7406712 Amendment 0002.pdf

PDF 1 MB Posted

Attached to
7406712 Building 7019 Renovations
Solicitation number
N400857406712
Issued by

About this file

This document is Amendment 0002 to Solicitation 7406712 for Building 7019 Renovations at Marine Corps Air Station (MCAS) Cherry Point, North Carolina, issued by the CG MCAS Cherry Point Facilities, ROICC on August 19, 2026.

The amendment extends the proposal due date from August 19, 2026 at 2:00 PM local time to August 26, 2026 at 2:00 PM local time. The amendment addresses pre-award Requests for Information (RFIs) with 30 responses to technical questions spanning mechanical systems, electrical specifications, roofing requirements, structural steel certification, telecommunications, hazardous materials, staffing, and furnishings and equipment responsibilities. Key clarifications include confirmation that boiler master controllers will control boilers and primary hot water pumps; updated mechanical schedules for packaged terminal heat pumps and air distribution; approval of third-party inspection as an alternative to AISC certified erector and fabricator requirements; clarification that Holocomm is not required for telecommunications; confirmation of R-value requirements for roof insulation; specification of taped joints for polyisocyanurate insulation; and delineation of government versus contractor responsibilities for furnishings, equipment, and commissioning activities. The amendment also includes revised contract drawings as of August 18, 2026: NAVFAC Drawing 12939472 (Roofing Details), 12939518 (Enlarged First Floor Plan—Mechanical HVAC), and 12939537 (Mechanical Schedules). The project magnitude is estimated between $5,000,000 and $10,000,000, and three separate personnel are required to fill superintendent, quality control, and site safety and health officer roles.

View the file

Other files

File Type Posted
7406712 Amendment 0003.pdf PDF
7406712 Amendment 0001.pdf PDF
CJandA ML 25 03 Class FRCS Cherry Point - Redacted.pdf PDF
7406712 SpecsAsOne.pdf PDF
Master PPI Form.xlsx XLSX spreadsheet
Gen MACC RFP_Feb2026_final.pdf PDF
7406712 DrawingsAsOne.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0002 08/19/2026 7406712

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point

FACILITIES, ROICC

B-87, 748 Roosevelt Blvd.

PSC BOX 8006

CHERRY POINT, NC 28533

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION

Building 7019 Renovations

9B. DATED (SEE ITEM 11)

AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

7406712 Building 7019 Renovations, MCAS Cherry Point, North Carolina.

Amendment 0002 is being issued to answer pre-award RFI’s.

The deadline to submit pre-award RFI’s HAS PASSED.

The proposal due date of 19 August 2026 at 2:00 PM local time HAS BEEN CHANGED to 26 August 2026 at 2:00PM local time.

See Attached.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

DISTRIBUTION: DoW COMMUNITY ONLY

CONTINUATION SHEET

DOCUMENT 00 01 15

1.2 CONTRACT DRAWINGS

The following drawings are revised as of 8/18/2026:

NAVFAC DWG NO. TITLE

12939472 ROOFING DETAILS, 8/12/2026

12939518 ENLARGED FIRST FLOOR PLAN – MECHANICAL HVAC,

8/08/2026

12939537 MECHANICAL SCHEDULES, 8/08/2026

These drawings accompany this Amendment.

PREAWARD INQUIRY FORM

PAGE SECTION PARAGRAPH

1 8/10/2026 Is there a gas company contracted that provides the gas to building 7019?

Amerigas currently provides propane service.

2 8/10/2026 Will the gas company be responsible for moving the existing gas tank to its new location?

Provide in accordance with project plans and specifications. Reference Work Item 11, Sheet CD101.

3 8/10/2026 Will the gas company be responsible for providing the new underground gas piping from the tank to the gas meter?

Provide in accordance with project plans and specifications. Referenced Work Item 1, Sheet M-104.

4 8/10/2026 Will the gas company be providing & installing the gas meter at the building?

Delete meter requirement. Building service regulator is provided by the KTR in accordance with the Contract Documents.

5 7/22/2026 Please provide the Government's estimated cost range for this project. This information is requested to determine whether a bid bond will be required and to allow our surety to evaluate the appropriate bonding limits, as the estimated cost range is required for their review. Providing this information in advance will help avoid the unnecessary risk associated with requesting a bid bond on the day of bid submission and ensure sufficient time for the surety to issue the bond, allowing us to comply with the solicitation's Bond Requirements, which require the bid bond to be submitted with the proposal.

The magnitude of this project is between $5,000,000.00 and $10,000,000.00.

6 7/28/2026 Can individual follow up site visits be made with adequeate notice? If so, who would be the POC?

Due to end of fiscal year time constraints, I am not anticipating additional site visits being a possibility.

7 7/28/2026 230923.02 The sequence of operations on M-702 for the hot water system states that a boiler master controller will control the boilers and the primary hot water pumps. However, the control diagram on M-702 appears to indicate that the BMS system will directly control the boilers and primary hot water pumps. Please confirm whether a boiler master controller will control the boilers and primary hot water pumps as the sequence states or whether the BMS system will directly control the boilers and primary hot water pumps as the control diagram indicates.

Confirming boiler master controller to control staging. [CCE]

8 7/28/2026 The specs appear to require this project to have 3 persons to fill the role of suprerintendent, QC and SSHO. Is this the requirement for this project?

Yes, it is the government's intent to have 3 persons to fill the role of superintendent, Quality Control, and

SSHO.

POSTED ON

AMENDMENT #PPI # REFERENCE QUESTION GOVERNMENT RESPONSEDATE

SUBMITTED

July 2011

PAGE SECTION PARAGRAPH AMENDMENT #PPI # QUESTION GOVERNMENT RESPONSESUBMITTED

9 7/28/2026 MD101 23 81 00 2.3.1

Packaged Terminal Heat Pumps

Looking at the mechanical drawings, it shows the existing PTHP packaged terminal units as being removed & replaced as new. (Reference Demo Note 1 on drawing MD101) Looking through the equipment schedules I do not see a schedule for the new PTHP packaged terminal units. The only schedule shown refers to the Building Ventilation Schedule & Air Balance. Can we get an appropriate PTHP schedule which lists the heating & cooling requirements, Dehumidification, Electrical information, and any notes/remarks related to this piece of equipment so that we may know what to provide?

Updated schedule sheet to be provided.

[CCE]

10 7/28/2026 M-105 & M-

Looking at drawing M-105 there appears to be multiple types of (S1) grille/diffusers. Room 110 laundry shows both an S1/30 which appears to be 24" x24" drop-in & S1/100 grille/diffuser which appears to be smaller in size & different styles. Mechanical room 108 also shows an S1/200 that appears to be a sidewall grille/diffuser. According to the schedule on drawing M-601 an S1 should be a 24" x 24" square plaque face 4 way diffuser. The (S1) diffusers mentioned above may need to be reassigned different names so that the correct grille/diffusers are provided & installed.

Updated sheets to be provided. [CCE] 0002

11 8/3/2026 05120-1.3 Upon reviewing the specification for the above referenced solicitation, we found the following paragraph that will prohibit us from bidding : 05120-1.3 AISC Certification. We ask that a waiver be issued to allow third party inspection of both fabrication and erection and removal of this requirement.

Our track record speaks for itself in our ability to perform this type of work without this certification. It is also an unnecessary cost to be added to the project and limits the number of steel bidders if any.

EOR is not opposed to removing the requirement of an AISC certified erector and fabricator given the nature of the steel work on this project. Third party inspection is an approved alternate to AISC certification. (KDE)

12 7/30/2026 M105 & M601 Looking at drawing M-105 there appears to be multiple types of (S1) grille/diffusers. Room 110 laundry shows both an S1/30 which appears to be 24" x24" drop-in & S1/100 grille/diffuser which appears to be smaller in size & different styles. Mechanical room 108 also shows an S1/200 that appears to be a sidewall grille/diffuser. According to the schedule on drawing M-601 an S1 should be a 24" x 24" square plaque face 4 way diffuser. The (S1) diffusers mentioned above may need to be reassigned different names so that the correct grille/diffusers are provided & installed.

