RFC_006_28DEC2018_YP-701.pdf

PDF 42 KB Posted

Attached to
Maintenance, Preservation, and Repair of the YP-701
Solicitation number
N4523A19R1067
Issued by

View the file

Other files

File Type Posted
Attachment_J-2_Price_Proposal_Worksheet_REV.2.xls XLS spreadsheet
N4523A19R10670003__Amendment_3_27DEC2018.pdf PDF
Answers_to_RFCs_0003_through_0005.pdf PDF
RFC_001.pdf PDF
Attachment_J-8_Pictures_4of6.zip ZIP file
Attachment_J-8_Pictures_1of6.zip ZIP file
Attachment_J-8_Pictures_5of6.zip ZIP file
RFC_002.pdf PDF
N4523A19R10670002_Amendment_2.pdf PDF
Attachment_J-8_Pictures_6of6.zip ZIP file
Attachment_J-8_Pictures_3of6.zip ZIP file
Attachment_J-2_Price_Proposal_Worksheet_REV.1.xls XLS spreadsheet
Attachment_J-9_FBO_upload_Guide.pdf PDF
Attachment_J-8_Pictures_2of6.zip ZIP file
N4523A19R1067_Amendment_P0001.pdf PDF
5_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
Attachment_J-5_Corporate_Experience_Data_Sheet.docx DOCX document
Attachment_J-3_Request_for_Clarification_(RFC)_Form.docx DOCX document
1_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
Solicitation_N4523A19R1067_YP-701.pdf PDF
Attachment_J-7_BAVR_Instructions.pdf PDF
Attachment_J-4_Contract_Performance_Data_Sheet.docx DOCX document
Attachment_J-2_YP-701_5-_way_break_out.xlsx XLSX spreadsheet
3_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
2_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
Attachment_J-1_SOW_YP-701.pdf PDF
4_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
SOW_YP-701_DRAFT.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST: 12/28/2018 QUESTION NO: 006

REQUIREMENT: Pitch and track propellors REQUISITION NO.: N4523A19R1067

ITEM NO:

TITLE: Availability Requirements

ISSUING OFFICE POC (CODE 440.22):

Brittany Chartier: (360) 476-5708 Brittany.chartier@navy.mil

PARA. NO: 3.7.4.1.1 PAGE NO: 46 CONTRACTOR:

PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION:

Contractor will not be able to price the restoration of the pitch and tracking of the propellers until it is identified how far out they are. Contractor recommends changing the verbiage to require the testing and report findings only. Restoration would be a change order based on test results.

DO NOT WRITE BELOW THIS LINE

SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N

TECHNICAL REVIEW: BESAW SERIAL NO:

Refer to the requirements of paragraph 3.7.4.1 and 3.7.4.1.2 of the Statement of Work.

Refer to section 1.11 Condition Found/ Inspection Discrepancy Report(s) of the Statement of Work.

Note* New propellers were installed and balanced in August 2018- The underway check of the props tested SAT.

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO

LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.