Attachment J-2 Price Proposal Worksheet REV 2 in response to RFC 005.

View the file

Other files

File Type Posted
RFC_006_28DEC2018_YP-701.pdf PDF
N4523A19R10670003__Amendment_3_27DEC2018.pdf PDF
Answers_to_RFCs_0003_through_0005.pdf PDF
RFC_001.pdf PDF
Attachment_J-8_Pictures_4of6.zip ZIP file
Attachment_J-8_Pictures_1of6.zip ZIP file
Attachment_J-8_Pictures_5of6.zip ZIP file
RFC_002.pdf PDF
N4523A19R10670002_Amendment_2.pdf PDF
Attachment_J-8_Pictures_6of6.zip ZIP file
Attachment_J-8_Pictures_3of6.zip ZIP file
Attachment_J-2_Price_Proposal_Worksheet_REV.1.xls XLS spreadsheet
Attachment_J-9_FBO_upload_Guide.pdf PDF
Attachment_J-8_Pictures_2of6.zip ZIP file
N4523A19R1067_Amendment_P0001.pdf PDF
5_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
Attachment_J-5_Corporate_Experience_Data_Sheet.docx DOCX document
Attachment_J-3_Request_for_Clarification_(RFC)_Form.docx DOCX document
1_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
Solicitation_N4523A19R1067_YP-701.pdf PDF
Attachment_J-7_BAVR_Instructions.pdf PDF
Attachment_J-4_Contract_Performance_Data_Sheet.docx DOCX document
Attachment_J-2_YP-701_5-_way_break_out.xlsx XLSX spreadsheet
3_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
2_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
Attachment_J-1_SOW_YP-701.pdf PDF
4_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
SOW_YP-701_DRAFT.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YT-701

INSERT CONTRACTOR/COMPANY NAME HERE
Project =YT-701DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALLabor CostMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessel$0.00$0.00$0.00$0.00$0.00
1.7.2Provide Office Space$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11CFR Reports$0.00$0.00$0.00$0.00$0.00
1.16Preservation OQE$0.00$0.00$0.00$0.00$0.00
1.17Enviroment and Hazardous Waste Management$0.00$0.00$0.00$0.00$0.00
1.21Gas Free$0.00$0.00$0.00$0.00$0.00
1.22.1Develop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00
3.1Docking/Undocking$0.00$0.00$0.00$0.00$0.00
3.1.1Personnel & Equipment$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedure$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.4Crib and Brace Blocking$0.00$0.00$0.00$0.00$0.00
3.1.5Setting & Aligning Blocks$0.00$0.00$0.00$0.00$0.00
3.1.6Stability Calculations$0.00$0.00$0.00$0.00$0.00
3.1.7Docking Conference$0.00$0.00$0.00$0.00$0.00
3.1.8Dock the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.9Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.10Shifting the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.11Undock Vessel$0.00$0.00$0.00$0.00$0.00
3.1.13Final Docking Report$0.00$0.00$0.00$0.00$0.00
3.2.1Identify Distinguishing Figures & Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.2.5Hull & Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.6Hull Planking Repairs$0.00$0.00$0.00$0.00$0.00
3.2.7Sheer Guard Removal$0.00$0.00$0.00$0.00$0.00
3.4.1Marine sanitation device PCP$0.00$0.00$0.00$0.00$0.00
3.4.2Open, Pump, Clean, Vent, Gas Free, Close all tanks$0.00$0.00$0.00$0.00$0.00
3.4.3Visual Inspections$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Tests$0.00$0.00$0.00$0.00$0.00
3.4.5Clean & Flush Potable Water System$0.00$0.00$0.00$0.00$0.00
3.4.6Certify Potable Water System$0.00$0.00$0.00$0.00$0.00
3.4.7Final Air Test$0.00$0.00$0.00$0.00$0.00
3.4.8Start Up Procedure for MSD System$0.00$0.00$0.00$0.00$0.00
3.4.9Tank Closeout Inspection$0.00$0.00$0.00$0.00$0.00
3.4.10Tank Access Covers$0.00$0.00$0.00$0.00$0.00
3.4.11On Load Fuel$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-Skid Repairs$0.00$0.00$0.00$0.00$0.00
3.5.2Visual inspection Main Deck$0.00$0.00$0.00$0.00$0.00
3.6.1Deckhouse Non-Skid Repairs$0.00$0.00$0.00$0.00$0.00
3.6.2Pilot House Non-Skid Repair$0.00$0.00$0.00$0.00$0.00
3.6.3Deck House Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.6.4Pilot HouseBlasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.6.5Curtain Plate Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.6.6Mast Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.7.1Shaft Coupling Alignment$0.00$0.00$0.00$0.00$0.00
3.7.2Removal of Propellers, Shafts, Couplings, Bearings$0.00$0.00$0.00$0.00$0.00
3.7.3Inspections for Wear & Defects$0.00$0.00$0.00$0.00$0.00
3.7.4Propulsion Repairs$0.00$0.00$0.00$0.00$0.00
3.7.5Propulsion Re-assembly$0.00$0.00$0.00$0.00$0.00
3.7.6System Operational Test$0.00$0.00$0.00$0.00$0.00
3.8.1Rudder Swing Test$0.00$0.00$0.00$0.00$0.00
3.8.2Steering Removals$0.00$0.00$0.00$0.00$0.00
3.8.3Steering SystemsRe-assembly$0.00$0.00$0.00$0.00$0.00
3.8.4Rudder Swing Test Final$0.00$0.00$0.00$0.00$0.00
3.9.1Hydraulic Power System and Component Operational Testing$0.00$0.00$0.00$0.00$0.00
3.9.2Diesel Engine/Generator System and Component Operational Testing$0.00$0.00$0.00$0.00$0.00
3.10.1Electrical Systems/Components Operational Testing$0.00$0.00$0.00$0.00$0.00
3.10.2Lighting Systems/Components Operational Testing$0.00$0.00$0.00$0.00$0.00
3.11.1Rinse and Flush Potable Water Piping$0.00$0.00$0.00$0.00$0.00
3.11.2Potable Water Piping Tightness Test$0.00$0.00$0.00$0.00$0.00
3.13Dock and Sea Trials$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A Rate:Profit Rate:
Total Bid:$0.00

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

File details come from the government source that posted it.