DESCRIPTION OF RE-CABLING WORK.

View the file

Other files for this federal contract opportunity

Other files attached to ACCOMPLISH NET-018 LAYER 1 CABLING FOR BLDG 3339/2ND FLOOR, newest first.
File Type Posted
Amendment_0005-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf PDF
Attachment_Dept_of_Labor_Wage_Det._05-2057_Rev_15.htm HTM file
Amendment_0004-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf PDF
bldg3339-fl2-b1.pdf PDF
DoD_UFC_RCDD.pdf PDF
STATEMENT_OF_WORK_(REV_-_1).pdf PDF
third-party_infrastructure_installs_br_20130131.pdf PDF
bldg3339-fl2-a1.pdf PDF
Amendment_0003_-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf PDF
Amendment_0002_-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf PDF
bldg3339-fl2-2a.pdf PDF
bldg3339-fl2-2b.pdf PDF
Amendment_0001_-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVSEA

REGIONAL MAINTENANCE CENTER

SOUTHWEST

STATEMENT OF WORK

Project: NET-018, Layer 1 Cabling, Bldg 3339, FL 2

Prepared by:

Paul Rising

WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., app 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE – For classified documents, follow the procedures in DoD 5220.22-M, National Industrial Security Program

Operating Manual (NISPOM), Chapter 5, Section 7, or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document

CHANGE RECORD

Date Version Author Changes Made / Section(s)

25 July 2014 1.0 Paul Rising

1.0 Background

Southwest Regional Maintenance Center (SWRMC) requires the installation of CAT6 cabling in Building 3339, Floor 2 within the specified limits of the statement of work. These rates may be adjusted only as a result of revisions to prevailing labor rates provide by the Secretary of Labor.

2.0 Scope

Requirements are for contractual services to install CAT6 cabling for SWRMC.

3.0 Acronyms and Definitions

EIA Electronics Industry Alliance TR Telecommunications Room TIA Telecommunications Industry Association IDF Intermediate Distribution Frame

4.0 Requirements

The contractor shall provide installation services for the following:

0001. Conduct site survey based upon requirements below.

0002. Install a total of ninety-three (99) dual CAT6 cables to the twenty-two (22) rooms. These cables will feed from the IDF in room 222.

0003. Terminations must be performed using an 8-pin (RJ45 type) connector, rated for the category of the installed cable. Jack pin/pair configuration must be T568A per TIA/EIA-568-B.

0004. Copper data cable length must be limited to 295 feet (90 m) from patch panel termination in the

TR to the data outlet termination in accordance with TIA/EIA-568-B.

0005. Copper outlet/connector must be TIA/EIA category 6 (Cat 6). All connectors must be 8-pin/8-position insulation displacement terminations wired per T568A. Copper cables must not be split between multiple modular connectors.

0006. Fiber optic distribution cable must be terminated in cabinet/rack-mounted patch panels using TIA/EIA type LC connector.

0007. Fiber optic cable installed will be 62.5/125-micron.

0008. Plenum cables must be provided in accordance with National Fire Protection Association, Inc.

(NFPA) 70.

0009. Outlet boxes will be approximately 4-inch (102 mm) square by 2-1/4 inch (57 mm) deep boxes and include two blanks position for future applications.

0010. Outlet boxes to be installed twelve (12) inches from the floor.

0011. Install 1" x 1/2" surface-mount raceway from the top of the outlet box to the ceiling using a

Drop Ceiling Entrance End.

0012. Outlet faceplate will use a full faceplate with two blank positions for future applications.

0013. The telecommunications systems labeling must be done in accordance with TIA/EIA-606-A.

a. As a minimum the following must be reflected in the outlet/patch panel labeling:

angi.encarnacion Cross-Out

i. Network

ii. Building Number

iii. Room Number

iv. Alpha or Numeric Designator

1. D1 for primary (blue cable)

2. D2 for secondary (white cable)

v. Labeling must be a minimum of ¼-inch (6mm) high

vi. Handwritten labels must not be used for the final configuration

vii. Example: SWRMC-3339-209-001 D1/D2 0014. Install conduit sleeves for entrance to each room and a stub up in the IDF, if applicable.

0015. Install a network cabinet with the following specifications:

a. 24U 48"H x 24"W x 42"D Frame

b. M6 square holes

c. Front Plexi Door

d. Back Mesh Door

e. Side Solid Panel (Pair)

f. Top 3 Fan Panel

g. Keyed Lock

0016. Install a new pathway for all cables installed where applicable.

0017. Terminate, test, and label all cables installed.

0018. Terminate cables from workstations to installed wall ports.

0019. Install (1) 12 strand MM (62.5 micron) fiber optic cable within inner duct from room 222 to room 200.

0020. Terminate, test and label new fiber cable.

0021. Provide labor and equipment to remove existing, unused cable in the ceiling infrastructure.

0022. Provide as built / record documentation upon completion.

0023. The designer must specify that all telecommunications cable, installed as part of a project, be tested to the commercial standards for that cable system. All test results and certifications must be provided in a report upon completion.

0024. Submit project plan specifying activities and estimated start and finish dates.

0025. Remove all unused cable as identified by SWRMC IT Division.

Room No of Drops Est Dist to TR (ft) Type 100 N/A 209.9 Fiber 203 1 184.5 Copper 204 1 168.5 Copper 205 2 208.8 Copper 206 12 196.66 Copper 209 13 132.5 Copper 208 1 91.4 Copper 208A 1 91.4 Copper 208B 1 108.1 Copper 208C 1 108.1 Copper 210 2 73.7 Copper

210A 1 73.7 Copper 210B 1 57.1 Copper 223 1 95.4 Copper 211A 2 107.9 Copper 211B 1 89.7 Copper 230 5 104.05 Copper 232 19 131.45 Copper 228 13 92.05 Copper 226 17 80.65 Copper 231A 1 196.65 Copper 234 1 217.85 Copper 225 1 114.55 Copper

5.0 Period of Performance

Period of performance is from January 26, 2014 to February 6, 2014.

6.0 Place of Performance

Locations:

Naval Station San Diego Southwest Regional Maintenance Center San Diego, CA 92136 Building 3339, 2nd Floor

7.0 Classification/Security

Unclassified. Security clearance not required.

8.0 Acceptance of Deliverables/Technical Point of Contact

Paul Rising 3755 Brinser Street, Suite 1 San Diego, CA 92136 Phone: 619-556-0795 Email: paul.rising@swrmc.navy.mil

9.0 Government Furnished Property

None

10.0 Technical Support

None angi.encarnacion Cross-Out angi.encarnacion Cross-Out

Project Manager

Signature Date

Name

1.0 Background
2.0 Scope
3.0 Acronyms and Definitions
4.0 Requirements
Type
Est Dist to TR (ft)
No of Drops
Room
5.0 Period of Performance
6.0 Place of Performance
7.0 Classification/Security
8.0 Acceptance of Deliverables/Technical Point of Contact
9.0 Government Furnished Property
10.0 Technical Support