trailer/Haul boat/trailer from contractor's facility to San Diego area Naval Facilities area, 30 ft. or 9 meter to 49 ft. or 15 meter100EA$0.00
C010Boat Lift 0 to 49 feet in length10EA$0.00
C011OVER AND ABOVE WORK - LOT 1, OPTION YEAR 2
LABOR25,000MH$0.00
OT LABOR22,500MH$0.00
MATERIALS*2,000,000U.S. DOLLARS$2,000,000.00
Total Estimate for Option Year 2$4,085,098.00
*For ELIN C001 and C011, MATERIALS, offerors shall propose a material handling rate for the unit price.

LOT I - OPTION YEAR 3-EXHIBIT D

Supplies/Services LOT I Option Year 3Est QtyUnitUnit
PriceAmount
D001LABOR & MATERIALS
LABOR145,562MH$0.00
MATERIALS*2,085,098U.S. DOLLARS$2,085,098.00
D002Boat Storage up to 30 feet or 9 meter in length (on land)50DAYS$0.00
D003Boat Storage up to 30 feet or 9 meter in length (wet slip)100DAYS$0.00
D004Boat Storage 30 feet or 9 meter up to 49 feet or 15 meter in length (on land)50DAYS$0.00
D005Boat Storage 30 feet or 9 meter up to 49 feet or 15 meter in length (wet slip)100DAYS$0.00
D006Trailer/Haul boat/trailer from San Diego area to contractor's facility, shorter than 30 ft. or 9 meter100EA$0.00
D007Trailer/Haul boat/trailer from contractor's facility to San Diego area Naval Facilities area, shorter than 30 ft. or 9 meter100EA$0.00
D008Trailer/Haul boat/trailer from San Diego area Naval Facilities area to contractor's facility, 30 ft. or 9 meter to 49 ft. or 15 meter100EA$0.00
D009Trailer/Haul boat/trailer from contractor's facility to San Diego area Naval Facilities area, 30 ft. or 9 meter to 49 ft. or 15 meter100EA$0.00
D010Boat Lift 0 to 49 feet in length10EA$0.00
D011OVER AND ABOVE WORK - LOT 1, OPTION YEAR 3
LABOR25,000MH$0.00
OT LABOR22,500MH$0.00
MATERIALS*2,000,000U.S. DOLLARS$2,000,000.00
Total Estimate for Option Year 3$4,085,098.00
*For ELIN D001 and D011, MATERIALS, offerors shall propose a material handling rate for the unit price.

LOT I - OPTION YEAR 4-EXHIBIT E

Supplies/Services LOT I Option Year 4Est QtyUnitUnit
PriceAmount
E001LABOR & MATERIALS
LABOR145,562MH$0.00
MATERIALS*2,085,098U.S. DOLLARS$2,085,098.00
E002Boat Storage up to 30 feet or 9 meter in length (on land)50DAYS$0.00
E003Boat Storage up to 30 feet or 9 meter in length (wet slip)100DAYS$0.00
E004Boat Storage 30 feet or 9 meter up to 49 feet or 15 meter in length (on land)50DAYS$0.00
E005Boat Storage 30 feet or 9 meter up to 49 feet or 15 meter in length (wet slip)100DAYS$0.00
E006Trailer/Haul boat/trailer from San Diego area to contractor's facility, shorter than 30 ft. or 9 meter100EA$0.00
E007Trailer/Haul boat/trailer from contractor's facility to San Diego area Naval Facilities area, shorter than 30 ft. or 9 meter100EA$0.00
E008Trailer/Haul boat/trailer from San Diego area Naval Facilities area to contractor's facility, 30 ft. or 9 meter to 49 ft. or 15 meter100EA$0.00
E009Trailer/Haul boat/trailer from contractor's facility to San Diego area Naval Facilities area, 30 ft. or 9 meter to 49 ft. or 15 meter100EA$0.00
E010Boat Lift 0 to 49 feet in length10EA$0.00
E011OVER AND ABOVE WORK - LOT 1, OPTION YEAR 4
LABOR25,000MH$0.00
OT LABOR22,500MH$0.00
MATERIALS*2,000,000U.S. DOLLARS$2,000,000.00
Total Estimate for Option Year 4$4,085,098.00
*For ELIN E001 and E011, MATERIALS, offerors shall propose a material handling rate for the unit price.

LOT II-BASE-EXHIBIT F

Supplies/Services LOT II Base YearEst QtyUnitUnit
PriceAmount
F012LABOR & MATERIALS
LABOR142,398MH$0.00
MATERIALS*1,941,586U.S. DOLLARS$1,941,586.00
F013Boat Storage (on land) 50 to 100 feet in length50DAYS$0.00
F014Boat Storage (on land) 101 to 150 feet in length50EA$0.00
F015Boat Storage (on land) 151 to 300 feet in length10EA$0.00
F016Boat Storage (wet slip) 50 to 100 feet in length50EA$0.00
F017Boat Storage (wet slip) 101 to 150 feet in length50EA$0.00
F018Boat Storage (wet slip) 151 to 300 feet in length10EA$0.00
F019Boat Lift 50 to 100 feet in length25EA$0.00
F020Boat Lift 101 to 150 feet in length25EA$0.00
F021Boat Lift 151 to 300 feet in length5EA$0.00
F022Tow from San Diego area Naval Facilities area to contractor's facility, 50 ft. to 100 ft25EA$0.00
F023Tow from contractor's facility to San Diego area Naval Facilities area, 50 ft. to 100 ft25EA$0.00
F024Tow from San Diego area Naval Faclities area to contractor's facility, 101 ft. to 150 ft10EA$0.00
F025Tow from contractor's facility to San Diego area Naval Facilities area, 101 ft. to 150 ft10EA$0.00
F026Tow from San Diego area Naval Facilities area to contractor's facility, 151 ft. to 300 ft5EA$0.00
F027Tow from contractor's facility to San Diego area Naval Facilities area, 151 ft. to 300 ft5EA$0.00
F028OVER AND ABOVE WORK - LOT 2, BASE YEAR
LABOR25,000MH$0.00
OT LABOR22,500MH$0.00
MATERIALS*2,000,000U.S. DOLLARS$2,000,000.00
Total Estimate for Base Year$3,941,586.00
*For ELIN F012 and F028, MATERIALS, offerors shall propose a material handling rate for the unit price.

LOT II-OPTION YEAR 1-EXHIBIT G

Supplies/Services LOT II Option Year 1Est QtyUnitUnit
PriceAmount
G012LABOR & MATERIALS
LABOR142,398MH$0.00
MATERIALS*1,941,586U.S. DOLLARS$1,941,586.00
G013Boat Storage (on land) 50 to 100 feet in length50DAYS$0.00
G014Boat Storage (on land) 101 to 150 feet in length50EA$0.00
G015Boat Storage (on land) 151 to 300 feet in length10EA$0.00
G016Boat Storage (wet slip) 50 to 100 feet in length50EA$0.00
G017Boat Storage (wet slip) 101 to 150 feet in length50EA$0.00
G018Boat Storage (wet slip) 151 to 300 feet in length10EA$0.00
G019Boat Lift 50 to 100 feet in length25EA$0.00
G020Boat Lift 101 to 150 feet in length25EA$0.00
G021Boat Lift 151 to 300 feet in length5EA$0.00
G022Tow from San Diego area Naval Facilities area to contractor's facility, 50 ft. to 100 ft25EA$0.00
G023Tow from contractor's facility to San Diego area Naval Facilities area, 50 ft. to 100 ft25EA$0.00
G024Tow from San Diego area Naval Faclities area to contractor's facility, 101 ft. to 150 ft10EA$0.00
G025Tow from contractor's facility to San Diego area Naval Facilities area, 101 ft. to 150 ft10EA$0.00
G026Tow from San Diego area Naval Facilities area to contractor's facility, 151 ft. to 300 ft5EA$0.00
G027Tow from contractor's facility to San Diego area Naval Facilities area, 151 ft. to 300 ft5EA$0.00
G028OVER AND ABOVE WORK - LOT 2, OPTION YEAR 1
LABOR25,000MH$0.00
OT LABOR22,500MH$0.00
MATERIALS*2,000,000U.S. DOLLARS$2,000,000.00
Total Estimate for Option Year 1$3,941,586.00
*For ELIN G012 and G028, MATERIALS, offerors shall propose a material handling rate for the unit price.

LOT II-OPTION YEAR 2-EXHIBIT H

Supplies/Services LOT II Option Year 2Est QtyUnitUnit
PriceAmount
H012LABOR & MATERIALS
LABOR142,398MH$0.00
MATERIALS*1,941,586U.S. DOLLARS$1,941,586.00
H013Boat Storage (on land) 50 to 100 feet in length50DAYS$0.00
H014Boat Storage (on land) 101 to 150 feet in length50EA$0.00
H015Boat Storage (on land) 151 to 300 feet in length10EA$0.00
H016Boat Storage (wet slip) 50 to 100 feet in length50EA$0.00
H017Boat Storage (wet slip) 101 to 150 feet in length50EA$0.00
H018Boat Storage (wet slip) 151 to 300 feet in length10EA$0.00
H019Boat Lift 50 to 100 feet in length25EA$0.00
H020Boat Lift 101 to 150 feet in length25EA$0.00
H021Boat Lift 151 to 300 feet in length5EA$0.00
H022Tow from San Diego area Naval Facilities area to contractor's facility, 50 ft. to 100 ft25EA$0.00
H023Tow from contractor's facility to San Diego area Naval Facilities area, 50 ft. to 100 ft25EA$0.00
H024Tow from San Diego area Naval Faclities area to contractor's facility, 101 ft. to 150 ft10EA$0.00
H025Tow from contractor's facility to San Diego area Naval Facilities area, 101 ft. to 150 ft10EA$0.00
H026Tow from San Diego area Naval Facilities area to contractor's facility, 151 ft. to 300 ft5EA$0.00
H027Tow from contractor's facility to San Diego area Naval Facilities area, 151 ft. to 300 ft5EA$0.00
H028OVER AND ABOVE WORK - LOT 2, OPTION YEAR 2
LABOR25,000MH$0.00
OT LABOR22,500MH$0.00
MATERIALS*2,000,000U.S. DOLLARS$2,000,000.00
Total Estimate for Option Year 2$3,941,586.00
*For ELIN H012 and H028, MATERIALS, offerors shall propose a material handling rate for the unit price.

