Amendment_0003_-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf

PDF 134 KB Posted

Attached to
ACCOMPLISH NET-018 LAYER 1 CABLING FOR BLDG 3339/2ND FLOOR Federal contract opportunity
Solicitation number
N55236-15-Q-0018
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Amendment 0003 to answer questions asked via e-mail on 14 NOV 2014.

View the file

Other files for this federal contract opportunity

Other files attached to ACCOMPLISH NET-018 LAYER 1 CABLING FOR BLDG 3339/2ND FLOOR, newest first.
File Type Posted
Amendment_0005-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf PDF
Attachment_Dept_of_Labor_Wage_Det._05-2057_Rev_15.htm HTM file
STATEMENT_OF_WORK_(REV_-_1).pdf PDF
third-party_infrastructure_installs_br_20130131.pdf PDF
Amendment_0004-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf PDF
bldg3339-fl2-b1.pdf PDF
DoD_UFC_RCDD.pdf PDF
bldg3339-fl2-a1.pdf PDF
Amendment_0002_-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf PDF
bldg3339-fl2-2a.pdf PDF
bldg3339-fl2-2b.pdf PDF
Amendment_0001_-_N55236-15-Q-0018_RE-CABLING_PROJECT.pdf PDF
NET-018_SOW_20141104(revised).pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

1. CONTRACTOR ID CODE

J

PAGE

OF

PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

18 NOV 2014

4. REQUISITION/PURCHASE REQ. NO.

6. ISSUED BY:

SOUTHWEST REGIONAL MAINTENANCE

CENTER

CODE

N55236

7. ADMINISTERED BY (If other than Item 6)

CODE 410

3755 BRINSER STREET STE 1

SAN DIEGO, CA 92136

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, State, & Zip Code)

X

9A. AMENDMENT OF SOLICITATION NO.

RFQ N55236-15-Q-0018

9B. DATED (SEE ITEM 11)

07 NOV 2014

10A. MODIFICATION OF CONTRACT/ ORDER

NO.

10B. DATED (SEE ITEM 13)

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers is changed, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF

YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation & this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS,

IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT / ORDER NO. IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc?) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is, is not required to sign this document and return __1_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT / MODIFICATION (Organized by UFC section headings, including solicitation/contract subject matter where feasible.)

ACCOMPLISH NET-018 LAYER 1 CABLING FOR BLDG 3339/2

ND

FLOOR.

1. Requests for specification clarification:

See continuation page(s)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or Print)

15B. CONTRACTOR / OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B. UNITED STATES OF AMERICA

BY ________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

PREVIOUS EDITIONS USABLE

30-105-01 STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

SECTION SF 30 BLOCK 14 RFQ N55236-15-Q-0018

CONTINUATION PAGE Page 2 of 2

SUMMARY OF CHANGES

1. Requests for specification clarification:

1. Question: Solicitation specifications cite install a total of ninety-three (99) dual CAT6 cables to the twenty-two

(22) rooms. Is it ninety-three or (99) drops for a total cable count of 186 or 198?

Answer: 99 drops for a total of 198 cables.

2. Question: Are drawings available?

Answer: Yes, they were provided with Amendment 0001 to this solicitation.

3. Question: Solicitation cite that fiber optic distribution cable must be terminated in cabinet/rack-mounted patch panels using TIA/EIA type LC connector. Will we be installing a new patch panel in the new cabinet?

Answer: Yes.

4. Question: Outlet boxes will be approximately 4-inch (102 mm) square by 2-1/inch (57 mm) deep boxes and include two blanks position for future applications. Are these surfaces mounts boxes?

Answer: It appears that they are because of the raceway. Yes, they are surface mount.

5. Question: Install a new pathway for all cables installed where applicable. What is the existing cable routing i.e. cable tray, J-hooks, etc.?

Answer: There is cable tray available after the old cable is removed.

6. Question: Terminate cables from workstations to installed wall ports. Would these be separate jumpers?

Answer: Separate jumpers.

7. Question: Provide labor and equipment to remove existing, unused cable in the ceiling infrastructure.

Approximately how many cables and average length?

Answer: Undetermined, will let vendors examine at the site visit walkthrough.

8. (a) Question: Remove all unused cable as identified by SWRMC IT Division. In the table that follows this paragraph, are the cables listed the new ones to be installed or the old ones to be removed?

Answer: New ones to be installed.

(b) Question: Or will SWRMC IT Division provide a separate list of cables to be removed?

Answer: Unable to provide a separate list of cables to be removed, since they are not connected to a patch panel or wall outlet.

9. Question: Do you want blue and white jacks to correspond to the cables?

Answer: Yes, would like color coordination.

10. Question: Will you require any specific patch panels for the Cat6 IDF terminations?

Answer: No.