0905_A_Rudder sternframexam CPP repair.doc

DOC document 36 KB Posted

Attached to
USNS SIOUX EMERGENCY DRYDOCK
Solicitation number
N40442-10-T-4027
Issued by

About this file

W/I 905

View the file

Other files

File Type Posted
SIOUX AMENDMENT 007.doc DOC document
J-08 Interport Differential.doc DOC document
0906_A_MainPropShafting and CPP repairs.doc DOC document
SIOUX MOD 6.doc DOC document
0907_A_Propeller Shaft Wear Down Readings.doc DOC document
MOD 0004 SIOUX.doc DOC document
MSC Chem Treatment Handbook.pdf PDF
4842949 - —
docking plan 4839510_REVH.pdf PDF
4842879 REV E.pdf PDF
0501 - MDS Modification —
0001_NSP_INTENT SCOPE GEN REQUIREMENTS DEFINITIONS.doc DOC document
0965-LP-122-1010 Lorain Public Address system.pdf PDF
SMS 2-1-004.pdf PDF
EPA SW-846.pdf PDF
0002_NSP_TECHNICAL REPRESENTATIVES.doc DOC document
A126.pdf PDF
B61.pdf PDF
NAVMED P-5010-6.pdf PDF
Uniform Hazwaste Manifest-sample.pdf PDF
MIL-T-16420.pdf PDF
6248358_- —
MSC SMS 2-1-004.pdf PDF
Autocad 7080803 Rev -9.pdf PDF
MIL-STD-1625C 1 .pdf PDF
NFPA 51B.pdf PDF
STDN-12MC-P-01.pdf PDF
Sioux MTA references.doc DOC document
6248358_- —
STDN-12MC-F-01.pdf PDF
ISO_9001_2000.pdf PDF
0904 - SEA VALVES AND OVBD DISCH VALVES.DOC DOC document
4839510 Docking Plan SIOUX 3 REV H.dwg DWG drawing
GTR.pdf PDF
4839510_H.pdf PDF
Uniform Hazwaste Manifest-sample2.pdf PDF
MIL-I-45208.pdf PDF
10 USC 7311.pdf PDF
845-4842714 REV F Trim and Stability Book.pdf PDF
MIL-C-28628D.pdf PDF
Navajo Installation Photos.ppt PPT presentation
Uniform Hazwaste Manifest-instructions.pdf PDF
NFPA 312.pdf PDF
4839510 Docking Plan 1 REVH.dwg DWG drawing
MIL-F-29248.pdf PDF
OPNAVINST 5090.1C.pdf PDF
RCRA.pdf PDF
COMSCINST 5530-3C-Chap1.pdf PDF
6248358_- —
D1784.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SIOUX

(T-ATF 171 )

DRYDOCKING

CONTRACT NO. N40442-10-R-XXXX

ITEM NO. 0905

CATEGORY "A"

7/27/2010 Rudder & CPP Stern Frame Examination / Repair

/Collins/GT

1.0

ABSTRACT

1.1 This item describes the requirement to inspect the rudders and stern frame area.

2.0 REFERENCES/ ENCLOSURES

2.1 MSC Standard Item No. 23, Rudder and Stern Frame Examination, revised 22 March 2010.

2.2 MSC Drawing, Rudder & Steering Assembly 4842963.

2.3 MSC Drawing, Rudder Carrier & Bearings 519-4842940.

2.4 Rudder and Propeller Lifting Gear Arr. 4842855.

3.0

DESCRIPTION/LOCATION/QUANTITY

3.1 Two rudders and associated rudder posts and the stern frame area. To include rudder stocks, rudder keys and rudder lock nuts.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES

5.1 The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7, 22, 23, and 29.

5.2 The contractor and all subcontractors regardless of tier are advised to review other work items under this contract, including but not limited to Work Item 001 through 099 to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 Rudder blades and stocks must be rigged off separately. Removal of the blades from the stocks is required before the stocks can be lifted out. Access openings for the stocks must be removed in way of rigging stocks up through the main deck.

5.4 Both rudders are equipped with a Ringfeder Locking Assembly. The condition of contact surfaces and proper tightening of the locking screws is important. Follow the manufacturer’s recommended procedure for locking screw installation and tightening sequence.

5.5 Final rudder alignment is to be witnessed by the MSC Port Engineer.

6.0

NOT USED

7.0 STATEMENT OF WORK

7.1 Accomplish the requirements of reference 2.1 In addition, accomplish the following work:

7.1.1 Temporarily remove and unship port & starboard rudders using reference 2.4 for guidance on rigging arrangements. Remove stock to inside facility.

7.1.2 Perform rudderpost wear down readings. Provide an “as found” condition report to the MSC Port Engineer.

7.1.3 Machine clean the rudder stocks in way of the taper areas, rudder blades, keyways, and keys. Clean and grease roller bearings. Clean Bores.

7.1.4 Prove proper fit/dimensions. Conduct a blue fit test of the rudder stock to the rudder blade to the satisfaction of the attending ABS surveyor. Submit an “as released” condition report to the MSC Port Engineer.

7.2 Reinstall rudders. Ensure proper torquing sequencing for the Ringfeder locking assembly. The attending ABS Surveyor & MSC rep shall witness all mechanical tightening.

7.2.1 Prior to reinstall, Grease upper and lower stock area.

8.0 GENERAL REQUIREMENTS: None additional

ASA9APACHE_20090406

- 1 -