Amendment 0004 to Solicitation N55236-15-Q-0018 to answer contractor's questions and provide other attachments.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0005-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf | ||
| Attachment_Dept_of_Labor_Wage_Det._05-2057_Rev_15.htm | HTM file | |
| bldg3339-fl2-a1.pdf | ||
| STATEMENT_OF_WORK_(REV_-_1).pdf | ||
| third-party_infrastructure_installs_br_20130131.pdf | ||
| bldg3339-fl2-b1.pdf | ||
| DoD_UFC_RCDD.pdf | ||
| Amendment_0003_-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf | ||
| Amendment_0002_-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf | ||
| bldg3339-fl2-2b.pdf | ||
| Amendment_0001_-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf | ||
| bldg3339-fl2-2a.pdf | ||
| NET-018_SOW_20141104(revised).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
1. CONTRACTOR ID CODE
J
PAGE
OF
PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
25 NOV 2014
4. REQUISITION/PURCHASE REQ. NO.
6. ISSUED BY:
SOUTHWEST REGIONAL MAINTENANCE
CENTER
CODE
N55236
7. ADMINISTERED BY (If other than Item 6)
CODE 410
3755 BRINSER STREET STE 1
SAN DIEGO, CA 92136
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, State, & Zip Code)
X
9A. AMENDMENT OF SOLICITATION NO.
RFQ N55236-15-Q-0018
9B. DATED (SEE ITEM 11)
07 NOV 2014
10A. MODIFICATION OF CONTRACT/ ORDER
NO.
10B. DATED (SEE ITEM 13)
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers is changed, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF
YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation & this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS,
IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT / ORDER NO. IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc?) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is, is not required to sign this document and return ___ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT / MODIFICATION (Organized by UFC section headings, including solicitation/contract subject matter where feasible.)
ACCOMPLISH NET-018 LAYER 1 CABLING FOR BLDG 3339/2ND FLOOR.
1. The subject solicitation has been amended as follows:
a) Replaced the original statement of work (SOW) with SOW, (Rev. (1)).
b) Incorporate the following five (5) attachments to this solicitation: bldg3339-fl2-a1 and bldg3339-fl2-b1 drawings (1 page EA);
DoD_UFC_RCDD (46 pages double sided - 34&46 blank) & Third-party_infrastructure_installs_br_20130131 (5 pages).
2. See continuation page.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or Print)
15B. CONTRACTOR / OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
BY ________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
PREVIOUS EDITIONS USABLE
30-105-01 STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
SECTION SF 30 BLOCK 14 RFQ N55236-15-Q-0018
CONTINUATION PAGE Page 2 of 2
SUMMARY OF CHANGES
2. Requests for specification clarification:
1. Question: Correction to Question one (1), Amendment 0003: Solicitation specifications cites: Install a total of ninety-three (101) dual
CAT6 cables to the twenty-two (22) rooms. Is it ninety-three or (99) drops for a total cable count of 186 or 198?
Answer: One-hundred-one (101) drops in twenty-five (25) rooms.
2. Question: Install, (1) 12 strand MM (62.5 micron) fiber optic cable within inner duct from room 222 to room 200. Cable to be terminated in cabinet/rack-mounted patch panels using TIA/EIA type SC-SC connector. Cable to be terminated in the rear of a fiber patch panel located in room 200 using TIA/EIA type SC-SC connector and in the IDF room.
Answer: Terminate test and label new fiber cable.
3. Question: Will you require any specific patch panels for the Cat6 IDF terminations?
Answer: No.
4. Question: Cat 6 network cables to be terminated in a patch panel in the network cabinet located in the IDF room. Install four (4) Cat 6, 48-port patches panels, and one (1) Cat6, 24-port patch panel for a total of two-hundred sixteen (216) ports to be located in the network cabinet of the IDF room.
Answer: One-hundred-one (101) drops in twenty-five (25) rooms.
5. Question: Responses to question posed at the Job walk for the subject re-wire project revealed (Quest. #3) that vendors are to provide the fiber patch panel to be installed into the new cabinet. Please indicate the number of panels desired within the patch panel to be provided.
Answer: Vendors are not required to provide a patch panel. We already have a fiber patch panel in room 200, which the fiber will terminate in the rear of the fiber patch panel. The fiber will be terminated with an SC connector in the IDF room.
6. Question: Is the priority having a cabinet with 42" in depth?
Answer: No, it’s not a priority.
7. Question: Are we able to provide alternate cabinets that are 30 to 36 inches in depth?
Answer: Yes.
8. Question: We are having difficulty finding a 48"High wall mounted cabinet that is 42" in depth. Did you have a particular cabinet with those dimensions in mind?
Answer: No, I do not have a specific brand/model.