This document is Amendment 0003 to a federal construction solicitation for Building 7019 Renovations at MCAS Cherry Point, North Carolina (Project No. 7406712). The amendment extends the proposal due date from August 26, 2026, at 2:00 PM local time to September 1, 2026, at 2:00 PM local time. The amendment addresses pre-award Requests for Information (RFIs), noting that the deadline to submit additional RFIs has passed. Revised contract drawings (NAVFAC DWG No. 12939486 Schedules & Legends, dated 8/24/2026) and Section 33 16 15 Water Storage Steel Reservoir specification (dated 8/24/2026) accompany this amendment.
The amendment includes 45 pre-award inquiry responses addressing technical and design clarifications. Key modifications include: deletion of the gas meter requirement with the building service regulator to be provided by the KTR; confirmation that a boiler master controller will control staging; allowance for bolted steel water storage tanks as an alternative to welded tanks (per modified Section 33 16 15); acceptance of third-party inspection as an alternative to AISC certification for structural steel work; and various clarifications on PTHP schedules, grille/diffuser designations, roofing specifications, telecommunications requirements, and interior finishes. The project magnitude is between $5,000,000 and $10,000,000. The government intends for three separate personnel to fill superintendent, Quality Control, and Site Safety and Health Officer roles. All responses direct contractors to provide work in accordance with the plans, specifications, and amendments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7406712 Amendment 0002.pdf | ||
| 7406712 Amendment 0001.pdf | ||
| 7406712 DrawingsAsOne.pdf | ||
| CJandA ML 25 03 Class FRCS Cherry Point - Redacted.pdf | ||
| 7406712 SpecsAsOne.pdf | ||
| Master PPI Form.xlsx | XLSX spreadsheet | |
| Gen MACC RFP_Feb2026_final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0003 08/25/2026 7406712
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point
FACILITIES, ROICC
B-87, 748 Roosevelt Blvd.
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION Building 7019 Renovations
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7406712 Building 7019 Renovations, MCAS Cherry Point, North Carolina.
Amendment 0003 is being issued to answer pre-award RFI’s.
The deadline to submit pre-award RFI’s HAS PASSED.
The proposal due date of 26 August 2026 at 2:00 PM local time HAS BEEN CHANGED to 01 September 2026 at 2:00PM local time.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA josef.vallone Underline
DISTRIBUTION: DoW COMMUNITY ONLY
CONTINUATION SHEET
DOCUMENT 00 01 15
1.2 CONTRACT DRAWINGS
The following drawings are revised as of 8/24/2026:
NAVFAC DWG NO. TITLE
12939486 SCHEDULES & LEGENDS, 8/24/2026
These drawings accompany this Amendment.
PROJECT TABLE OF CONTENTS
SECTION 33 16 15, WATER STORAGE STEEL RESERVOIR is deleted and 33 16 15, WATER STORAGE STEEL RESERVOIR, dated 8/24/2026, as shown in the footer, is added to the Project Table of Contents and accompanies this Amendment.
PREAWARD INQUIRY FORM
PAGE SECTION PARAGRAPH
1 8/10/2026 Is there a gas company contracted that provides the gas to building 7019?
Amerigas currently provides propane service.
2 8/10/2026 Will the gas company be responsible for moving the existing gas tank to its new location?
Provide in accordance with project plans and specifications. Reference Work Item 11, Sheet CD101.
3 8/10/2026 Will the gas company be responsible for providing the new underground gas piping from the tank to the gas meter?
Provide in accordance with project plans and specifications. Referenced Work Item 1, Sheet M-104.
4 8/10/2026 Will the gas company be providing & installing the gas meter at the building?
Delete meter requirement. Building service regulator is provided by the KTR in accordance with the Contract Documents.
5 7/22/2026 Please provide the Government's estimated cost range for this project. This information is requested to determine whether a bid bond will be required and to allow our surety to evaluate the appropriate bonding limits, as the estimated cost range is required for their review. Providing this information in advance will help avoid the unnecessary risk associated with requesting a bid bond on the day of bid submission and ensure sufficient time for the surety to issue the bond, allowing us to comply with the solicitation's Bond Requirements, which require the bid bond to be submitted with the proposal.
The magnitude of this project is between $5,000,000.00 and $10,000,000.00.
6 7/28/2026 Can individual follow up site visits be made with adequeate notice? If so, who would be the POC?
Due to end of fiscal year time constraints, I am not anticipating additional site visits being a possibility.
7 7/28/2026 230923.02 The sequence of operations on M-702 for the hot water system states that a boiler master controller will control the boilers and the primary hot water pumps. However, the control diagram on M-702 appears to indicate that the BMS system will directly control the boilers and primary hot water pumps. Please confirm whether a boiler master controller will control the boilers and primary hot water pumps as the sequence states or whether the BMS system will directly control the boilers and primary hot water pumps as the control diagram indicates.
Confirming boiler master controller to control staging. [CCE]
8 7/28/2026 The specs appear to require this project to have 3 persons to fill the role of suprerintendent, QC and SSHO. Is this the requirement for this project?
Yes, it is the government's intent to have 3 persons to fill the role of superintendent, Quality Control, and
SSHO.
POSTED ON
AMENDMENT #PPI # REFERENCE QUESTION GOVERNMENT RESPONSEDATE
SUBMITTED
July 2011
AMENDMENT #PPI # QUESTION GOVERNMENT RESPONSE
9 7/28/2026 MD101 23 81 00 2.3.1
Packaged Terminal Heat Pumps
Looking at the mechanical drawings, it shows the existing PTHP packaged terminal units as being removed & replaced as new. (Reference Demo Note 1 on drawing MD101) Looking through the equipment schedules I do not see a schedule for the new PTHP packaged terminal units. The only schedule shown refers to the Building Ventilation Schedule & Air Balance. Can we get an appropriate PTHP schedule which lists the heating & cooling requirements, Dehumidification, Electrical information, and any notes/remarks related to this piece of equipment so that we may know what to provide?
Updated schedule sheet to be provided.
[CCE]
10 7/28/2026 M-105 & M-
Looking at drawing M-105 there appears to be multiple types of (S1) grille/diffusers. Room 110 laundry shows both an S1/30 which appears to be 24" x24" drop-in & S1/100 grille/diffuser which appears to be smaller in size & different styles. Mechanical room 108 also shows an S1/200 that appears to be a sidewall grille/diffuser. According to the schedule on drawing M-601 an S1 should be a 24" x 24" square plaque face 4 way diffuser. The (S1) diffusers mentioned above may need to be reassigned different names so that the correct grille/diffusers are provided & installed.
Updated sheets to be provided. [CCE] 0002
11 8/3/2026 05120-1.3 Upon reviewing the specification for the above referenced solicitation, we found the following paragraph that will prohibit us from bidding : 05120-1.3 AISC Certification. We ask that a waiver be issued to allow third party inspection of both fabrication and erection and removal of this requirement.
Our track record speaks for itself in our ability to perform this type of work without this certification. It is also an unnecessary cost to be added to the project and limits the number of steel bidders if any.
EOR is not opposed to removing the requirement of an AISC certified erector and fabricator given the nature of the steel work on this project. Third party inspection is an approved alternate to AISC certification. (KDE)
12 7/30/2026 M105 & M601 Looking at drawing M-105 there appears to be multiple types of (S1) grille/diffusers. Room 110 laundry shows both an S1/30 which appears to be 24" x24" drop-in & S1/100 grille/diffuser which appears to be smaller in size & different styles. Mechanical room 108 also shows an S1/200 that appears to be a sidewall grille/diffuser. According to the schedule on drawing M-601 an S1 should be a 24" x 24" square plaque face 4 way diffuser. The (S1) diffusers mentioned above may need to be reassigned different names so that the correct grille/diffusers are provided & installed.
Answered above #10 [CCE] 0002
13 8/4/2026 T-001 Note 10 Drawing T-001, Telecommunications Note #10 states that Holocomm or equal should be used for surface-mounted applications where required. Holocomm is used for high security applications like SIPRNet and PDS cabling which does not appear to be in this project. Please confirm if Holocomm or equal is actually required.
Holocmm is not required for this project. [CCE]
14 8/7/2026 07 61 15 1.3.2.4 States roofing panels must be tested to AAMA 501.1 which is a wall panel test. Please confirm roof panels to be tested to wall panel standard.
Confirmed. Test is used for wind driven rain. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
[MBFA]
15 8/7/2026 07 61 15 The roof assembly on the drawings show 3 layers of insulation totalling 5" of poly iso - R value of apx 28. The specification for roof insulation calls out 34.5- and the roofing assembly spec calls out 3 layers totalling 6". Can you confirm the R value requirments?
Provide thickness required to achieve specified R value of 34.5. See revised sheet A-505 (12939472) [MBFA]
16 8/7/2026 07 22 00 3.2 Spec calls out 2 layers of rigid poly iso, not taped, with staggered joints. Drawings and roof spec call out 3 layers all taped joints. The roof manufacturer does not require taped joints for warranty. Can you confirm requirement of taped joints?
Provide taped joints per 07 61 15 CP Aluminum Standing Seam Roofing, Part 2 "Polyisocyanurate Insulation, multiple layers, minimum thickness of 6 inches, mechanically fastened, taped seams". Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
[MBFA]
17 8/7/2026 07 22 00 2.2.1 Insulation type dictates 25 PSI insulation. Standard is 20 PSI insulation. Roof manufacturer will warrant both/ Can you confirm 25 PSI requirement?
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments. [MBFA]
18 8/7/2026 07 22 00 1.7 Spec calls out need for engineered uplift fastening pattern on insulation. There is no membrane that is going to adhere to the insulation. The uplift is satisified with panel uplift engineering. Can we remove this spec requirment for insulation fastening pattern on steep slope roof application?
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments. [MBFA]
19 8/7/2026 07 61 15 2 Spec calls out 3 layers of Rigid poly iso with taped joints.
What tape is spec reffering to? Is there an insulation system that can be provided as basis of design?
Tape requirements listed in 07 61 15 CP Aluminum Standing Seam Roofing, paragraph 2.4.4 Sealant Tape. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments. [MBFA]
20 8/7/2026 07 61 15 2 Assembly calls out a gypsum board on rood deck. There is not a 2nd gypsum board on top of rigid poly iso. This will require the use of barring plates, or added layer of gypsum board. Can you confirm the use of barring plates or added 2nd layer of gypsum board?
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments. [MBFA]
21 8/7/2026 Can a hazardous material report for the building be provided? See Asbestos and Lead Survey following 01 90 00 Reports. Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.
22 8/7/2026 Should testing for hazardous materials prior to job start be anticipated? Can this be provided prior to submission of bid?
See Asbestos and Lead Survey following 01 90 00 Reports. Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.
23 8/7/2026 What is required for PMO on deliveries? Bill of lading or DBIDS for delivery drivers?
See 01 14 00 Work Restrictions.
Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.
24 8/7/2026 A-601 Is the intent for there to be one FG2 door in the S-1 and S-2 frames or for it to be double doors in those frames?
Provide double FG2 doors in S-1 and S- 2 as shown on A-101, A-201, and A-
202. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments. [MBFA]
25 8/7/2026 Please confirm if one qualified person can act as superintendent, QC, and SSHO? If not, is this a 2 or 3 man project?
See specification 01 35 26 1.8.3.
Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.
26 8/7/2026 Issue an FF&E responsibility matrix listing each item or schedule group as OFOI/OFOC/CFCI/CFCC (or equivalent), with corresponding rough-in, anchorage, final connection, and startup responsibilities.
Reference Furniture Schedule on sheet I-101 and FF&E Concept Binder from CID Package for list of CFCI FF&E items. Contractors interior designer must coordinate procurement and installation responsibilities with the selected best value FF&E vendor.
(WID)
8/7/2026 Identify the mandatory cybersecurity submittals and tests to be included in bid pricing, any owner-furnished standards or existing network requirements, and whether third-party cyber support or Government witnessing should be assumed.
Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments. [MBFA]
8/7/2026 Provide a concise list of commissioned systems, required independent TAB qualifications/tiering, and the minimum contractor/trade participation expected for meetings, testing, witnessing, and turnover.
Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments. [MBFA]
8/7/2026 Issue a written statement identifying the required manufacturer/platform, allowable integrators, required software/licenses, and whether any equals or alternate manufacturers will be accepted.
Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments. [MBFA]
8/12/2026
4 05 12 00 1.3
From the spec: "Work must be fabricated by an AISC Certified Structural Steel Fabricator, in accordance with AISC 207, Category BU. Submit AISC Structural Steel Fabricator quality certification. Work must be erected by an AISC Structural Steel Certified Erector, in accordance with AISC 207, Category CSE. Submit AISC Structural Steel erector quality certification." There are no AISC certified steel companies locally and in conversations with those who are certified (not local), they have no interest in Base work. Will the government consider removing this requirement or, as an option, entertain a third party Engineer to inspect steel work in accordance with AISC 360?
EOR is not opposed to removing the requirement of an AISC certified erector and fabricator given the nature of the steel work on this project. Third party inspection is an approved alternate to AISC certification. (KDE)
8/7/2026 AD101
PD101
Notes indicate removing all sanitary sewer piping to 5ft outside of building. AD 101 indicates concrete demo in certain areas but not enough to remove and replace all sanitary sewer piping. Is all the underground sewer piping to be new? Please define the intent of the scope of work. Provide in accordance with plans and specifications.
8/7/2026 ED101 Note 1 indicates Demo receptacles back to power source including conduit. Not all receptacles have that note attached.
Is the intention to demo all or just the indicated receptacles?
2. Conduits are in masonry walls, they can’t be removed without demolishing the walls. If the conduits in the walls are usable can they be utilized for the new work as most appear to be going back in the same location. If not please confirm surface mount raceways are acceptable. Provide in accordance with plans and specifications.
8/7/2026 CU101 Sheet CU 101 Shows a 56000 gal. fire water reservoir. It appears to be located above underground electrical and communications cabling possibly in duct bank. Without knowing exact location and depth of either or any foundation details for the proposed tank, should we anticipate relocating electrical and communication lines?
Provide in accordance with plans and specifications. (Avolis)
8/7/2026 There is no indication of a storm water drainage system.
Please confirm downspouts are to terminate above splash blocks.
Provide in accordance with plans and specifications . Downspouts dicharge to splash blocks. (Avolis)
8/13/2026 CU502 33 16 15 2.1.2 We are having difficulty sourcing a welded water storage tank for B7019 at Atlantic. We have spoken to two manufacturers that provide welded tanks; however, they are not interested in the project because it requires a ground-level tank - they only provide elevated tanks and the required tank size is too small for them to consider. CST Industries has a tank that conforms to NFPA22 and AWWA, however it is a "bolted" tank not welded. Attached is their brochure. CST has provded tanks for the U.S. Army and the U.S. Air Force, so they are familiary with federal government requirements. CST also infomred us that their tank would be considerably cheaper than an welded tank. Lead time for the bolted tank is 18 weeks after submittal approval. Can a bolted tank be provided as an alternative to a welded tank?
See modified Spec Section 33 16 15 "Water Storage Steel Reservoir".
(Avolis)
8/17/2026 Reflected ceiling plan shows mostly acoustical ceiling. Finish schedule indicates a painted ceiling thru out. Which is correct?
Please refer to the reflected ceiling plans. See attached sheet for an updated room finish schedule (WID)
8/17/2026 Plumbing demo indicates removal of of al existing waste & vent piping in entirerty. To accomplish this masonry chase walls will have to be demolished. Demolition plans do not indicate taking these walls down. Please clarify.
Provide in accordance with plans and specifications.
8/17/2026 Sustainability specifications basically indicate recycling everything demolished. Is this the intent?
Provide in accordance with plans and specifications.
8/17/2026 The finish schedule in the interior drawings show showers as solid surface. Architectural drawings indicate ceramic tile.
Which is correct?
Walls outside of the shower in the restrooms are tile (B3/I-201). The showers are solid surface - SS-3 in the finish legend.(WID)
8/17/2026 Hollow metal door frames appear to be wrap around /knock down frames which could indicate an odd size hollow metal door. Can the door size be confirmed?
Provide in accordance with plans and specifications. (MBFA)
8/17/2026 Can an additional site visit be scheduled? Not at this time due to FY26 timeline for award.
8/17/2026 Can it be confirmed the existing masonry walls match the Life
Safety Drawings?
Provide in accordance with plans and specifications.
8/17/2026 Are new masonry walls to extend to the new roof deck or the existing?
Existing roof deck. Provide in accordance with plans and specifications.
8/17/2026 Drawings don’t show any access into the new attic space for mechanical work? How is this to be accomplished?
See keynote 11 on A-102. Provide in accordance with plans and specifications.
8/18/2026 We are unable to source a 56000-gallon welded fire water tank. We recommend a bolted tank in lieu of the specified welded tank. If a Bolted Tank is not acceptable please provide 3 sources for the required tank by amendment.
See modified Spec Section 33 16 15 "Water Storage Steel Reservoir".
