This document contains a federal contract solicitation and related opportunity for maintenance, repair, and preservation services for two deep draft utility floats homeported at Puget Sound Naval Shipyard. The solicitation seeks a firm-fixed-price contract to be awarded in July 2020 for services to be completed between September and November 2020. Key work includes docking, cleaning, blasting, preserving, and testing the hull and undercarriage structures; tank/void cleaning, preservation, and air testing; non-skid deck coating; and fender maintenance. The solicitation anticipates a competitive small business set-aside under NAICS code 336611 for ship repair facilities located in the Puget Sound area. Interested contractors must be registered in the System for Award Management and request technical drawings by mid-May.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UFDD 29
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | UFDD 29 | ||||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0 | $0 | $0 | $0 | $0 | |||||
| 1.5 | Required Documents | $0 | $0 | $0 | $0 | $0 | |||||
| 1.6 | Progress Meetings | $0 | $0 | $0 | $0 | $0 | |||||
| 1.7 | Availability Requirements | $0 | $0 | $0 | $0 | $0 | |||||
| 1.7.1 | Transport Vessel | $0 | $0 | $0 | $0 | $0 | |||||
| 1.7.2 | Office Space | $0 | $0 | $0 | $0 | $0 | |||||
| 1.8 | Care of Vessel | $0 | $0 | $0 | $0 | $0 | |||||
| 1.11 | CFR | $0 | $0 | $0 | $0 | $0 | |||||
| 1.16.1 | Maintain Preservation OQE Records | $0 | $0 | $0 | $0 | $0 | |||||
| 1.17 | Environmental/Hazwaste Managemment | $0 | $0 | $0 | $0 | $0 | |||||
| 1.21 | Gas Free | $0 | $0 | $0 | $0 | $0 | |||||
| 1.22 | General Requirements for Testing | $0 | $0 | $0 | $0 | $0 | |||||
| 3.1.2 | Docking Procedure | $0 | $0 | $0 | $0 | $0 | |||||
| 3.1.3 | Blocking Plan | $0 | $0 | $0 | $0 | $0 | |||||
| 3.1.7 | Dock the Vessel | $0 | $0 | $0 | $0 | $0 | |||||
| 3.1.8 | Post Docking | $0 | $0 | $0 | $0 | $0 | |||||
| 3.1.9 | Undock the Vessel | $0 | $0 | $0 | $0 | $0 | |||||
| 3.1.10 | Shift the Vessel | $0 | $0 | $0 | $0 | $0 | |||||
| 3.1.12 | Final Docking Report | $0 | $0 | $0 | $0 | $0 | |||||
| 3.2.1 | I.D.Distinguishing Figures and Markings | $0 | $0 | $0 | $0 | $0 | |||||
| 3.2.2 | Rubber fenders | $0 | $0 | $0 | $0 | $0 | |||||
| 3.2.3 | Zinc Anodes | $0 | $0 | $0 | $0 | $0 | |||||
| 3.2.4 | Hull and Undercarriage Preservation | $0 | $0 | $0 | $0 | $0 | |||||
| 3.2.5 | Hull and Freeboard Visual inspection | $0 | $0 | $0 | $0 | $0 | |||||
| 3.2.6 | Hull and Freeboard UT Inspection 200 sites | $0 | $0 | $0 | $0 | $0 | |||||
| 3.2.7 | UT Inspection Accomplish 25 sites as designated | $0 | $0 | $0 | $0 | $0 | |||||
| 3.4.1 | Open, Pump, Ventilate, Gas Free Tanks | $0 | $0 | $0 | $0 | $0 | |||||
| 3.4.2 | Tank Void Visual Inspection | $0 | $0 | $0 | $0 | $0 | |||||
| 3.4.3 | Identify Color Schemes and Markings | $0 | $0 | $0 | $0 | $0 | |||||
| 3.4.4 | Preliminary Air test | $0 | $0 | $0 | $0 | $0 | |||||
| 3.4.5 | Tank Void Touch Up Preservation | $0 | $0 | $0 | $0 | $0 | |||||
| 3.4.6 | Blast and Preserve Void Access Covers | $0 | $0 | $0 | $0 | $0 | |||||
| 3.4.7 | Final Air test | $0 | $0 | $0 | $0 | $0 | |||||
| 3.4.8 | Void Close Out | $0 | $0 | $0 | $0 | $0 | |||||
| 3.5.1 | Main Deck Non Skid Repair | $0 | $0 | $0 | $0 | $0 | |||||
| 3.5.2 | Visual Inspection for Structural Defects | $0 | $0 | $0 | $0 | $0 | |||||
| 3.5.3 | Ultrasonic Test (UT) Inspection 60 sites | $0 | $0 | $0 | $0 | $0 | |||||
| 3.5.4 | UT Accomplish 20 Sites as Designated | $0 | $0 | $0 | $0 | $0 | |||||
| 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | ||
| Labor Rate | G&A Rate | Profit Rate | |||||||||
| Total Bid: | $0.00 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the proposed Labor, G&A, and Profit rates.