Answered above #10 [CCE] 0002

13 8/4/2026 T-001 Note 10 Drawing T-001, Telecommunications Note #10 states that Holocomm or equal should be used for surface-mounted applications where required. Holocomm is used for high security applications like SIPRNet and PDS cabling which does not appear to be in this project. Please confirm if Holocomm or equal is actually required.

Holocmm is not required for this project. [CCE]

14 8/7/2026 07 61 15 1.3.2.4 States roofing panels must be tested to AAMA 501.1 which is a wall panel test. Please confirm roof panels to be tested to wall panel standard.

Confirmed. Test is used for wind driven rain. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.

[MBFA]

15 8/7/2026 07 61 15 The roof assembly on the drawings show 3 layers of insulation totalling 5" of poly iso - R value of apx 28. The specification for roof insulation calls out 34.5- and the roofing assembly spec calls out 3 layers totalling 6". Can you confirm the R value requirments?

Provide thickness required to achieve specified R value of 34.5. See revised sheet A-505 (12939472) [MBFA]

16 8/7/2026 07 22 00 3.2 Spec calls out 2 layers of rigid poly iso, not taped, with staggered joints. Drawings and roof spec call out 3 layers all taped joints. The roof manufacturer does not require taped joints for warranty. Can you confirm requirement of taped joints?

Provide taped joints per 07 61 15 CP Aluminum Standing Seam Roofing, Part 2 "Polyisocyanurate Insulation, multiple layers, minimum thickness of 6 inches, mechanically fastened, taped seams". Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.

[MBFA]

17 8/7/2026 07 22 00 2.2.1 Insulation type dictates 25 PSI insulation. Standard is 20 PSI insulation. Roof manufacturer will warrant both/ Can you confirm 25 PSI requirement?

Submit proposals in accordance with RFP, Specifications, Drawings and all amendments. [MBFA]

18 8/7/2026 07 22 00 1.7 Spec calls out need for engineered uplift fastening pattern on insulation. There is no membrane that is going to adhere to the insulation. The uplift is satisified with panel uplift engineering. Can we remove this spec requirment for insulation fastening pattern on steep slope roof application?

Submit proposals in accordance with RFP, Specifications, Drawings and all amendments. [MBFA]

19 8/7/2026 07 61 15 2 Spec calls out 3 layers of Rigid poly iso with taped joints.

What tape is spec reffering to? Is there an insulation system that can be provided as basis of design?

Tape requirements listed in 07 61 15 CP Aluminum Standing Seam Roofing, paragraph 2.4.4 Sealant Tape. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments. [MBFA]

20 8/7/2026 07 61 15 2 Assembly calls out a gypsum board on rood deck. There is not a 2nd gypsum board on top of rigid poly iso. This will require the use of barring plates, or added layer of gypsum board. Can you confirm the use of barring plates or added 2nd layer of gypsum board?

Submit proposals in accordance with RFP, Specifications, Drawings and all amendments. [MBFA]

21 8/7/2026 Can a hazardous material report for the building be provided? See Asbestos and Lead Survey following 01 90 00 Reports. Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

22 8/7/2026 Should testing for hazardous materials prior to job start be anticipated? Can this be provided prior to submission of bid?

See Asbestos and Lead Survey following 01 90 00 Reports. Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

23 8/7/2026 What is required for PMO on deliveries? Bill of lading or DBIDS for delivery drivers?

See 01 14 00 Work Restrictions.

Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

24 8/7/2026 A-601 Is the intent for there to be one FG2 door in the S-1 and S-2 frames or for it to be double doors in those frames?

Provide double FG2 doors in S-1 and S- 2 as shown on A-101, A-201, and A-

202. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments. [MBFA]

25 8/7/2026 Please confirm if one qualified person can act as superintendent, QC, and SSHO? If not, is this a 2 or 3 man project?

See specification 01 35 26 1.8.3.

Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

26 8/7/2026 Issue an FF&E responsibility matrix listing each item or schedule group as OFOI/OFOC/CFCI/CFCC (or equivalent), with corresponding rough-in, anchorage, final connection, and startup responsibilities.

Reference Furniture Schedule on sheet I-101 and FF&E Concept Binder from CID Package for list of CFCI FF&E items. Contractors interior designer must coordinate procurement and installation responsibilities with the selected best value FF&E vendor.

(WID)

8/7/2026 Identify the mandatory cybersecurity submittals and tests to be included in bid pricing, any owner-furnished standards or existing network requirements, and whether third-party cyber support or Government witnessing should be assumed.

Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments. [MBFA]

8/7/2026 Provide a concise list of commissioned systems, required independent TAB qualifications/tiering, and the minimum contractor/trade participation expected for meetings, testing, witnessing, and turnover.

Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments. [MBFA]

8/7/2026 Issue a written statement identifying the required manufacturer/platform, allowable integrators, required software/licenses, and whether any equals or alternate manufacturers will be accepted.

Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments. [MBFA]

8/12/2026

4 05 12 00 1.3

From the spec: "Work must be fabricated by an AISC Certified Structural Steel Fabricator, in accordance with AISC 207, Category BU. Submit AISC Structural Steel Fabricator quality certification. Work must be erected by an AISC Structural Steel Certified Erector, in accordance with AISC 207, Category CSE. Submit AISC Structural Steel erector quality certification." There are no AISC certified steel companies locally and in conversations with those who are certified (not local), they have no interest in Base work. Will the government consider removing this requirement or, as an option, entertain a third party Engineer to inspect steel work in accordance with AISC 360?

EOR is not opposed to removing the requirement of an AISC certified erector and fabricator given the nature of the steel work on this project. Third party inspection is an approved alternate to AISC certification. (KDE)

FLUSH METAL WALL PANEL

4" ZEE GIRTS

AIR AND MOISTURE

BARRIER

METAL FLASHING

AND DRIP EDGE

METAL WALL

PANEL TRIM

STANDING SEAM

METAL ROOF

ICE AND WATER GUARD

RIGID INSULATION

ROOF DECK AIR AND

MOISTURE BARRIER

FILL DECK FLUTES

ABOVE STUD TRACK

WITH INSULATION

STEEL ROOF DECK

FINISH CEILING

6"x6" SHEET METAL

GUTTER. PROVIDE GUTTER

SPACES AT 2'-0" ON CENTER

SHEET METAL

DRIP EDGE

FLUSH METAL

PANEL SOFFIT

SHEET METAL FASCIA

AND DRIP EDGE

7/8" HAT CHANNELS

LIGHT GAUGE TRUSS. SEE

STRUCTURAL DRAWINGS

GYPSUM SHEATHING

BATT INSULATION

GYPSUM SHEATHING

CONTINUOUS AIR

BARRIER SEALANT

1/2" GYPSUM BOARD

SHEATHING

FILL VOIDS WITH INSULATION

EXISTING ROOF

STRUCTURE AND ROOF

DECK TO REMAIN

SEE STRUCTURAL

DRAWINGS

6" STEEL STUDS AT 1'-4" ON

CENTER BETWEEN TRUSSES

4"x4" SHEET METAL

DOWNSPOUTS

EXISTING WALL

RIDGE CAP

16 GAUGE RIDGE PAN

STANDING SEAM ROOFING

BUTYL TAPE

AT THREE

SIDES

CONTINUOUS "Z"

CLOSURE BETWEEN

SEAMS

CONCEAL PANEL

FASTENERS

UNDER RIDGE CAP

CLOSURE SCREWS

STANDING SEAM

ROOFING

VALLEY FLASHING

16 GAUGE

VALLEY PAN

BUTYL TAPE

1"

8" MIN

STANDING SEAM

METAL ROOFING

(3) 2" LAYERS RIGID

INSULATION - TAPE ALL JOINTS

ICE AND WATER GUARD

STRUCTURAL METAL

ROOF DECKING

ROOF DECK AIR AND

MOISTURE BARRIER

1/2" GYPSUM BOARD

SHEATHING

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STATION CONSTRUTION WON:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

STATION DESIGN WON:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

IP

T M

A R

IN

E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

T

T C

E

TI

HCRAD

R E

G I S

ERE

A N

I

L

ORA

N O

R

T H

C

N

D A

R

N

DE

.J UE

ER

III

C

N

NRB E

E W

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

M

ID

A

T L A

N T

IC

AS INDICATED

M

A

P.

STCETIHCRA

FB

BERN N.C

.NEW

CERT. NO.

UTCETIHCRA

DERET

SI

G E R

NO

IT

AR

OP

RO

C

LAR

CAROLINANORTH

50679

/1

/2

:5 :3

P

M

C U s e rs

\s ig m o n \D o c u m e n ts

\2

A

R C

H s ig m o n

P

C R

M .r v t

R O

O F

IN

G

D E

T A

IL

S

A-505

7406712

12939472

REL REL DJE,III

L. PEED

H. PERRY

P. FAULKNER

D. CHASTAIN

7406712

01 JUL 2026

M C

O L

F A

T L A

N T

IC

B

U

IL

D

IN

G

R E

N O

V A

T

IO

N S

A -5

GRAPHIC SCALE: 3"=1'-0"

0 3" 6" 1"

GRAPHIC SCALE: 1 1/2"=1'-0"

1' 6" 3" 0 1'

SCALE: 1 1/2" = 1'-0"

B5

TYPICAL EAVE DETAIL

SCALE: 3" = 1'-0"

A2

RIDGE DETAIL

SCALE: 3" = 1'-0"

B2

VALLEY DETAIL

SCALE: 1 1/2" = 1'-0"

D2

ROOF ASSEMBLY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

E V

IS

IO

N .0

.1

A2

M-302

A3

M-301

A H

U -1

B

16"x16" R5

"ø

R5

S3

"ø

"ø

S3

"x

" 10

"x

"x

A H

U -1

A

S3

"x

14"ø

14"ø

R5

R5

"x

"x

28"x20"

28"x12"

28"x20"

6" x8

6"ø E3

12"ø

S4

10"ø

10"ø

S3

6"ø

E3

6"ø

S3

10"ø

"x

S3

8"ø 18"x12"

10"ø

E4

10"ø 12"ø

H-2

H-1

MAU-1

24"x24"

DAC-1

6" ø

4" ø

"ø

4" ø

S5

S5

4"ø

6"x6"

S8

"x

16"x26"

22"x22"

"x

"14 "x

12"x6"

6" ø

S1

S1

6" ø

S1

6"ø

6"ø

R1

R6

S5 30 R2

6" ø

8"x10"

12"x16"

16"x14"

16"x26"

S2

A H

U -2

14"x10"

12"x10"

6" ø

R3

"ø

14"x12"

S5

"ø

E3

10"ø S3

S3

S3 ø10"

"ø

16"x12"

AHU-3

14"x16"

R5

R5 ø14"

"ø

10"ø

8"ø

6" ø 10

"ø

S3

S3

R2 100S1

DAC-2

"x

DOAS-1

E5

S8

4"ø

LAUNDRY

ELEC.

106A COMM.

MECH.

FIRE PUMP

GYM STORAGE

114A

GYM

TRAINING STORAGE

KITCHEN

DINING/TRAINING

DRY STORAGE

TRASH

TOILET

111A

STORAGE

DUTY

OFFICE

CORRIDOR

LOBBY

ENTRY

R1

S2

8" ø

6" ø

6" x8

6"x8"

14"x14"

10"x10"

6"x6"

6"x6"

DOCU-1

CU-1A

CU-1B

CU-2

CU-3

CU-4

DCU-1

DCU-2

10"ø

10"ø S3

S3

18"x16" 16"x14"

"x

UP TO ROOF

UP TO ROOF

6" ø

S5

S2

S5

6" ø

"x

6"x6"S8

8" ø

S2

8" ø

S5

SD

S1

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R U

C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

E N

L A

R G

E D

F

IR

S T

F L

O O

R P

L A

N

M E

C H

A N

IC

A

L H

V A

C

M-105

7406712

12939518

LWM MWF JDL

L. PEED

H. PERRY

P. FAULKNER

D. CHASTAIN

7406712

M C

O L

F A

T L A

N T

IC

B

U

IL

D

IN

G

R E

N O

V A

T

IO

N S

# NEW WORK NOTES

1 PROVIDE 4" ROUND LAUNDRY EXHAUST TO

EXTERIOR WALL CAP.