(Avolis)
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
STATION CONSTRUCTION WON:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
STATION DESIGN WON:
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
IP
T
M
AR
IN
E
NA
VA
L
ST
AT
IO
N
- N
OR
FO
LK
, V
A
M
AR
IN
E
C O
R
PS
A
IR
S
TA
TI
O
N C
H
ER
R Y
PO
IN
T, N
C
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
M
ID
AT
LA
N
TI
C
1008 GRANBY STREET
NORFOLK, VA 23510
757.224.0489
Fi le
P at h:
Pr in t D at e:
W :\2
B7
Ba rra ck s R en ov at io ns \R ev it\
B
W
ID
R
.rv t 8/
/2
2:
:1
PM
SC
H
ED
U
LE
S
LE
G
EN
D S
I-601
7406712
M C
O
LF
A
TL
AN
TI
C
FINAL SUBMITTAL
JDK APG JDK
L. PEED
H. PERRY
P. FAULKNER
D. CHASTAIN
7406712
12939486
BU
IL
D
IN
G
R
EN
O
VA
TI
O
N S
01 JUL 2026
ROOM FINISH SCHEDULE
ROOM
FLOOR FINISH BASE FINISH WALL FINISH CEILING FINISH NOTESNO. NAME
100 EXTERIOR CORRIDOR RES-1 RES-1 PNT-1 ACT-1
101 LOBBY RES-1 RES-1 PNT-1, PNT-3 ACT-1
102 CORRIDOR RES-1 RES-1 PNT-1 ACT-1
103 DUTY RES-1 RES-1 PNT-1, PNT-2 ACT-1
104 OFFICE RES-1 RES-1 PNT-1, PNT-2 ACT-1 4
105 TRAINING STORAGE RES-1 RES-1 PNT-1 PNT-6
106 COMM. SC-1 RB-1 PNT-1 -
106A ELEC. SC-1 RB-2 PNT-1, FRP-1 -
107 STORAGE RES-1 RES-1 PNT-1 -
108 MECH. SC-1 RB-1 PNT-1 -
109 DINING/TRAINING RES-1 RES-1 PNT-1, PNT-3 ACT-1 5
110 LAUNDRY RES-1 RES-1 PNT-1 PNT-6
111 KITCHEN T-4 TB-1 PNT-1 PNT-6
112 DRY STORAGE T-4 TB-1 PNT-1 PNT-6
113 TRASH SC-1 RB-1 PNT-1 -
114 GYM RF-1 WB-1 PNT-1, WP-1,(PNT-3 WEST WALL ONLY) ACT-1 4
114A GYM STORAGE RES-1 RES-1 PNT-1 ACT-1 4
115 FIRE PUMP SC-1 RB-1 PNT-1 -
116 LOUNGE RES-1 RES-1 PNT-1, WC-1 ACT-1 5
118 WOMEN T-1 - T-2, T-3 PNT-6 1, 3
119 JAN SC-1 RB-2 PNT-1, FRP-1 - 2
120 HEAD T-1 - T-2, T-3 PNT-6 1, 3, 4, 6
121 CORRIDOR RES-1 RES-1 PNT-1 ACT-1
TYP. TYPICAL TOILET T-1 - T-2, T-3 PNT-6 1, 3, 6
TYP. TYPICAL BEDROOM RES-1 RES-1 PNT-1, PNT-2 ACT-1 5
FINISH LEGEND
NO. NAME LOCATION MANUFACTURER MODEL COLOR SIZE
ACG-1 ACOUSTICAL CEILING GRID SUSPENDED CEILINGS (ACT-1) ARMSTRONG PRELUDE PLUS XL ALUMINUM WHITE 15/16" ACT-1 ACOUSTICAL CEILING TILE NON-GWB OR EXPOSED CEILINGS ARMSTRONG KITCHEN ZONE WHITE 24"x24" CP-1 CABINET PULL CASEWORK DOORS & DRAWERS HAFELE 101.20.744 STAINLESS STEEL 3" CENTER TO CENTER FRP-1 FIBERGLASS REINFORCED PLASTIC JANITOR CLOSET WALLS MARLITE PEBBLED LIGHT GRAY - GR-1 GROUT FLOOR TILE & WALL TILE - RESTROOMS CUSTOM BUILDING PRODUCTS EPOXY GROUT #165 DELOREAN GRAY 1/8" GROUT THICKNESS GR-2 GROUT FLOOR TILE - KITCHEN CUSTOM BUILDING PRODUCTS EPOXY GROUT #647 BROWN VELVET 3/8" GROUT THICKNESS HDP-1 HIGH DENSITY POLYETHYLENE TOILET PARTITIONS & LOCKERS SCRANTON PRODUCTS HINEY HIDERS - ORANGE PEEL SHALE - HW-1 COUNTERTOP SUPPORT BRACKET SOLID SURFACE COUNTERTOPS HAFELE 287.75.333 BLACK 12" X 10"
PLAM-1 PLASTIC LAMINATE CASEWORK WILSONART TIMBERGRAIN FINISH WALNUT PB COGNAC -
PNT-1 PAINT PRIMARY WALLS BENJAMIN MOORE - CC-80 GRAY MIST -
PNT-2 ACCENT PAINT SLEEPING QUARTERS & PRIVATE OFFICE BENJAMIN MOORE - CSP-195 PORCINI -
PNT-3 ACCENT PAINT CORRIDORS & GYM BENJAMIN MOORE - CC-64 BONAPARTE -
PNT-4 PAINT DOOR SLAB BENJAMIN MOORE HIGH GLOSS CSP-195 PORCINI -
PNT-5 PAINT DOOR FRAME/TRIM BENJAMIN MOORE HIGH GLOSS CSP-240 BROWNSTONE -
PNT-6 PAINT GWB & EXPOSED CEILINGS BENJAMIN MOORE - OC-17 WHITE DOVE -
RB-1 RUBBER BASE INTERIOR WALLS JOHNSONITE BASEWORKS 47 BROWN 4"
RB-2 RUBBER BASE JAN MARLITE M612 BLACK 4"
RES-1 EPOXY RESINOUS FLOORING CORRIDORS AND SLEEPING QUARTERS STONHARD STONBLEND GSI SHALE - RF-1 RUBBER TILE FLOORING GYM MANNINGTON COMMERCIAL RESET RED TONES 821 24"x24"
S-1 SIGNAGE FINISH FONT 2/90 SIGN SYSTEMS 709 CEMENT -
S-2 SIGNAGE FINISH BACKGROUND 2/90 SIGN SYSTEMS 204 BLACK -
S-3 SIGNAGE FINISH END CAPS 2/90 SIGN SYSTEMS - SATIN ANODIZED -
SC-1 SEALED CONCRETE UTILITY SPACES SCOFIELD SELECT SEAL PLUS CLEAR -
SS-1 SOLID SURFACE COUNTERTOPS CORIAN - ARTISTA CANVAS -
SS-2 SOLID SURFACE WINDOW SILLS CORIAN - DEEP MINK -
SS-3 SOLID SURFACE SHOWER SURROUNDS CORIAN - TRAVERTINE FIRENZE -
T-1 FLOOR TILE BATHROOM & JANITOR FLOORS BEST TILE IKONITE / ECWIKOGRY01 GREY 12" x 24" T-2 WALL TILE BATHROOM WALLS MOSAIC TILE PORTIFINO / 45PORMIS1224 MIST 12" x 24" T-3 ACCENT TILE BATHROOM WALLS MOSAIC TILE PLAYFUL / 04PLYCR1324GSAM CRIMSON 3" x 24" T-4 QUARRY TILE KITCHEN METROPOLITAN CERAMICS QUARRY BASICS CLEAR TONES 710 RAVEN 8" x 8" TS-1 TRANSITION STRIP RUBBER TILE TO CONCRETE MANNINGTON COMMERCIAL 146 REDUCER BLACK 3/8" REDUCER
