Attachment_J-2_YP-701_5-_way_break_out.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Maintenance, Preservation, and Repair of the YP-701
Solicitation number
N4523A19R1067
Issued by

About this file

Attachment J-2 YP-701 5 way break out

View the file

Other files

File Type Posted
RFC_006_28DEC2018_YP-701.pdf PDF
Attachment_J-2_Price_Proposal_Worksheet_REV.2.xls XLS spreadsheet
N4523A19R10670003__Amendment_3_27DEC2018.pdf PDF
Answers_to_RFCs_0003_through_0005.pdf PDF
RFC_001.pdf PDF
Attachment_J-8_Pictures_4of6.zip ZIP file
Attachment_J-8_Pictures_1of6.zip ZIP file
Attachment_J-8_Pictures_5of6.zip ZIP file
RFC_002.pdf PDF
N4523A19R10670002_Amendment_2.pdf PDF
Attachment_J-8_Pictures_6of6.zip ZIP file
Attachment_J-8_Pictures_3of6.zip ZIP file
Attachment_J-2_Price_Proposal_Worksheet_REV.1.xls XLS spreadsheet
Attachment_J-9_FBO_upload_Guide.pdf PDF
Attachment_J-8_Pictures_2of6.zip ZIP file
N4523A19R1067_Amendment_P0001.pdf PDF
5_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
Attachment_J-5_Corporate_Experience_Data_Sheet.docx DOCX document
Attachment_J-3_Request_for_Clarification_(RFC)_Form.docx DOCX document
1_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
Solicitation_N4523A19R1067_YP-701.pdf PDF
Attachment_J-7_BAVR_Instructions.pdf PDF
Attachment_J-4_Contract_Performance_Data_Sheet.docx DOCX document
3_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
2_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
Attachment_J-1_SOW_YP-701.pdf PDF
4_of_5_Attachment_J-6_References_YP-701_N4523A19R1067.zip ZIP file
SOW_YP-701_DRAFT.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

vessel name

INSERT CONTRACTOR/COMPANY NAME HERE
Project =YT-800DATE: =
PRIMESUBCONTRACTORPRIME
Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&APRIME

Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate

PARAGRAPH No.TITLEM/HMATERIAL PRICETOTAL
Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material PriceLabor CostMaterial CostTOTAL

Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F) Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)

1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11Condition Found Reports$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00
1.14Hot Work / Welding$0.00$0.00$0.00$0.00$0.00
1.15Threaded Fasteners$0.00$0.00$0.00$0.00$0.00
1.17Environmental & Hazardous Waste Management$0.00$0.00$0.00$0.00$0.00
1.18Materials$0.00$0.00$0.00$0.00$0.00
1.19Weight Control$0.00$0.00$0.00$0.00$0.00
1.20Label Plates$0.00$0.00$0.00$0.00$0.00
1.21Gas Free$0.00$0.00$0.00$0.00$0.00
1.22General Requirements for Testing$0.00$0.00$0.00$0.00$0.00
1.23Process Control Procedure (PCP) Requirements$0.00$0.00$0.00$0.00$0.00
3.1Docking/ Undocking$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedure$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.4Crib & Brace Blocking$0.00$0.00$0.00$0.00$0.00
3.1.5Setting & Alignment of Blocks$0.00$0.00$0.00$0.00$0.00
3.1.6Stability Calculations$0.00$0.00$0.00$0.00$0.00
3.1.7Docking Conference$0.00$0.00$0.00$0.00$0.00
3.1.8Docking the vessel$0.00$0.00$0.00$0.00$0.00
3.1.9Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.10Shifting the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.11Undock Vessel$0.00$0.00$0.00$0.00$0.00
3.1.13Final Docking Report$0.00$0.00$0.00$0.00$0.00
3.2.1Identify Distinguishing Figures & Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.2.5Hull and Freeboard Inspection$0.00$0.00$0.00$0.00$0.00
3.2.6Hull Planking Repairs$0.00$0.00$0.00$0.00$0.00
3.4.1Marine Sanitation Device PCP$0.00$0.00$0.00$0.00$0.00
3.4.2Tanks, Open, Clean, ventilate, and Gas Free$0.00$0.00$0.00$0.00$0.00
3.4.3Tanks & Voids visual inspection$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00
3.4.5Clean, Disinfect, Flush Potable water tank$0.00$0.00$0.00$0.00$0.00
3.4.6Certify Potable Water tank & piping$0.00$0.00$0.00$0.00$0.00
3.4.7Final Air Test$0.00$0.00$0.00$0.00$0.00
3.4.8MSD Start-Up Procedure$0.00$0.00$0.00$0.00$0.00
3.4.9Tank Close-Out Inspection$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-skid repair$0.00$0.00$0.00$0.00$0.00
3.5.2Visual Inspection Main Deck$0.00$0.00$0.00$0.00$0.00
3.6.1Deck House Non-Skid repair$0.00$0.00$0.00$0.00$0.00
3.6.2Pilot House Non-Skid repair$0.00$0.00$0.00$0.00$0.00
3.6.3Deck House Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.6.4Pilot House Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.6.5Curtain Plate Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.6.6Mast Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.7.1Shaft Coupling Alignment$0.00$0.00$0.00$0.00$0.00
3.7.2Removal of Propellers, Shafts, Coupling, Bearings$0.00$0.00$0.00$0.00$0.00
3.7.3Inspections; Wear and Defects$0.00$0.00$0.00$0.00$0.00
3.7.4Propulsion Repairs$0.00$0.00$0.00$0.00$0.00
3.7.5Propulsion Reassembly$0.00$0.00$0.00$0.00$0.00
3.8.1Rudder Swing Test$0.00$0.00$0.00$0.00$0.00
3.8.2Steering Removals$0.00$0.00$0.00$0.00$0.00
3.8.3Steering Systems Reassembly$0.00$0.00$0.00$0.00$0.00
3.8.4Rudder Swing Test Final$0.00$0.00$0.00$0.00$0.00
3.9.1Hydraulic Power Systems/Components Op. Test$0.00$0.00$0.00$0.00$0.00
3.9.2Diesel Engines/Generators Systems/Components Op. Test$0.00$0.00$0.00$0.00$0.00
3.10.1Electrical Systems/Components Operational Testing$0.00$0.00$0.00$0.00$0.00
3.10.2Lighting Systems/Components Operational Testing$0.00$0.00$0.00$0.00$0.00
3.13Dock and Sea Trials$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A Rate:Profit Rate:$0.00
Total Work Package

Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material Price Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material Price Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)

Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)

Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) ********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract to include Reservation Tasking.

File details come from the government source that posted it.