2 PROVIDE FLOOR MOUNTED DOAS UNIT WITH DX

COOLING COIL SECTION AND HW COIL SECTION IN

THE REHEAT POSITION. ROUTE VENTILATION AND

EXHAUST DUCTWORK AS SHOWN.

3 PROVIDE SUSPENDED, ABOVE CEILING AIR

HANDLING UNIT WITH DX COOLING COIL AND HW

REHEAT COIL. ROUTE SUPPLY AND RETURN

DUCTWORK TO LAY DIFFUSERS AND GRILLES AS

SHOWN.

4 PROVIDE WALL MOUNTED DUCTLESS SPLIT AIR

HANDLER MOUNTED AS SHOWN. COORDINATE

EXACT LOCATION AND HEIGHT WITH ALL OTHER

EQUIPMENT IN SPACE.

5 PROVIDE AIR CURTAIN ABOVE EXTERIOR DOOR.

OPERATION MUST BE TIED TO DOOR SWITCH.

6 PROVIDE KITCHEN EXHAUST HOOD, FAN,

CONTROLS AND DUCTWORK AS SHOWN. SEE

DETAIL SHEETS FOR MORE INFORMATION.

7 PROVIDE EXTERIOR CONDENSING UNIT MOUNTED

ON EQUIPMENT SUPPORT PAD AS SHOWN.

GENERAL NOTES:

1. SEE SHEET M-001 FOR GENERAL NOTES,

LEGEND & ABBREVIATIONS

2. PLAN DRAWINGS ARE DIAGRAMMATIC IN

NATURE AND DO NOT ILLUSTRATE ALL

SPECIFIC DUCT TAKE-OFF CONFIGURATIONS,

TAPS, ETC. PROVIDE FLEXIBLE DUCTWORK

RUNOUTS TO ALL SUPPLY AND RETURN

GRILLES WITH A MAXIMUM LENGTH OF 5 FEET

AND SINLGE BENDS NO GREATER THAN 45

DEGREES. REFER TO PROJECT SPECIFICATION

AND DUCTWORK DETAILS FOR SPECIFIC

REQUIREMENTS.

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

NTS

A2

ENLARGED FIRST FLOOR PLAN - MECHANICAL HVAC

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

P

P I R

E V

IS

IO

N A

U G

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R U

C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

M E

C H

A N

IC

A

L S

C H

E D

U L

E S

M-601

7406712

12939537

LWM MWF JDL

L. PEED

H. PERRY

P. FAULKNER

D. CHASTAIN

7406712

M C

O L

F A

T L A

N T

IC

B

U

IL

D

IN

G

R E

N O

V A

T

IO

N S

84 141

MCDB (°F) W (grains H2O/lbm dry air)

DEHUMIDIFICATION CONDITIONS

WINTER 27.0 (99.0% ASHRAE)

SUMMER 90.0 / 77.0 (1% ASHRAE)

SEASON DB/WB (°F)

OUTDOOR DESIGN CONDITIONS

DESIGN CONDITIONS

3. TESTING MAY BE DONE AT POSITIVE PRESSURE FOR NEGATIVE SYSTEMS.

2. UTILIZE DUCT LEAK CLASSES INDICATED IN THIS TABLE FOR THE LISTED DUCT PRESSURE CLASSES AND DUCT SEAL CLASS.

1. TEST IN ACCORDANCE WITH SPECIFICATION SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC, AND WITH THE PROCEDURES IN SMACNA 016 HVAC AIR DUCT LEAKAGE TEST MANUAL.