TS-2 TRANSITION STRIP RESINOUS EPOXY TO TILE SCHLUTER RENO-U SATIN ALUMINUM -
TS-3 TRANSITION STRIP TILE INSIDE CORNER SCHLUTER DILEX AHK SATIN ALUMINUM -
TS-4 TRANSITION STRIP TILE OUTSIDE CORNER SCHLUTER QUADEC SATIN ALUMINUM -
TS-5 TRANSITION STRIP FRP TO PAINT MARLITE A570 ANODIZED ALUMINUM -
TS-6 TRANSITION STRIP WP TO PAINT DIAMOND LIFE J CAP HE82 3/32" OPENING, 17GA
WB-1 WALL BASE GYM DIAMOND LIFE BASE MOLDING MX DIAMOND PLATE 4"H, 17GA
WC-1 WALLCOVERING GYM & LOUNGE FIND YOUR LEVEL / NATIONAL L50607 LINDSEY METRO -
WP-1 WALL PANEL GYM WALLS DIAMOND LIFE DIAMOND PLATE ANODIZED PLATINUM 3/64", 17GA
WS-1 WINDOW SHADE EXTERIOR WINDOWS DRAPER SW270--V66 - 3% CHARCOAL/BROWN -
WS-2 BLACKOUT WINDOW SHADE SLEEPING QUARTERS DRAPER SPARTA TWILIGHT BLACKOUT PEWTER WHITE -
FINISH SCHEDULE NOTES
1. SEE B3/I-201FOR TYPICAL RESTROOM WALL TILE ELEVATION.
2. SEE B4/I-201 FOR TYPICAL JANITOR WALL ELEVATION.
3. FLOOR TILE INSTALLATION TO BE 1/3 OFFSET.
4. WINDOWS TO RECEIVE SINGLE LAYER ROLLER SHADE (WS-1). SEE
DETAIL D4/I-502.
5. WINDOWS TO RECEIVE DOUBLE LAYER ROLLER SHADE (WS-1 &
WS-2). SEE DETAIL B4/I-502.
6. INSTALL SOLID SURFACE SHOWER PANELS VERTICALLY SO THAT
VEINING RUNS NORTH TO SOUTH.
FINISH NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN TO CONVEY
COLOR, PATTERN, TEXTURE AND SALIENT CHARACTERISTICS ONLY.
THE LISTING OF MANUFACTURER INFORMATION IS NOT INTENDED TO
LIMIT THE SELECTION OF PRODUCTS PROVIDED BY OTHER
MANUFACTURERS. PRODUCTS MEETING THESE CRITERIA WILL BE
CONSIDERED AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND APPROVED
BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO ORDERING LEAD
TIMES. IT IS THE CONTRACTOR’S RESPONSIBILITY TO ORDER ALL
MATERIALS IN TIME TO AVOID DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS
AND CONSTRUCTION MANAGER. INSTALL THERMOSTATS NEAR A
CORNER OF THE ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL
THERMOSTATS IN THE CENTER OF A WALL.
D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT LOBBIES, AND
EXIT CORRIDORS MUST MEET MINIMUM CLASS A RATING.
E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS
F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION
JOINTS TO MATCH THE ADJACENT WALL COLOR. PANELS PAINTED BY
BRUSH ARE NOT ACCEPTABLE
G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES. FLOORING
TRANSITIONS OCCURRING UNDER DOORS MUST BE CENTERED UNDER
DOOR.
H. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST INCLUDE METAL
TRANSITIONS ON ALL OUTSIDE AND INSIDE CORNERS AS WELL AS THE
INTERSECTION BETWEEN FLOOR AND WALL TILE WHERE APPLICABLE
FOR A COMPLETE INSTALLATION.
I. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1) WITH THE EXCEPTION
OF AREAS RECEIVING FLOOR TILE OR EPOXY RESINOUS FLOORING.
J. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).
K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE INDICATED. ALL
HOLLOW METAL DOOR SLABS TO BE PAINTED PNT-4. HOLLOW METAL
DOOR FRAMES TO BE PAINTED (PNT-5). ALL GWB & EXPOSED CEILINGS
TO BE PAINTED (PNT-6).
L. ALL SHOWER FLOORS AND SHOWER WALLS TO BE SOLID SURFACE
(SS-3).
M. ALL INTERIOR WOOD DOORS TO BE (WD-1).
N. SEE I-601 FOR FINISH LEGEND.
I G
IV
R
FOHT
I
NO
M N
EW
A
OM
L
C
C
A
Cert. 001152
JAMIE D. KISSEL RER
T
IFIED
INTERIOR DES
IG
N E No.
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
Am en dm en t 0
8.
