This solicitation seeks proposals for maintenance, repair, and preservation work on two deep draft utility floats homeported at Puget Sound Naval Shipyard. The selected contractor will be responsible for tasks including docking and cleaning the vessels, blasting and preserving hull surfaces, inspecting tanks and voids, installing non-skid deck coating and fender repairs. The period of performance is from September 2nd, 2020 through November 5th, 2020. The government anticipates awarding a firm-fixed price contract on a lowest price technically acceptable basis to a small business in July 2020. Offerors must be registered in the System for Award Management and have ship repair facilities located in the Puget Sound area to be eligible for consideration.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR CLARIFICATION
ATTACHMENT J-3
DATE OF REQUEST:
REQUIREMENT: UFDD 29 & 54
ITEM NO:
TITLE:
PARA. NO: PAGE NO:
PLANNER’S NAME: ATTACH. NO:
QUESTION NO:
SOLICITATION NO.: N4523A20R1059
ISSUING OFFICE POC: Brian Fergus
PHONE: (360) 476-4071
EMAIL: brian.fergus@navy.mil
CONTRACTOR:
CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION:
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Yes DWG/REF CHG. No RQMTS CHG: No MAT'L CHG: No TECHNICAL REVIEW:Lockwood SERIAL NO:001
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO
LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.
Can the Government clarify if the intent is to power tool clean and accomplish total Quantity (150 SQ FT) per vessel?
Or is the intent to power tool clean and accomplish 150 SQ FT per tank/void, per vessel?
3.4.5 Tank/Void Touch Up Preservation
3.4.5.2 27 J-1
SOW States: Power tool clean and accomplish total Quantity (150 SQ FT) in each vessel in locations listed in TABLE 2 using the report of 3.4.2 for guidance
In paragraph 3.4.5.2 remove the following: "Power tool clean and accomplish total Quantity (150 SQ FT) in each vessel in locations listed in TABLE 2 using the report of 3.4.2 for guidance." and add the following, "Power tool clean and accomplish total Quantity (150 SQ FT) per vessel. The total Quantity (150 SQ FT) shall be divided between the locations listed in TABLE 2 using the report of
3.4.2 for guidance.”