STATEMENT_OF_WORK_(REV_-_1).pdf
PDF 211 KB Posted
- Attached to
- ACCOMPLISH NET-018 LAYER 1 CABLING FOR BLDG 3339/2ND FLOOR Federal contract opportunity
- Solicitation number
- N55236-15-Q-0018
About this file
Statement of Work (REV - 1).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0005-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf | ||
| Attachment_Dept_of_Labor_Wage_Det._05-2057_Rev_15.htm | HTM file | |
| bldg3339-fl2-a1.pdf | ||
| third-party_infrastructure_installs_br_20130131.pdf | ||
| Amendment_0004-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf | ||
| bldg3339-fl2-b1.pdf | ||
| DoD_UFC_RCDD.pdf | ||
| Amendment_0003_-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf | ||
| Amendment_0002_-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf | ||
| bldg3339-fl2-2b.pdf | ||
| Amendment_0001_-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf | ||
| bldg3339-fl2-2a.pdf | ||
| NET-018_SOW_20141104(revised).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA
REGIONAL MAINTENANCE CENTER
SOUTHWEST
STATEMENT OF WORK
Project: NET-018, Layer 1 Cabling, Building 3339, FL 2
Prepared by:
Paul Rising
WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., app 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE – For classified documents, follow the procedures in DoD 5220.22-M, National Industrial Security Program
Operating Manual (NISPOM), Chapter 5, Section 7, or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document angi.encarnacion Sticky Note
(REV - 1)
CHANGE RECORD
Date Version Author Changes Made / Section(s)
25 July 2014 1.0 Paul Rising
1.0 Background
Southwest Regional Maintenance Center (SWRMC) requires the installation of CAT6 cabling in Building 3339, Floor 2 within the specified limits of the statement of work.
2.0 Scope
Requirements are for contractual services to install CAT6 cabling for SWRMC.
3.0 Acronyms and Definitions
EIA Electronics Industry Alliance TR Telecommunications Room TIA Telecommunications Industry Association IDF Intermediate Distribution Frame
4.0 Requirements
The contractor shall provide installation services for the following:
0001. Conduct site survey based upon requirements below.
0002. Install a total of one hundred-one (101) dual CAT6 cables to the twenty-five (25) rooms. These cables will feed from the IDF in room 222.
0003. Terminations must be performed using an 8-pin (RJ45 type) connector, rated for the category of the installed cable. Jack pin/pair configuration must be TIA/EIA-568-B.
0004. Copper data cable length must be limited to 295 feet (90 m) from patch panel termination in the
TR to the data outlet termination in accordance with TIA/EIA-568-B.
0005. Copper outlet/connector must be TIA/EIA category 6 (Cat 6). All connectors must be 8-pin/8-position insulation displacement terminations wired per T568A. Copper cables must not be split between multiple modular connectors.
0006. Cat 6 network cables to be terminated in a patch panel in the network cabinet located in the IDF room.
0007. Install four (4) Cat 6, 48-port patch panels and one (1) Cat6, 24-port patch panel for a total of two-hundred sixteen (216) ports to be located in the network cabinet of the IDF room.
0008. Install (1) 12 strand MM (62.5 micron) fiber optic cable within inner duct from room 222 to room 200. Cable to be terminated in the rear of a fiber patch panel located in room 200 using TIA/EIA type SC-SC connector and in the IDF room. Terminate, test and label new fiber cable.
0009. Plenum cables must be provided in accordance with National Fire Protection Association, Inc.
(NFPA) 70.
0010. Outlet boxes will be approximately 4-inch (102 mm) square by 2-1/4 inch (57 mm) deep boxes and include two blanks position for future applications.
0011. Outlet boxes to be installed twelve (12) inches from the floor.
0012. Install 1" x 1/2" surface-mount raceway from the top of the outlet box to the ceiling using a
Drop Ceiling Entrance End.