.2
Building 7019 Renovations Station Project No. 7406712 MCAS Cherry Point, NC 01 July 2026
SECTION 33 16 15
WATER STORAGE STEEL RESERVOIR
11/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 318 (2019; R 2022) Building Code Requirements for Structural Concrete (ACI 318-19) and Commentary (ACI 318R-19)
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 325 (2017) Steel Construction Manual
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.3 (2021) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.4 (2021) Gray Iron Threaded Fittings;
Classes 125 and 250
ASME B40.100 (2022) Pressure Gauges and Gauge Attachments
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA B300 (2024) Hypochlorites
AWWA B301 (2024) Liquid Chlorine
AWWA C104/A21.4 (2022) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water
AWWA C105/A21.5 (2018) Polyethylene Encasement for Ductile-Iron Pipe Systems
AWWA C110/A21.10 (2021) Ductile-Iron and Gray-Iron Fittings
AWWA C111/A21.11 (2023) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
AWWA C115/A21.15 (2025) Flanged Ductile-Iron Pipe With
SECTION 33 16 15 Page 1 REVISED 24 August 2026
Ductile-Iron or Gray-Iron Threaded Flanges
AWWA C150/A21.50 (2021; R 2023) Thickness Design of Ductile-Iron Pipe
AWWA C151/A21.51 (2023) Ductile-Iron Pipe, Centrifugally Cast
AWWA C500 (2019) Metal-Seated Gate Valves for Water Supply Service
AWWA C504 (2023) Standard for Rubber-Seated Butterfly Valves
AWWA C508 (2025) Swing-Check Valves for Waterworks Service, 2 In. Through 48-In. (50-mm Through 1,200-mm) NPS
AWWA C600 (2023) Installation of Ductile-Iron Mains and Their Appurtenances
AWWA C652 (2019) Disinfection of Water-Storage Facilities
AWWA D100 (2021) Welded Steel Tanks for Water Storage
AWWA D103 (2019) Factory-Coated Bolted Steel Tanks for Water Storage
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2025) Structural Welding Code - Steel
AWS D1.3/D1.3M (2025) Structural Welding Code - Sheet Steel
ASTM INTERNATIONAL (ASTM)
ASTM A48/A48M (2022) Standard Specification for Gray Iron Castings
ASTM A53/A53M (2024) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM D1200 (2010; R 2014) Viscosity by Ford Viscosity Cup
ASTM D1640/D1640M (2014) Standard Test Methods for Drying, Curing, or Film Formation of Organic Coatings
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-80 (2019) Bronze Gate, Globe, Angle, and Check Valves
SECTION 33 16 15 Page 2
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 22 (2023) Standard for Water Tanks for Private Fire Protection
NFPA 70 (2026; TIA 26-1; ERTA 26-1; TIA 26-2; TIA
26-3; TIA 26-4; TIA 26-5; TIA 26-6; TIA
26-7; ERTA 26-2; ERTA 26-3) National Electrical Code
NFPA 780 (2026) Standard for the Installation of Lightning Protection Systems
NSF INTERNATIONAL (NSF)
NSF/ANSI/CAN 61 (2024) Drinking Water System Components - Health Effects
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC SP 10/NACE No. 2 (2015) Near-White Blast Cleaning
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE AMS-STD-595A (2017) Colors used in Government Procurement
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-DTL-24441 (2009; Rev D; Notice 1 2021) Paint, Epoxy-Polyamide, General Specification for
MIL-DTL-24441/19 (2009; Rev C; Notice 1 2023) Paint, Epoxy-Polyamide, Zinc Primer, Formula 159, Type III
MIL-DTL-24441/31 (2009; Rev B; Notice 1 2021) Paint, Epoxy-Polyamide, White, Formula 152, Type
IV
MIL-PRF-85285 (2024; Rev F; Am 1 2024) Topcoat, Aircraft and Support Equipment
MIL-STD-161 (2025; Rev J) Identification Methods for Bulk Petroleum Products Systems Including Hydrocarbon Missile Fuels
UFC 3-575-01 (2012; with Change 1, 2021) Lightning and Static Electricity Protection Systems
UL SOLUTIONS (UL)
UL 96 (2025) UL Standard for Safety Lightning Protection Components
1.2 SUBMITTALS
Government approval is required for all submittals. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SECTION 33 16 15 Page 3
SD-01 Preconstruction Submittals
Manufacturer's Qualifications
SD-02 Shop Drawings
Detail Drawings
Tank Installation
Piping and Valve Installation
SD-03 Product Data
Manufacturer's Technical Literature
System Description
Foundations
Heating System
Alarm System
Disinfection Procedures
Valves
Pipe, Fittings, Joints and Couplings
Joint Sealants and Gaskets
Lightning Protection System
Interior Coating System
Exterior Coating System
SD-05 Design Data
Manufacturer's Design Analysis
Foundation Design Analysis
SD-06 Test Reports
Tank Installation
Testing of Valves and Piping
Hydrostatic Test
Leak Test
SD-07 Certificates
Tank Coating System
SECTION 33 16 15 Page 4
Pipe Lining and Coating
SD-08 Manufacturer's Instructions
Shipping, Handling, and Storage
SD-10 Operation and Maintenance Data
Cathodic Protection System ; G
1.3 QUALITY ASSURANCE
1.3.1 Manufacturer's Qualifications
The manufacturer and installer must demonstrate a minimum 10 years of experience in the manufacturing and construction of reservoir steel water storage tanks. Manufacturer must be able to demonstrate experience through the design and construction of at least 5 completed projects of similar type and size with references with current position, address, and contact information.
Provide certified manufacturer's design analysis , detail drawings, and foundation design analysis by an authorized licensed engineer in the geographical area where construction will take place, having a minimum 4 years of experience as an engineer knowledgeable in design and analyses of steel storage tanks and its foundations. Submit a certificate signed by a registered professional engineer, providing the following information:
a. Description of the structural design loading conditions used for the design of entire tank including the foundation.
b. Description of the structural design method and codes used in establishing the allowable stresses and safety factors applied in the design.
c. A statement verifying that the structural design has been checked by experienced engineers specializing in hydraulic structures.
d. A statement verifying that the detail drawings have been checked by experienced engineers specializing in hydraulic structures to determine that they agree with the design calculations in member sizes, dimensions, and fabricating process as prescribed by applicable AWWA, ACI, and other applicable standards.
1.3.2 Welding Qualifications
Qualification of welding procedures, welders, and welding operators must be in accordance with Section 8.2 of AWWA D100 or AWWA D103 and AWS D1.1/D1.1M and AWS D1.3/D1.3M .
1.3.3 Tank Coating System Certifications
Coating materials for interior applications and all other materials which will be in normal contact with potable water must conform to NSF/ANSI/CAN 61 . Certification by an independent third-party organization that all interior coatings and materials that come in contact with potable water must comply with NSF/ANSI/CAN 61 must be provided.
SECTION 33 16 15 Page 5
1.4 SHIPPING, HANDLING, AND STORAGE
Deliver paint in unopened containers with unbroken seals and labels showing designated name, specification number, color, directions for use, manufacturer, and date of manufacture, legible and intact at time of use.
Handle and store water storage tank systems, components, and parts to prevent distortions and other damage that could affect their structural, mechanical, or electrical integrity. Replace damaged items that cannot be restored to original condition. Store items subject to deterioration by exposure to elements, in a well-drained location, protected from weather, and accessible for inspection and handling.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Design Requirements
The design, fabrication, and erection of the reservoir steel water storage tank must be in accordance with the requirements of AWWA D100, ASCE 7-16 , and NFPA 22 . Submit design analyses and manufacturer's technical literature .
The following data and information are supplied as a basis for design and erection of the tank and appurtenances:
Tank Capacity and Dimensions - as indicated on plans.
Seismic Design Criteria - as indicated on plans.
