7219262 AMENDMENT 0005.pdf
PDF 2 MB Posted
- Solicitation number
- N400857219262
About this file
This document is an Amendment (Amendment #0005) for a Navy contract (WO 7219262) to Replace HVAC Hazmat Free Issue at MAG 14, Building 149, located at Marine Corps Air Station Cherry Point, NC. The amendment is dated 08/21/2025 and addresses several pre-award Request for Information (RFI) responses regarding HVAC system demolition and replacement work.
Key details include revised contract drawings (NAVFAC DWG NO. 12913216, 12913217, 12913218) with updates to general notes and demolition plans, and clarifications on specific technical aspects such as pipe sizes, coil replacements, and roof penetrations. The proposal due date remains 26 August 2025 at 2:00PM, and contractors are instructed to submit proposals in accordance with the RFP, specifications, drawings, and all amendments. The amendment provides technical clarifications about existing system components, demolition requirements, and preparation for new HVAC installations, with an emphasis on coordinating roof and architectural work during the renovation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7219262 AMENDMENT 0004.pdf | ||
| 7219262 AMENDMENT 0003.pdf | ||
| 7219262 AMENDMENT 0002.pdf | ||
| 7219262 AMENDMENT 0001.pdf | ||
| 7219262 SpecsAsOne.pdf | ||
| 7219262 RFP.pdf | ||
| 7219262 DrawingsAsOne.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC
SPECIFICATION
7219262 Replace HVAC Hazmat
Free Issue MAG 14, Building 149
MCAS Cherry Point, NC AMENDMENT
#0005
IMPORTANT
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.
If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0005 08/21/2025 7219262
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
CG MCAS Cherry Point
FACILITIES, ROICC
B-87, 748 Roosevelt Blvd.
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
Replace HVAC Hazmat Free Issue MAG 14, Building 149
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7219262 Replace HVAC Hazmat Free Issue MAG 14, Building 149, Marine Corps Air Station Cherry Point, NC
Amendment 0005 is being issued to respond to pre-award RFI’s
The deadline to submit pre-award RFI’s has passed.
The proposal due date of 26 August 2025 at 2:00PM remains the same.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
Subj: AMENDMENT TO WO 7219262, REPLACE HVAC HAZMAT FREE ISSUE, MAG 14, BUILDING 149, MCAS CHERRY POINT NC
CONTINUATION SHEET
DOCUMENT 00 01 15
1.2 CONTRACT DRAWINGS
The following drawings are revised as of August 21, 2025:
NAVFAC DWG NO. TITLE
12913216 GENERAL NOTES
12913217 LEVEL 1 – HVAC PLAN DEMOLITION
12913218 ROOF – HVAC PLAN DEMOLITION
These drawings accompany this Amendment.
Amendment 0005 7219262 Replace HVAC Hazmat Free Issue MAG 14, Building 149
RFI Responses:
1. On page MD110 the piping shows existing ½” pipe up it is actually 2” PVC pipe up as seen in the attachments?
Response: Demo 2” PVC pipe. Reference revised NAVFAC Drawings 12913217 and 12913218.
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
2. On page MD 120 KEYNOTES #3 say to demo run-around coil, then on page MH120 it says to connect the new pipe up to EX-CC (coil number). Is EX-CC meaning existing coil or is it just a tag number or the new coil.
Response: EX-CC-# is the tag number for the new coil. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
3. On page MD120 General Sheet Note 3 say Refers to ARCH is that referring to Architectural Drawings, because there is not any Architectural Drawings included in the plans. Please advise.
Response: Reference to Architectural Drawings has been removed. Reference revised NAVFAC Drawing 12913218. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
4. On page M 002 on General Notes #3 It says use Architectural and Structural Drawing to verify the space necessary for locating piping, ductwork, and equipment. Again, there are no Architectural or Structural drawing in the set of planes that there given out.
Response: Reference to Architectural and Structural Drawings has been removed. Reference revised NAVFAC Drawing 12913216. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
Amendment 0005 7219262 Replace HVAC Hazmat Free Issue MAG 14, Building 149
RFI Responses:
1. If a fan does not require an EXP motor to meet AMCA Spark B construction, will an ODP or TEFC motor be acceptable? Specifically for the roof mounted belt drive exhaust fans where the motor is out of the airstream
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
M-002
G
EN
ER
AL
N O
TE
S
DRN
ASH
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913216
7219262
7207808
1. PROJECT SUMMARY
THE PROJECT INCLUDES THE REPLACEMENT OF THE EXHAUST AND INTAKE FANS FOR AN EXISTING WAREHOUSE. THE RENOVATION INCLUDES THE REPLACEMENT OF THE DUCTWORK AND RUN AROUND COIL
ENERGY RECOVERY SYSTEM.
2. INTENT OF THE DRAWINGS
THE DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL LOCATION OF DUCTWORK, PIPING, AND EQUIPMENT. THE DRAWINGS DO NOT SHOW EACH NECESSARY OFFSET, TRANSITION, AND ADJUSTMENT NECESSITATED BY COORDINATION WITH OTHER TRADES. THE COST OF OFFSETS, TRANSITIONS, AND ADJUSTMENTS NECESSITATED BY COORDINATION WITH OTHER TRADES MUST BE INCLUDED IN THE
CONTRACTOR'S BID.
3. COORDINATION WITH OTHER TRADES
EXAMINE AND REVIEW THE CONTRACT DOCUMENTS OF EACH DIVISION IN ORDER TO COORDINATE THE INSTALLATION OF WORK.
USE DIMENSIONED ARCHITECTURAL AND STRUCTURAL CONTRACT DRAWINGS TO VERIFY THE SPACE NECESSARY FOR LOCATING PIPING, DUCTWORK, AND EQUIPMENT. USE FIELD MEASUREMENTS TO VERIFY DIMENSIONS WHERE AREAS ARE CONGESTED, AND EXACT LOCATION IS CRITICAL TO ASSURE CORRECT INSTALLATION.
COORDINATION MUST INCLUDE, BUT MUST NOT BE LIMITED TO, VERIFYING THE LOCATION AND SIZE OF OPENINGS IN FLOORS, WALLS, PARTITIONS, CEILINGS, AND ROOFS WITH THE INSTALLING TRADES;
ALLOCATION OF SPACE WITH OTHER TRADES INSTALLING WORK IN CHASES, CEILING INTERSTITIAL SPACES, AND EQUIPMENT SPACES; AND THE PHASING OF INSTALLATION WORK WITH THAT OF OTHER TRADES.
WHERE A PRODUCT IS SUBMITTED THAT IS NOT THE BASIS OF DESIGN (WHETHER STATED IN THE DOCUMENTS OR NOT), COORDINATE THE DIFFERENCES IN THE PRODUCT THAT IMPACT OTHER TRADES WITH THE AFFECTED TRADES. THE COST IMPACT ON OTHER TRADES RESULTING FROM A PRODUCT SUBMITTAL THAT IS NOT THE BASIS OF DESIGN MUST BE INCLUDED IN THE CONTRACTOR'S PRICE AND MUST NOT BE
PASSED ON TO THE OWNER.
4. WORKMANSHIP
PERFORM WORK IN A WORKMANLIKE MANNER TO PROVIDE A FIRST CLASS COMPLETE INSTALLATION. REMOVE, CORRECT AND REPLACE WORK DEEMED UNACCEPTABLE AT THE DISCRETION OF THE
ARCHITECT/ENGINEER.
5. EXISTING WORK
EXISTING WORK TO REMAIN IS SHOWN ON DRAWINGS AS SOLID, LIGHT LINES; EXISTING WORK THAT MUST BE REMOVED IS SHOWN AS HEAVY DASHED LINES.
THE EXTENT OF DEMOLITION REQUIRED IS SHOWN ON DRAWINGS AS A GENERAL GUIDE. ADDITIONAL DEMOLITION MAY BE REQUIRED.
SCHEDULE AND COORDINATE TEMPORARY OR PERMANENT SHUTDOWNS OF EXISTING SYSTEMS OR PORTIONS THEREOF IN ADVANCE, AND INITIATE SHUTDOWN ONLY WITH THE CONCURRENCE OF THE OWNER.
ARRANGE DEMOLITION OF EXISTING WORK, CONNECTIONS TO, OR MODIFICATION OF EXISTING WORK TO KEEP THE NUMBER OF SHUTDOWNS TO A MINIMUM, AND MINIMIZE THE DURATION OF EACH SHUTDOWN.
SCHEDULE SHUTDOWNS FOR NIGHTS OR WEEKENDS, UNLESS APPROVED OTHERWISE BY ARCHITECT/ENGINEER AND OWNERS REPRESENTATIVE.
EXISTING DUCTWORK AND PIPING LOCATIONS AND SIZES SHOWN ARE APPROXIMATE, ARE SHOWN FOR REFERENCE ONLY, AND ARE NOT INTENDED AS EXACT. FIELD VERIFY EXISTING SIZES AND LOCATIONS PRIOR
TO FABRICATING CONSTRUCTION WORK.
REMOVE EXISTING CONTROLS AND WIRING NOT BEING REUSED. CAP TUBING NOT REMOVED AIRTIGHT.
REMOVE EQUIPMENT, DUCTWORK, PIPING, ETC. INDICATED TO BE DEMOLISHED FROM THE SITE UNLESS NOTED OTHERWISE. DISPOSE OF MATERIALS PROPERLY.
REPAIR DAMAGED FINISHES, SURFACES, ETC. TO PROVIDE A POLISHED APPEARANCE.
6. EQUIPMENT
WHERE ROOM THERMOSTATS ARE SHOWN LOCATED ON PERIMETER WALLS, PROVIDE THE THERMOSTAT WITH AN INSULATED BASE. PROVIDE WALL-MOUNTED THERMOSTATS, SENSORS, AND DEVICES NO HIGHER THAN 48" ABOVE FINISHED FLOOR TO COMPLY WITH ADA STANDARDS FOR ACCESSIBLE DESIGN.
PROVIDE EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS, SPECIFICATION SECTIONS 23 30 00 AND APPROVED SHOP DRAWINGS.
MAINTAIN SERVICE AND OPERATING CLEARANCES AROUND EACH SIDE OF EACH PIECE OF EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S PRINTED REQUIREMENTS AND RECOMMENDATIONS.
7. DUCTWORK
DUCTWORK SIZES INDICATED ON CONTRACT DOCUMENTS ARE CLEAR, INSIDE DIMENSIONS WITH NO LINER.
PROVIDE DUCTWORK IN ACCORDANCE WITH THE SPECIFICATION SECTION 23 31 13.00 40, PLANS, DETAILS, AND THE DUCT CONSTRUCTION AND INSULATION SCHEDULE.
PROVIDE ACCESS DOORS IN DUCTWORK FOR DAMPERS AND CONTROL DEVICES. PROVIDE ACCESS DOORS SIZED AND LOCATED FOR INSPECTION, MAINTENANCE, CLEANING, AND ADJUSTMENT OR PER THE
MANUFACTURER'S PRINTED REQUIREMENTS AND RECOMMENDATIONS.
PROVIDE SQUARE, 90° DUCT ELBOWS WITH SINGLE THICKNESS TURNING VANES SPACED 1-1/2" APART WHETHER SHOWN ON PLANS OR NOT UNLESS SPECIFICALLY NOTED OTHERWISE.
8. PIPING
PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN THE SYSTEM AND DRAIN VALVES AT ALL LOW POINTS IN THE SYSTEM.
MINIMUM PIPE SIZE MUST BE 3/4".
PROVIDE PIPING IN ACCORDANCE WITH THE SPECIFICATIONS, THE PIPING PLANS AND DETAILS, AND THE PIPE INSULATION SCHEDULE.
PIPING SCHEMATICS AND DIAGRAMS SHOW ONLY THE BASIC FLOW PATTERN AND EQUIPMENT ARRANGEMENT, AND DO NOT SHOW EVERY INSTANCE OF EQUIPMENT CONNECTED TO THE SYSTEM. REFER TO THE
PLANS, SECTIONS AND DETAILS FOR DETAILED SYSTEM LAYOUT.
ELBOWS MUST BE LONG RADIUS UNLESS OTHERWISE NOTED.
PIPING SYSTEMS MUST BE LABELED PER ASME A13.1. COLOR SCHEME IS WHITE LETTERS ON GREEN BACKGROUND.
GENERAL NOTES
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
01/16/201704/28/2025
REVISED 8/21/25
nicholas.a.hall Cross-Out
A
1/2"ERS
1/2"ERS
1/2"ERS
1/2"ERS
1/2"ERR
NIC
3 3 3
3 3 3
1/2"ERS
1/2"ERR
1/2"ERR
1/2"ERR
1/2"ERS
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E)RAD-1
(E)RAD-1
(E)RAD-1
(E)RAD-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E)RAD-1
(E)RAD-1
(E )R
AD
-1
(E)RAD-2
(E )R
AD
-2
(E )R
AD
-1
(E)RAD-2
(E)RAD-2 (E)RAD-2
(E)RAD-2
(E)RAD-2 (E)RAD-2
(E )R
AD
-2
(E)RAD-2
(E)RAD-2
(E )R
AD
-2
(E)RAD-2 (E)RAD-2 (E
)R
AD
-2
(E)RAD-2
(E)RAD-2
1/2" UP 1/2" UP
1/2" UP 1/2" UP
1/2" UP
1/2" UP
1/2" UP
1/2" UP
1/2" UP
1/2" UP(E)16x16 (E)14x16
(E)14x16 (E)22x22
20x16 EA UP
(E)24x22
(E)24x22
(E)24x24
(E)16x16
(E)14x16
THRU ROOF THRU ROOF THRU ROOF
UP THRU
20x16 EA UP
20x16 EA UP
20x16 EA UP
(E)22x20(E)24x24
(E)24x24
THRU ROOF
THRU ROOF THRU ROOF
THRU ROOFTHRU ROOFTHRU ROOF
THRU ROOF THRU ROOF
THRU ROOF THRU ROOF
1/2"ERS
1/2"ERR
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
D101
OXIDIZERS
C101
CORROSIVES
B110
HOLDING AREA
A101
FLAMABLES
J101
BATTERY ACID
I101
ARGON/FREON
H101
ACETYLINE/PROPANE
G101
FLAMMABLE LIQUIDS
F101
HELIUM/OXYGEN
E101
OXYGEN
38x36
(E)
(E)
(E)
(E)
38x36
EA UP
EA UP
EA UPEA UP
EA UPEA UP
38x36
38x3638x36
38x36
EA
EA UPEA UPEA UP ROOF
EA EA
UP THRU UP THRU
ROOF ROOF
PLAN
NORTH
GRAPHIC SCALE:
16' 08' 32' 48'16'
1/16"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
MD110
LE
VE
L
-H
VA
C P
LA
N
DE
M
O
LI
TI
O
N
DRN
ASH
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913217
7219262
7207808
SHEET KEYNOTES
1 DEMOLISH INTAKE FAN AND ASSOCIATED MOUNTS, COILS,
AND CONTROLS. PREPARE WALL OPENING FOR
INSTALLATION OF NEW DUCTWORK AND ASSOCIATED
FANS.
2 DEMOLISH RUN-AROUND PUMP, PIPING, CONTROLS, AND
ALL ASSOCIATED ACCESSORIES.
3 EXISTING INTAKE LOUVERS TO REMAIN.
4 DEMOLISH PIPE UP THRU ROOF. PREPARE OPENING FOR
REUSE UNDER NEW WORK.
GENERAL SHEET NOTES
1 REUSE EXISTING PIPE HANGERS AS APPLICABLE.
2 REUSE EXISTING ROOF OPENINGS AND ROOF PIPE
PENETRATIONS.
3 ALL FINNED TUBED RADIATORS AND ASSOCIATED STEAM
PIPING ARE EXISTING TO REMAIN.
SCALE: 1/16" = 1'-0"
LEVEL 1 - HVAC PLAN DEMOLITION
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
01/16/201704/28/2025
2"
2"
2"
2"
2"
2"
2" 2"
2" 2"
2" 2"
2"
2"
2"
2"
2"2"
2" 2"
2"
2"
REVISED 8/21/25
nicholas.a.hall Inserted Text
REVISED 8/21/25
nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out
A
20x16
20x26
18Ø
16x16 30x30
20x16
20x26 30x30 16x16
18Ø
20x16
20x26 30x30 16x16
18Ø
20x16
20x26
18Ø
30x30 16x16
15Ø 30x30 16x1618Ø
30x30 16x1618Ø
30x30 16x16
18Ø 30x30 16x16
30x30 16x16 18Ø 18Ø
30x30 16x16
18Ø10Ø10Ø
10Ø10Ø10Ø
16x16 EA DN 14x16 EA DN 14x16 EA DN 22x22 EA DN
24x24 EA DN 24x22 EA DN
24x22 EA DN
2 3
2 3
2 3
2 3
1 21 21 2 1 21 212
1/2" DN
1/2" DN
1/2" DN
1/2" DN
1/2" DN1/2" DN
1/2" DN
1/2" DN
1/2" DN1/2" DN
20x16 EA DN
20x16 EA DN
20x16 EA DN
20x16 EA DN
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
22x20 EA DN24x24 EA DN
24x24 EA DN
THRU ROOF THRU ROOF
THRU ROOF THRU ROOF THRU ROOF
THRU ROOF
16x16 EA DN 14x16 EA DN
THRU ROOF THRU ROOF THRU ROOF THRU ROOF THRU ROOF THRU ROOF
PLAN
NORTH
GRAPHIC SCALE:
16' 08' 32' 48'16'
1/16"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
MD120
RO
O
F -H
VA
C
PL
AN
D
EM
O
LI
TI
O
N
DRN
ASH
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913218
7219262
7207808
GENERAL SHEET NOTES
1 REUSE EXISTING ROOF CURBS FOR FAN MOUNTING, ROOF
DUCT PENETRATIONS AND ROOF PIPE PENETRATIONS.
2 REUSE EXISTING DUCT SUPPORTS.
3 REPAIR ROOF AS REQUIRED DUE TO DEMOLITION AND
REFER TO ARCH.
SCALE: 1/16" = 1'-0"
ROOF - HVAC PLAN DEMOLITION
SHEET KEYNOTES
1 DEMOLISH EXHAUST FAN AND ASSOCIATED DUCTWORK.
2 EXISTING ROOF OPENING AND CURB TO REMAIN. PREPARE
OPENING FOR INSTALLATION OF NEW DUCTWORK. REFER
TO NEW WORK PLANS FOR ADDITIONAL INFORMATION.
REFER AND COORDINATE ROOF WORK WITH ARCH.
3 DEMOLISH RUN-AROUND COIL AND ASSOCIATED PIPING.
4 DEMOLISH PIPING DOWN THRU ROOF. PROTECT AND
PREPARE PENETRATION FOR NEW PIPING INSTALLED
UNDER NEW WORK. REFER AND COORDINATE ROOF WORK
WITH ARCH. SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
01/16/201704/28/2025
2"
2"
2"
2"
2"2"
2"
2"
2" 2"
REVISED 8/21/25
nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out nicholas.a.hall Cross-Out