RFC2_Response.doc

DOC document 38 KB Posted

Attached to
SV64 Engine Overhaul and Life Cycle Maintenance
Solicitation number
N4523A18Q1055
Issued by

About this file

Request for Clarification #2 Response.

View the file

Other files

File Type Posted
RFC4_Response.doc DOC document
RFC3_Response.doc DOC document
SOW_References_30-50.zipx ZIPX file
N4523A18Q1055_SV64_Engine_Overhaul_and_LCM_-_Amendment_0002.pdf PDF
SOW_References_21-28_52-54_57_58.zipx ZIPX file
Attachment_J-1_SOW_SV64_Engine_Overhaul_and_LCM_dated_9AUG2018.docx DOCX document
SOW_Enclosures.zip ZIP file
RFC1_Response.doc DOC document
SWFPAC_SV64_Engine_Overhaul_and_LCM_-_Plain_Language_6AUG2018.docx DOCX document
SOW_References_55_and_56.zipx ZIPX file
N4523A18Q1055_SV64_Engine_Overhaul_and_LCM_-_Amendment_0001.pdf PDF
Attachment_J-1_SOW_SV64_Engine_Overhaul_and_LCM_dated_26JULY2018.docx DOCX document
Attachment_J-9_Wage_Determination_(Island_and_San_Juan_County)_17JULY2018.pdf PDF
Attachment_J-14_Wage_Determination_(Skagit_County)_17JULY2018.pdf PDF
Attachment_J-10_Wage_Determination_(King_and_Snohomish_County)_17JULY2018.pdf PDF
Attachment_J-3_Area_of_Consideration.pdf PDF
Attachment_J-12_Wage_Determination_(Grays_Harbor_and_Mason_County)_17JULY2018.pdf PDF
Attachment_J-1_SOW_SV64_Engine_Overhaul_and_LCM_dated_16JULY2018.docx DOCX document
Attachment_J-15_Wage_Determination_(Thurston_County)_17JULY2018.pdf PDF
N4523A18Q1055_SV64_Engine_Overhaul_and_LCM.pdf PDF
Attachment_J-6_Corporate_Experience_Data_Sheet.docx DOCX document
Attachment_J-2_GFP_Attachment.pdf PDF
Attachment_J-13_Wage_Determination_(Pierce_County)_17JULY2018.pdf PDF
Attachment_J-17_Pricing_Worksheet.xlsx XLSX spreadsheet
Attachment_J-4_Request_for_Clarification_Form.doc DOC document
Attachment_J-8_Wage_Determination_(Clallam_and_Jefferson_County)_17JULY2018.pdf PDF
Attachment_J-5_Contract_Performance_Data_Sheet.docx DOCX document
Attachment_J-11_Wage_Determination_(Kitsap_County)_17JULY2018.pdf PDF
Attachment_J-16_Wage_Determination_(Whatcom_County)_17JULY2018.pdf PDF
Attachment_J-7_BAVR_Instructions.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR CLARIFICATION

N4523A18Q1055 Attachment J-4

DATE OF REQUEST: 8/8/18
QUESTION NO: 002

REQUIREMENT: SV64 Engine Overhaul and LCM

REQUISITION NO.: N4523A18Q1055

ITEM NO: A.5

TITLE: Electrical Questions

PSNS&IMF CONTRACTS POC & PHONE:

See POCs listed on RFP.

PARA. NO:
PAGE NO:
CONTRACTOR:
PLANNER’S NAME:
ATTACH. NO:
CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)

A.5.1 Stated to Provide Service and Material to groom all electrical connections. During the ship check I noticed many cables that are secured with white nylon zipties, are zip ties acceptable or does everything need to be secured with Stainless Steel Banding and Rubber?

Also I noticed a number of RISE collars on the vessel. When grooming if cables are without a proper radius, and no slack can be found, are we supposed to replace cables? While grooming are we supposed to open the RISE collars?

A.5.2 States to Clean corrosion from ALL electrical connections and to No-Ox electrical connections. Is it the intent to disconnect every electrical connection throughout the boat and clean, then No-Ox and re-connect?

I noticed some of the large battery connections have silicone or 5200 sealer over the top of the connections, are we supposed to add new after removing or is this supposed to have a rubber boot?

Also noticed some butt-spliced fans, if we are to disconnect these connections your cable will continue to get shorter, marine practice would usually be to install a Plug that can be removed if fan needs replaced so the cable won’t need to be re-pulled, is this what you would like us to do?

Also, I was wondering to help determine how many electrical connections are on the vessel(s) if we could have access to the Electrical One-Line of these vessels?

DO NOT WRITE BELOW THIS LINE

SPEC CHG: N
DWG/REF CHG. N
RQMTS CHG: N
MAT'L CHG: N
TECHNICAL REVIEW:
SERIAL NO:

A.5.1 Wire Grooming: The Contractor will secure wiring throughout the vessel in accordance with the statement of work (SOW) and banding methods specified in references.

Cable Radius: The Contractor will report improper cable radius to the Government via Condition Found Report (CFR).

A.5.2

Cleaning and No-Ox Application: Continue with SOW. The Contractor will clean and apply No-Ox to all breaker panels, bus bars, electrical connections at the engine, generator, control panels, inside junction boxes etc. The Contractor will not disconnect deutsch style connectors, unless doing so facilitates the removal of the engine or marine gear. The Contractor will remove, clean, apply di-electric and re-install electric panel connections, breaker connections, bus bar connections, battery terminals, switches, Programmable Distribution Module (PDM) connections, etc.

Battery Terminals: The Contractor will not install battery terminal boots as the terminals have covers and silicon has been added to protect against corrosion.

Butt Splice Clean and Groom: The Contractor will not remove butt splices during clean/groom of the electrical system.

Electrical Drawings: REF 35, 36 and 47 are the closest information to a line drawing the Navy has for the electrical systems on this boat.