REMARKS:

EXHAUST FAN - - -1 - - - - - A 8 A 16 - - - - - - - - 1 1,2,3

AHU 2 - - - A 8 A 16 - - - - - - - - - - - - 2 1,2

- - - -4 A 8 A 16 - - - - - - - - - - - - 4 1,2

DOAS-1

4 - - - A 8 A 16 - - - - - - - - - - - - 4 1,2

SA DUCT

RA

DUCT

EA

DUCT

OA

DUCT

DUCT

SEAL

CLASS

DUCT

LEAK

CLASS

DUCT

SEAL

CLASS

DUCT

LEAK

CLASS

DUCT

SEAL

CLASS

DUCT

LEAK

CLASS

DUCT

SEAL

CLASS

DUCT

LEAK

CLASS

DUCT

SEAL

CLASS

DUCT

LEAK

CLASS

DUCT

SEAL

CLASS

DUCT

LEAK

CLASS

DUCT

SEAL

CLASS

DUCT

LEAK

CLASS

DUCT

SEAL

CLASS

DUCT

LEAK

CLASS

INCHES OF WATER ROUND / OVAL RECT. ROUND / OVAL RECT. ROUND / OVAL RECT. ROUND / OVAL RECT.

LOCATION

DUCT PRESSURE CLASS EA/SA (2-3 IN. W.C.) EA/SA (<= 1 IN. W.C.) RA DUCT RA DUCT OA DUCT OA DUCT

DUCT TEST

PRESSURE

INCHES OF

WATER

COLUMN

REMARKS

DUCT CONSTRUCTION AND LEAKAGE TESTING TABLE

5. PROVIDE MOUNTING ACCESSORIES REQUIRED FOR LAY-IN/T-BAR INSTALLATION.

4. PROVIDE BLANKET INSULATION ON THE BACK OF ALL DIFFUSERS.

3. ALL AIR DISTRIBUTION MUST BE 100% ALUMINUM CONSTRUCTION.

2. PROVIDE WITH SQUARE TO ROUND TRANSITION AS NECESSARY.

1. VERIFY ALL CONSTRUCTION TYPES WITH ARCHITECTURAL PLANS TO DETERMINE MOUNTING DETAILS AND ACCESSORIES REQUIRED. COORDINATE COLOR WITH ARCHITECT.