0013. Outlet faceplate will use a full faceplate with two blank positions for future applications.
0014. The telecommunications systems labeling must be done in accordance with TIA/EIA-606-A.
a. As a minimum the following must be reflected in the outlet/patch panel labeling:
i. Network
ii. Building Number
iii. Room Number
iv. Alpha or Numeric Designator
1. D1 for primary (yellow cable)
2. D2 for secondary (white cable)
v. Labeling must be a minimum of ¼-inch (6mm) high
vi. Handwritten labels must not be used for the final configuration
vii. Example: SWRMC-3339-209-001 D1/D2 0015. Install conduit sleeves for entrance to each room and a stub up in the IDF, if applicable. Use fire resistant caulking or materials for sealing the conduit and hole.
0016. Install a network cabinet with the following specifications:
a. 24U 48"H x 24"W x 42"D Frame
b. M6 square holes
c. Front Plexi Door
d. Back Mesh Door
e. Side Solid Panel (Pair)
f. Top 3 Fan Panel
g. Keyed Lock
0017. Install a new pathway for all cables installed where applicable.
0018. Terminate, test, and label all cables installed.
0019. Terminate cables from workstations to installed wall ports.
0020. Provide labor and equipment to remove existing, unused cable in the ceiling infrastructure.
0021. Provide as built / record documentation upon completion.
0022. The designer must specify that all telecommunications cable, installed as part of a project, be tested to the commercial standards for that cable system. All test results and certifications must be provided in a report upon completion.
0023. Submit project plan specifying activities and estimated start and finish dates.
0024. The contractor will take measures to cover desks with plastic and to replace any ceiling tiles that are broken.
Room No of Drops Est Dist to TR (ft) Type 200 N/A 209.9 Fiber 203 1 184.5 Copper 204 1 168.5 Copper 205 2 208.8 Copper 206 12 196.66 Copper 209 13 132.5 Copper 208 1 91.4 Copper 208A 1 91.4 Copper 208B 1 108.1 Copper
208C 1 108.1 Copper 210 4 73.7 Copper 210A 1 73.7 Copper 210B 1 57.1 Copper 223 1 95.4 Copper 211 1 107.9 Copper 211A 2 107.9 Copper 211B 1 89.7 Copper 230 5 104.05 Copper 232 19 131.45 Copper 228 13 92.05 Copper 226 17 80.65 Copper 231A 1 196.65 Copper 234 1 217.85 Copper 225 1 114.55 Copper
5.0 Period of Performance
Period of performance is from January 26, 2015 to February 6, 2015.
6.0 Place of Performance
Locations:
Naval Station San Diego Southwest Regional Maintenance Center San Diego, CA 92136 Building 3339, 2nd Floor
7.0 Classification/Security
Unclassified. Security clearance not required.
8.0 Acceptance of Deliverables/ Points of Contact
Primary Angela Encarnacion Contract Specialist 3755 Brinser Street, Suite 1 San Diego, CA 92136 SWRMC, Code 410B Phone: 619-556-5673 Email: angi.encarnacion@navy.mil
Technical Paul Rising
3755 Brinser Street, Suite 1 San Diego, CA 92136 SWRMC, Code 1172 Phone: 619-556-0795 Email: paul.rising@swrmc.navy.mil
9.0 Government Furnished Property
None
10.0 Technical Support
None
Project Manager
Signature Date
Name
| 1.0 Background |
| 2.0 Scope |
| 3.0 Acronyms and Definitions |
| 4.0 Requirements |
| Type |
| Est Dist to TR (ft) |
| No of Drops |
| Room |
| 5.0 Period of Performance |
| 6.0 Place of Performance |
| 7.0 Classification/Security |
| 8.0 Acceptance of Deliverables/ Points of Contact |
| Primary |
| Technical |
| 9.0 Government Furnished Property |
| 10.0 Technical Support |
| 2014-11-24T11:58:40-0800 | |
| RISING.PAUL.D.1132717636 |
| Date: 11/24/2014 |
| Name: Paul Rising |
File details come from the government source that posted it. Updated .