N42158-17-R-0001_Attachment_3_Production_Support_Direct_Rate_Spreadsheet.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- Production Support for Norfolk Naval Shipyard
- Solicitation number
- N42158-17-R-0001
About this file
This document contains a federal contract opportunity notice and related attachment for production support services at the Norfolk Naval Shipyard. The Naval Sea Systems Command seeks to award multiple indefinite-delivery, indefinite-quantity contracts for welding, pipefitting, shipfitting, blasting, painting, equipment repair and installation, sheet metal work, electrical and electronic repairs, pump and mechanical systems work, tank cleaning, rigging, and scaffolding. The base period of performance is one year beginning in November 2017, with four one-year option periods and a potential six-month extension. Task orders under $1 million will be set aside for small businesses, while larger orders will use full and open competition. The attached rate sheet template provides spaces for labor hours and rates by trade across the ordering periods but contains no input data.
Direct Labor Spreadsheet
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Direct Rate
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||||||
| Labor Hours | Loaded Rates | Labor Hours | Loaded Rates | Labor Hours | Loaded Rates | Labor Hours | Loaded Rates | Labor Hours | Loaded Rates | |||||||||||||||||
| Labor Categories | ST | OT | ST | OT | Total Cost | ST | OT | ST | OT | Total Cost | ST | OT | ST | OT | Total Cost | ST | OT | ST | OT | Total Cost | ST | OT | ST | OT | Total Cost | |
| Marine Electrician | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Marine Insulator / Lagger | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Marine Pipefitter | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Outside Marine Machinist | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Painter: Brush & Roll (Touch-up also) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Painter: SandBlaster (Touch-up also) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Painter: WaterJetter (Touch-up also) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Painter: Sprayer, Air (Touch-up also) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Painter: Sprayer, Airless (Touch-up also) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Painter: Sprayer, Plural Component | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Painter: Lead Paint Remover | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Rigger / Weight Handler | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Shipfitter | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Shipwright: Staging/Shrink-wrap | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Temporary Services Electrician | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Temporary Services Pipefitter | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Welder: Structural SMAW | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Welder: Structural GTAW | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Welder: Structural GMAW-Pulse | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Welder: Pipe GTAW CuNi | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Welder: Pipe GTAW Cres | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Welder: Pipe GTAW CS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Forklift Operator | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Forklift/Aerial Lift Operator | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Sheet Metal Mechanic Shop | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Sheet Metal Mechanic Marine | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||
| Program Manager | ||||||||||||||||||||||||||
| Project Manager | ||||||||||||||||||||||||||
| Site Foreman (1st Shift) | ||||||||||||||||||||||||||
| Site Foreman (2nd Shift) | ||||||||||||||||||||||||||
| Site Foreman (3rd Shift) | ||||||||||||||||||||||||||
| Total Labor | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Fixed Fee (Show Percentage in adjacent Column) | Percent | $0.00 | ||
| TOTAL CLIN 0001 | $0.00 | |||
| CLIN 1001 | $0.00 | |||
| CLIN 2001 | $0.00 | |||
| CLIN 3001 | $0.00 | |||
| CLIN 4001 | $0.00 |
| Base Percent | Option 1 Percent | Option 2 Percent | Option 3 Percent | Option 4 Percent | ||||||
| Overhead (If Applicable) (Show Percentage in adjacent Column) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| G&A (If Applicable) (Show Percentage in Adjacent Column) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Fringe (If Applicable) (Show Percentage in Adjacent Column) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Proposed Escalation Rate | Option 1 | Option 2 | Option 3 | Option 4 |
| Escalation Rate |
Subtotal, Cont. Site Hours & Cost
Sheet3
File details come from the government source that posted it. Updated .