Design Wind Loading - as indicated on plans.
Roof Design Loading - as indicated on plans.
2.1.2 Reservoir
The reservoir must have such standard shell height and diameter that will meet the requirements for the selected standard capacity and for the high-water level specified. The range between high and low water levels will be approximately 10 feet . The reservoir must have a clear span self-supporting , umbrella roof, or dome roof as approved. The reservoir must be of welded or bolted construction designed in accordance with AWWA D100, AWWA D103 AISC 325 and NFPA 22 .
2.1.3 Foundation
Foundation design and construction must be in accordance with Section 12 of AWWA D100 and ACI 318 . The foundation design must be based on recommendations provided in the Geotechnical investigation included with the Contract Documents. Recommendations for the foundation type, foundation depth, and design soil-bearing pressure are defined in this report.
2.2 MATERIALS
Provide materials conforming to the following requirements:
SECTION 33 16 15 Page 6
2.2.1 Steel
Comply with design requirements of Section 2 of AWWA D100, or Section 2 of AWWA D103 and AISC 325 and NFPA 22 .
2.2.2 Shop Fabrication
Section 9 of AWWA D100 or Section 7 of AWWA D103and NFPA 22 .
2.2.3 Ductile-Iron Pipe
Pipe, fittings, joints and couplings for fluid conductors, except for overflow pipe, must be ductile-iron pipe and must be either of the following:
2.2.3.1 Bell-and-Plain End Pipe
AWWA C150/A21.50 and AWWA C151/A21.51 , for not less than 150 psi working pressure, unless otherwise shown or specified. Joints must be push-on or mechanical-joint conforming to AWWA C111/A21.11 with pressure rating equivalent to that of the pipe. Provide standard thickness cement mortar lined in accordance with AWWA C104/A21.4 .
2.2.3.2 Flanged Pipe
Flanged pipes must conform to the applicable portions of AWWA C110/A21.10 , AWWA C115/A21.15 and AWWA C151/A21.51 , for not less than 150 psi working pressure, unless otherwise shown or specified. Pipe must have flanged ends in accordance with AWWA C115/A21.15 . Provide standard thickness cement mortar lining in accordance with AWWA C104/A21.4 .
2.2.4 Specials and Fittings (except for overflow pipe)
2.2.4.1 Ductile-Iron with Bell-and-Plain End
AWWA C110/A21.10 and AWWA C151/A21.51 for not less than 150 psi working pressure, unless otherwise shown or specified. Provide standard thickness cement mortar lining in accordance with AWWA C104/A21.4 .
2.2.4.2 Ductile-Iron with Flanged Ends
AWWA C110/A21.10 and AWWA C151/A21.51 for not less than 150 psi working pressure unless otherwise shown or specified. Fittings must have flanged ends in accordance with AWWA C110/A21.10 . Provide standard thickness cement mortar lining in accordance with AWWA C104/A21.4 .
2.2.4.3 Steel Piping
Pipe, ASTM A53/A53M, Standard Weight, zinc-coated for not less than 150 psi working pressure unless otherwise shown or specified. Fittings, ASME B16.4 , Class 125, zinc coated; or ASME B16.3 , Class 150, zinc coated, threaded.
2.2.4.4 Joints Inside Valve Chamber
All joints inside the valve chamber must be flanged.
2.2.5 Valves
Provide all valves from one manufacturer.
SECTION 33 16 15 Page 7
2.2.5.1 Gate Valves
Gate valves must be opened by turning counterclockwise. Valves 3 inches and larger must be stem type with joint ends compatible for the adjoining pipe conforming to AWWA C500. Valves smaller than 3 inches must be all bronze and must conform to MSS SP-80 , Type 1, class 150. Valves 3 inches or larger located in valve chambers must be equipped with hand-operating wheels and must be flanged.
2.2.5.2 Rubber-Seated Butterfly Valves
Rubber-seated butterfly valves must be opened by turning counterclockwise. Valves must conform to AWWA C504. Body and disc must be cast iron, conforming to ASTM A48/A48M. Shaft must be 18-8 stainless steel. Resilient seat must be bonded to the valve body. Butterfly valves must be stainless steel to rubber seated, tight closing type.
Flanged-end valves are required in valve chamber. Provide a union or sleeve-type coupling in the chamber to permit removal.
2.2.5.3 Check Valves
Check valves must conform to AWWA C508 and be of the horizontal swing-check type, suitable for the purpose and the operating conditions.
The body must be cast iron with flanged ends with pressure rating equivalent to that of the connecting pipe.
2.2.5.4 Altitude Valve
The supply to the reservoir must be controlled by a one-way 4 inch altitude valve, automatic in operation and accurately set to prevent overflow of the reservoir. The valve must have flanged ends and a heavy cast iron body, must be bronze fitted with renewable cups and seats, and must be designed without metal-to-metal seats. The valve must be cushioned when opening and closing to prevent water hammer or shock.
Valves must be provided with a travel indicator to determine operating position. All necessary repairs and/or modifications other than replacement of the main valve body must be made possible without removing the valve from the pipeline.
2.2.6 Pressure Gauge
Pressure gauge of the direct-reading type, equipped with a shutoff cock, must be provided, in the valve chamber, on the tank side and on the discharge side of the check or altitude valve. Gauges must have 6 inch dials, must be stem mounted, and must conform to ASME B40.100 . Accuracy of gauges must be Grade A or better. Gauges must be calibrated in psi in not more than 2 psi increments from 0 to 50 psi in excess of the normal operating pressure at the tank.
2.2.7 Joint Sealants and Gaskets
The lap joint sealant must be a one component, moisture cured, polyurethane compound in accordance with Section 4.10 of AWWA D103. The sealant must be suitable for contact with potable water must comply with NSF/ANSI/CAN 61 . Neoprene gaskets and tape type sealer must not be used in liquid contacting surfaces.