LOT II-OPTION YEAR 3-EXHIBIT J

Supplies/Services LOT II Option Year 3Est QtyUnitUnit
PriceAmount
J012LABOR & MATERIALS
LABOR142,398MH$0.00
MATERIALS*1,941,586U.S. DOLLARS$1,941,586.00
J013Boat Storage (on land) 50 to 100 feet in length50DAYS$0.00
J014Boat Storage (on land) 101 to 150 feet in length50EA$0.00
J015Boat Storage (on land) 151 to 300 feet in length10EA$0.00
J016Boat Storage (wet slip) 50 to 100 feet in length50EA$0.00
J017Boat Storage (wet slip) 101 to 150 feet in length50EA$0.00
J018Boat Storage (wet slip) 151 to 300 feet in length10EA$0.00
J019Boat Lift 50 to 100 feet in length25EA$0.00
J020Boat Lift 101 to 150 feet in length25EA$0.00
J021Boat Lift 151 to 300 feet in length5EA$0.00
J022Tow from San Diego area Naval Facilities area to contractor's facility, 50 ft. to 100 ft25EA$0.00
J023Tow from contractor's facility to San Diego area Naval Facilities area, 50 ft. to 100 ft25EA$0.00
J024Tow from San Diego area Naval Faclities area to contractor's facility, 101 ft. to 150 ft10EA$0.00
J025Tow from contractor's facility to San Diego area Naval Facilities area, 101 ft. to 150 ft10EA$0.00
J026Tow from San Diego area Naval Facilities area to contractor's facility, 151 ft. to 300 ft5EA$0.00
J027Tow from contractor's facility to San Diego area Naval Facilities area, 151 ft. to 300 ft5EA$0.00
J028OVER AND ABOVE WORK - LOT 2, OPTION YEAR 3
LABOR25,000MH$0.00
OT LABOR22,500MH$0.00
MATERIALS*2,000,000U.S. DOLLARS$2,000,000.00
Total Estimate for Option Year 3$3,941,586.00
*For ELIN J012 and J028, MATERIALS, offerors shall propose a material handling rate for the unit price.

LOT II-OPTION YEAR 4-EXHIBIT K

Supplies/Services LOT II Option Year 4Est QtyUnitUnit
PriceAmount
K012LABOR & MATERIALS
LABOR142,398MH$0.00
MATERIALS*1,941,586U.S. DOLLARS$1,941,586.00
K013Boat Storage (on land) 50 to 100 feet in length50DAYS$0.00
K014Boat Storage (on land) 101 to 150 feet in length50EA$0.00
K015Boat Storage (on land) 151 to 300 feet in length10EA$0.00
K016Boat Storage (wet slip) 50 to 100 feet in length50EA$0.00
K017Boat Storage (wet slip) 101 to 150 feet in length50EA$0.00
K018Boat Storage (wet slip) 151 to 300 feet in length10EA$0.00
K019Boat Lift 50 to 100 feet in length25EA$0.00
K020Boat Lift 101 to 150 feet in length25EA$0.00
K021Boat Lift 151 to 300 feet in length5EA$0.00
K022Tow from San Diego area Naval Facilities area to contractor's facility, 50 ft. to 100 ft25EA$0.00
K023Tow from contractor's facility to San Diego area Naval Facilities area, 50 ft. to 100 ft25EA$0.00
K024Tow from San Diego area Naval Faclities area to contractor's facility, 101 ft. to 150 ft10EA$0.00
K025Tow from contractor's facility to San Diego area Naval Facilities area, 101 ft. to 150 ft10EA$0.00
K026Tow from San Diego area Naval Facilities area to contractor's facility, 151 ft. to 300 ft5EA$0.00
K027Tow from contractor's facility to San Diego area Naval Facilities area, 151 ft. to 300 ft5EA$0.00
K028OVER AND ABOVE WORK - LOT 2, OPTION YEAR 4
LABOR25,000MH$0.00
OT LABOR22,500MH$0.00
MATERIALS*2,000,000U.S. DOLLARS$2,000,000.00
Total Estimate for Option Year 4$3,941,586.00
*For ELIN K012 and K028, MATERIALS, offerors shall propose a material handling rate for the unit price.