REMARKS

R5 PERFORATED RETURN NA DIFFUSER 24X24 14"ø LAY-IN 425 CFM 700 CFM 30 1,2,3,4

R4 PERFORATED RETURN NA DIFFUSER 24X24 12"ø LAY-IN 300 CFM 400 CFM 30 1,2,3,4

R3 PERFORATED RETURN NA DIFFUSER 24X24 10"ø LAY-IN 200 CFM 275 CFM 30 1,2,3,4

R2 PERFORATED RETURN NA DIFFUSER 24X24 8"ø LAY-IN 100 CFM 175 CFM 30 1,2,3,4

R1 PERFORATED RETURN NA DIFFUSER 24X24 6"ø LAY-IN 0 CFM 75 CFM 30 1,2,3,4

E5 LOUVERED, 3/4" SPACING NA GRILLE 12X12 10X10 DUCT 300 CFM 300 CFM 30 1,2,3,4

E4 PERFORATED EXHAUST NA DIFFUSER 24x24 12"ø LAY-IN 300 CFM 475 CFM 30 1,2,3,4

E3 PERFORATED EXHAUST NA DIFFUSER 24x24 10"ø LAY-IN 200 CFM 275 CFM 30 1,2,3,4

E2 PERFORATED EXHAUST NA DIFFUSER 24x24 8"ø LAY-IN 100 CFM 175 CFM 30 1,2,3,4

E1 PERFORATED EXHAUST NA DIFFUSER 24x24 6"ø LAY-IN 0 CFM 75 CFM 30 1,2,3,4

S8 SQUARE PLAQUE FACE 4 WAY DIFFUSER 12x12 4"ø SEE PLANS 0 CFM 50 CFM 30 1,2,3,4

S7 ALUMINUM LOUVERED 1 WAY GRILLE 8X8 6X6 SEE PLANS 30 CFM 100 CRM 30 1,2,3,4

S5 SQUARE PLAQUE FACE 4 WAY DIFFUSER 24x24 14"ø SEE PLANS 650 CFM 750 CFM 30 1,2,3,4

S4 SQUARE PLAQUE FACE 4 WAY DIFFUSER 24x24 12"ø SEE PLANS 350 CFM 625 CFM 30 1,2,3,4

S3 SQUARE PLAQUE FACE 4 WAY DIFFUSER 24x24 10"ø SEE PLANS 225 CFM 375 CFM 30 1,2,3,4

S2 SQUARE PLAQUE FACE 4 WAY DIFFUSER 24x24 8"ø SEE PLANS 125 CFM 200 CFM 30 1,2,3,4

S1 SQUARE PLAQUE FACE 4 WAY DIFFUSER 24x24 6"ø SEE PLANS 0 CFM 100 CFM 30 1,2,3,4

MARK DESCRIPTION THROW TYPE FACE SIZE NECK SIZE MOUNT MINIMUM CFM MAXIMUM CFM MAX. NC REMARKS

AIR DISTRIBUTION SCHEDULE

SEE STRUCTURAL PLANS FOR FURTHER INFORMATION

SEISMIC DESIGN CATEGORY -

WIND EXPOSURE CATEGORY -

BUILDING RISK CATEGORY -

SEISMIC

METAL ROOF AND ALUMINUM BIRDSCREEN.

1. VENTILATOR SHALL BE SPUN ALUMINUM. PROVIDE VENTILATOR WITH MINIMUM 12" HIGH INSULATED ROOF CURB FOR

REMARKS:

RV-2 20X20 DOAS EA 30" 3015 0.10 PARALLEL 115 1

RV-1 20X20 DOAS OA 30" 4055 0.10 PARALLEL 115 1

MARK THROAT SIZE SERVICE HOOD SIZE CFM

MAX. P.D.

(IN H2O)

DAMPER TYPE WEIGHT (LBS) REMARKS

ROOF VENTILATOR SCHEDULE

2. PROVIDE WITH DOOR POSITION SWITCH OR MAGNETIC REED SWITCH, INTERLOCKED TO OPERATE IF DOOR IS OPEN.

1. PROVIDE WITH MOTOR CONTROL PANEL AND WALL MOUNTING BRACKET.

REMARKS:

AD-1 KITCHEN DOOR ENTRY MARS STD242 42" 1418 0.5 5.1 15 120/1 70 1,2

MARK AREA SERVED MANUFACTURER MODEL NO. LENGTH CFM MOTOR HP FLA MOCP VOLT/PH WEIGHT REMARKS

AIR DOOR (AD) SCHEDULE

4. INCLUDE WALL MOUNTED PROGRAMMABLE THERMOSTAT TO BE INTERFACED WITH THE BACNET MS/TP DDC CONTROL SYSTEM.

3. PROVIDE UNIT WITH WALL SLEEVE, POLYCARBONATE OR STAINLESS STEEL DRAIN PAN, CENTER HOLE CONDENSATE DRAIN KIT AND OUTDOOR GRILLE.

2. PTHP SHOULD BE CORROSION RESISTANT AND FITTED WITH A METAL LIGATURE PROOF SECURITY COVER.

1. PROVIDE PACKAGED TERMINAL HEAT PUMP WITH AUXILIARY ELECTRIC HEAT AND POWER CORD.

REMARKS:

PTHP SLEEPING ROOMS HEAT PUMP 12.0 320 9.9 350 3.0 KW 3.1 11.8 208/1 100 1,2,3,4

TOTAL MBH CFM TOTAL MBH CFM ELEC HEAT AMPS V/PH

MARK AREA SERVED TYPE

COOLING HEATING DEHUMIDIFICATION

(PINTS/HR)

ELECTRICAL OPER.WEIGHT

(LBS)

REMARKS

PTHP SCHEDULE

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

P

P I R

E V

IS

IO

N A

U G