C09.1 - Solicitation Amendment 0002 N4523A20R1059 UFDDs 29 & 54.pdf

PDF 379 KB Posted

Attached to
UFDD-29 and UFDD-54: Maintenance, Repair, and Preservation
Solicitation number
N4523A20R1059
Issued by

About this file

This document summarizes a federal solicitation for maintenance, repair, and preservation services for two deep draft utility floats homeported at Puget Sound Naval Shipyard. The solicitation was issued by the Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility and seeks a firm-fixed-price contract for services including cleaning, blasting, preserving, and testing the hulls and tanks of the floats; replacing zinc anodes and non-skid deck coating; installing new fender rubber; and transporting the floats to and from the contractor's Puget Sound-area facility. Interested contractors must be small businesses under NAICS code 336611 and registered in the System for Award Management by May 15, 2020 to receive drawings and references. The period of performance is September 2 to November 5, 2020. Award is anticipated in July 2020 on a lowest-price technically acceptable basis.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

UFDD 29 & 54

A. PURPOSE: The purpose of this second amendment to solicitation N4523A20R1059 is to publish Errata 1 of the Statement of Work (SOW).

B. CHANGE: Paragraph 3.4.5.2 has been changed.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4523A20R1059

X 9B. DATED (SEE ITEM 11)

22-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-May-2020

CODE

N4523A PSNS&IMF

C440

COMMAND SERVICES CONTRACTING SUPPORT

1400 FARRAGUT AVE

BREMERTON WA 98314-2026

N4523A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4523A20R1059

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

SECTION J

Any contract awarded as a result of this solicitation shall consist of the following sections of this solicitation, and the documents, exhibits, and attachments described below:

Part I The Schedule (Sections A through H) Part II Contract Clauses (Section I) Part III List of Documents, Exhibits, and other Attachments (Section J) Part IV Representations and Instructions (Sections K through M)

Part IV of the solicitation will not be physically incorporated into the resulting contract. However, Section K, “Representations, Certifications and Other Statements of Offerors” will be retained in the contract file and acceptance of a proposal under this solicitation incorporates Section K by reference into the resultant contract (FAR 15.204-1(b)).

The following is a list of attachments to the RFP. Attachments J-1, J-2a, J-2b,and Exhibit A will be incorporated into the contract along with all references listed in section two (2) of the Statement of Work (SOW), digital copies of which are available upon contractor request. Attachments J-3, J-4, J-6, and J-7 are included for the purposes of the solicitation, but will not be incorporated into the resulting contract. Additionally, the contractor shall be responsible for the latest revisions of all references, specifications, and standards in effect at time of proposal closing.

Number Title Number of Pages Dated

Attachment J-1 UFDD 29 & 54 Statement of Work (SOW)

Errata 1

20APR2020

12May2020

Attachment J-2a UFDD 29 5-Way Breakout 1 N/A

Attachment J-2b UFDD 54 5-Way Breakout 1 N/A

Attachment J-3 Request For Clarification Form 1 N/A Attachment J-4 BAVR Instructions 1 N/A Attachment J-5 References / Drawings 11 PDF Files N/A Attachment J-6 Contract Performance Data Sheet 2 N/A Attachment J-7 Corporate Experience Data Sheet 6 N/A

Exhibit A CDRLs and DIDs 40 PDF Files N/A

NOTE 1:

"Attachment” means any documentation, appended to a contract or incorporated by reference, which does not establish a requirement for deliverables.

"Exhibit” means a document, referred to in a contract, which is attached and establishes requirements for deliverables.

N4523A20R1059

(End of Summary of Changes)

File details come from the government source that posted it. Updated .