SECTION 33 16 15 Page 8
2.3 ASSEMBLIES
2.3.1 Tank Accessories
Section 7 of AWWA D100, NFPA 22 and as specified. Additional requirements for accessories are as follows:
2.3.1.1 Roof Hatches
Provide two access hatches 180 degrees apart on the roof of the tank. One hatch must be 30 inch diameter and allow access from the roof to the interior of the tank. The hatch will be hinged and equipped with a hasp for locking. The hatch cover must have a 2 inch downward edge. The second hatch will be 24 inch diameter and flanged with a removable cover so constructed that an exhaust fan may be connected for ventilation during inspection, maintenance, painting, and cleaning operations. The openings must have a minimum 4 inch curb
2.3.1.2 Tank Vent
Clog resistant tank vent must be centrically located on the tank roof above the maximum weir crest elevation. The vent must conform to Section
7.5 of AWWA D100 and NFPA 22 . The tank vent must have an intake and relief capacity sufficient to ensure that excessive pressure or vacuum, either entering or leaving the tank, will not be developed during maximum flow rate. The vent will be tank manufacturer's standard mushroom type constructed with corrosion resistant screen to prevent the ingress of wind driven debris, insects, birds and animals. The vent must be designed to ensure fail-safe operation in the event that screen frosts over or otherwise clogged and the bottom of the screen must be sufficiently elevated for snow consideration in the area
2.3.1.3 Overflow
The overflow for the tank must consist of an overflow weir box and outside drop pipe, adequately supported and capable of discharging, without the water level exceeding the maximum water level of the tank . The overflow pipe must be steel, ASTM A53/A53M or equal, and must terminate 1 to 2 feet above grade not to be obstructed by snow or ground clutter and must be fitted with a flapper valve or course corrosion-resistant screen to prevent ingress of animals and insects. A concrete splash pad and rip rap lined outlet area must be provided.
2.3.1.4 Shell Access Manholes
Number, type, location, and size of manholes must be as shown on the drawings and shall be in accordance with AWWA D100or AWWA D103 and NFPA 22 .
2.3.1.5 Pipe Connections
Number, type, location, load, and size of pipe connections must be as shown on the drawings. Inlet pipe connections shall be provided with an air gap . Outlet pipe connections to extend above tank bottom and must be provided with vortex breakers. Pipe connections to the tank must include a flexible coupling outside the tank to allow for differential movement.
Pipe connections through the shell must include protection from freezing and vandalism. Piping must allow for differential movement when the tank is filled and drained. Special flexible, extendable connections must be provided for tanks subject to seismic loads.
SECTION 33 16 15 Page 9
2.3.1.6 Ladders, Platforms, and Safety Devices
Ladders, platforms, and safety devices must be provided in accordance with Sections 7.4 of AWWA D100 or Sections 7.4 and 7.5 of AWWA D103and NFPA 22 .
Location of ladders must be as shown on the drawings. Sections 7.4 of AWWA D100 and Sections 7.4 and 7.5 of AWWA D103 represent the minimum requirement. In addition, safety cage, rest platforms, roof platforms, roof ladder handrails, and other safety devices must be provided as required by federal or local laws or regulations.
2.3.1.7 Balconies
Provide a balcony a minimum of 2 feet wide with a standard guard railing.
Provide a structural steel railing with a top rail 42 inches above balcony platform with an intermediate rail halfway between. Guard rail must be capable of withstanding a force of 200 pounds applied in any direction.
Install a steel toe board with minimum height of 4 inches . Bottom of toe board must be a maximum 1/4 inch from platform top. Extend guard rail and toe board entire length of balcony except where access openings are required. For balcony floors use diamond plates a minimum of 1/4 inch thick, punched or drilled for drainage. Hatches through balcony floor must be counterbalanced or otherwise arranged to open from below.
2.3.2 Valve Chamber
Valve chamber must be sufficiently large to house all control valves and fittings; and allow for unobstructed maintenance and replacement. Pipes, valves, and fittings must be supported on concrete blocks where necessary. The valve chamber must be constructed to provide not less than 3 feet of cover over the pipes. The valves and fittings must extend from the reservoir connection to a point one length of pipe outside the valve chamber walls on the main or feed line to the reservoir; the drain line will be carried to an outlet. The access cover must be aluminum and allow full access to all components therein .
2.3.3 Anchors for Reservoirs
The following requirements must be met:
a. An adequate number of anchors designed to prevent overturning for the maximum design uplift forces on the reservoir must be installed. If anchor bolts are used, the nominal diameter must not be less than one inch , plus a corrosion allowance of at least 1/4 inch on the diameter. If anchor straps are used, they must be pre-tensioned before welding to the tank shell.
b. The anchor bolts must be a right angle bend, hook, or plate washer, while anchor straps must have only a plate welded to the bottom. The anchors must be inserted into the foundation to resist the computed uplift.
c. Attachment of anchors to the shell must not add significant localized stresses to the shell. The method of attachment must consider the effects of deflection and rotation of the tank shell. Anchors must not be attached to the tank bottom. Attachment of the anchor bolts to the shell must be through stiffened chair-type assemblies or anchor rings of adequate size and height.
SECTION 33 16 15 Page 10
2.3.4 High and Low Water Level Alarm System
Provide high and low level devices for alarm monitoring and an intermediate device visible on the tank exterior for tank water level status. All three water levels must be indicated by their respective pilot lights; green for high, amber for intermediate and red for low water levels, and a buzzer for low and high water levels. Buzzer and the respective pilot lights at high and low water levels must be energized while the high or low water level pilot device is actuated. Depressing a silencing button must silence the buzzer indicating the water level and must remain in OFF condition. The pilot light must remain energized.
Resetting the pilot light must de-energize the pilot light and release the buzzer from its sealed-off condition.
2.3.5 Heating System
Provide tank heating to comply with NFPA 22 and with capacity to maintain 42 degrees F at all times including coldest temperatures and lowest consumption.
2.4 COATINGS
2.4.1 Interior Coating System
Provide a complete interior tank coating system.
2.4.1.1 COATING SYSTEM
Alternate systems or products will not be considered. All primer, intermediate, and topcoat materials shall be manufactured by one manufacturer. The entire coating system is intended to be applied in the field. Alternatively, surface preparation may be accomplished in the shop, following all temperature, humidity, and testing requirements listed herein, followed by an application of a hold-primer. Upon completion of field fabrication, all shop-applied coatings shall be removed, surfaces prepared to SSPC SP 10/NACE No. 2 , and the specified coating system applied. Adjust all shop preparation to avoid conflicts with final surface preparation requirements.
2.4.1.2 NSF Certified Polyamide Epoxy Coating System
Select a commercially available, three coat polyamide epoxy coating system…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .