N4215821RS005-AMENDMENT 0004.pdf
PDF 377 KB Posted
- Attached to
- Barge and Small Boat Overhaul IDIQ Federal contract opportunity
- Solicitation number
- N4215821RS005
About this file
This amendment to a solicitation provides answers to questions from interested parties regarding Request for Proposal N4215821RS005 for an Indefinite Delivery, Indefinite Quantity contract for barge and small boat overhauls. The amendment maintains all original terms, and answers that the revised Statement of Work prompted a request for entirely new proposals from all offerors. Additionally, an Approved Master Ship Repair Agreement is required to demonstrate docking and production capabilities for overhaul task orders, and an Alternative Bid Review with Lot I and II facilities will not be considered acceptable in place of the Agreement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Past Performance Questionnaire - 5.2.22.docx | DOCX document | |
| Amendment 0008 - N4215821RS005.pdf | ||
| Exhibit A - Barge and Small Boats MAC IDIQ - CDRLs.pdf | ||
| N4215821RS005 - Amendment 0007.pdf | ||
| Amendment 0006 - N4215821RS005.pdf | ||
| Amendment 0005 - N4215821RS005.pdf | ||
| Attachment 1 - Past Performance Information Form.docx | DOCX document | |
| Attachment 3 - Revised Schedule of Work.xlsx | XLSX spreadsheet | |
| Attachment 2 - Past Performance Questionnaire.docx | DOCX document | |
| Amendment 0003 - N4215821RS005.pdf | ||
| N4215821RS005 - Amendment 0002.pdf | ||
| N4215821RS005 - Amendment 0001.docx | DOCX document | |
| Attachment 3 - Schedule of Work.xlsx | XLSX spreadsheet | |
| N4215821RS005 - RFP.pdf | ||
| Attachment 2 - Past Performance Questionnaire.docx | DOCX document | |
| Attachment 1 - Past Performance Information Form.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4215821BIDIQ21
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
I. Provide answ ers to questions from interested parties in reference to Solicitation N4215821RS005, Barge and Small Boats IDIQ.
II. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Apr-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4215821RS005
X 9B. DATED (SEE ITEM 11)
29-Sep-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Apr-2022
CODE
NORFOLK NAVAL SHIPYARD
ATTN: TIFFANY TAITANO
SUB PRESERVATION & SERVICES
C451, BLDG 65, 2ND FL, RM 201
PORTSMOUTH VA 23709-1022
N42158 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4215821RS005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
ANSWERS TO QUESTIONS
BARGE AND SMALL BOAT OVERHAUL IDIQ, RFP #N4215821RS005
QUESTIONS ANSWERS
Question #1: Answer to Question #1:
Could you please provide the Government’s preference for revised proposal submissions? Should contractors submit red-lined proposals for ease of reference to the Government in addition to “clean” versions of the revised proposals? Does the Government expect all volumes to be resubmitted or only volumes with revisions?
Additionally, would it be possible for the Government to provide a red-lined version of the changes to the RFP provided by Amendment 03?
The Government made necessary revisions to the Statement of Work (SOW). The revisions within the SOW prompted the Government to request new proposals from all offerors. All proposals shall be submitted in accordance with the solicitation.
Question #2: Answer to Question #2:
Paragraph 1.1.1 Page 16 states “Offer’s proposal shall include, current approved Master Ship Repair Agreement (MSRA) ensuring offers possess docking facilities, management, organization and production capabilities to perform Overhaul and repair task order packages.” Would the government consider an offeror with an ABR and the facilities and capability to conduct both Lot I and Lot II acceptable?
No. The Government will not consider an offeror with an ABR and the facilities and capability to conduct both Lot I and Lot II acceptable.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .