7219262 DrawingsAsOne.pdf
PDF 2 MB Posted
- Solicitation number
- N400857219262
About this file
These are comprehensive engineering design drawings for a Naval Facilities Engineering Command (NAVFAC) project to replace HVAC systems and perform hazardous material issue mitigation at Building 149 located at Marine Air Corps Station (MCAS) Cherry Point, North Carolina. The 23-page drawing set, dated 04/28/2025, includes detailed mechanical, electrical, fire alarm, and demolition plans for an energy recovery system involving multiple supply and exhaust fans, pumps, and associated ductwork and piping. The project involves replacing existing equipment across multiple areas including rooms labeled for various hazardous material storage (such as oxidizers, corrosives, flammable liquids), with specific focus on energy recovery systems utilizing propylene glycol-based heat exchange. The drawings provide extensive technical specifications, equipment schedules, riser diagrams, and installation details, indicating a comprehensive renovation of the facility's HVAC infrastructure with careful consideration for safety and operational requirements in a potentially hazardous environment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7219262 AMENDMENT 0005.pdf | ||
| 7219262 AMENDMENT 0004.pdf | ||
| 7219262 AMENDMENT 0003.pdf | ||
| 7219262 AMENDMENT 0002.pdf | ||
| 7219262 AMENDMENT 0001.pdf | ||
| 7219262 SpecsAsOne.pdf | ||
| 7219262 RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 149
MAIN GATE
BUILDING 87
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
G-001
CO
VE
R
SH
EE
T
SB
SB SB
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
04/28/2025
REPLACE HVAC, HAZMAT/ISSUE
MAG14, B149
MCAS CHERRY POINT, NC
FINAL SUBMITTAL
CONSTRUCTION WO:7219262
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913210
7219262
7207808
LOCATION MAP
SHEET LIST
NAVFAC NO. SHEET NUMBER SHEET NAME
GENERAL
12913210 G-001 COVER SHEET
FIRE ALARM
12913211 FA001 ABBREVIATIONS, LEGEND AND GENERAL NOTES
12913212 FA002 SPECIFICATION
12913213 FA110 GRADE - FIRE ALARM PLAN
12913214 FA501 DETAILS
MECHANICAL
12913215 M-001 ABBREVIATIONS AND LEGEND
12913216 M-002 GENERAL NOTES
12913217 MD110 LEVEL 1 - HVAC PLAN DEMOLITION
12913218 MD120 ROOF - HVAC PLAN DEMOLITION
12913219 MH110 LEVEL 1 - HVAC PLAN
12913220 MH120 ROOF - HVAC PLAN
12913221 M-501 DETAILS
12913222 M-502 DETAILS
12913223 M-601 SCHEDULES
12913224 M-701 CONTROLS
ELECTRICAL
12913225 E-001 LEGEND
12913226 E-002 GENERAL NOTES
12913227 ED110 LEVEL 1 - DEMOLITION PLAN
12913228 ED120 ROOF PLAN - DEMOLITION
12913229 EP110 LEVEL 1 - POWER PLAN
12913230 EP120 ROOF PLAN
12913231 EP601 RISER DIAGRAM
12913232 EP701 SCHEDULES
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
SEAL
01/16/201704/28/2025
ADDRESSABLE INPUT MODULE (AIM)AIM
VISUAL NOTIFICATION APPLIANCE, CEILING MOUNTED (CANDELA AS NOTED)
MANUAL FIRE ALARM BOX
AUDIBLE NOTIFICATION APPLIANCE, CEILING MOUNTED
F
NOTE:ALL THE SYMBOLS IN THE LEGEND MAY NOT HAVE BEEN
USED ON THE PLANS. SYMBOLS NOT LISTED IN THE LEGEND
ARE IDENTIFIED WHERE THEY OCCUR.
SUBSCRIPT: EXISTING DEVICE TO REMAINE
1. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF SYSTEM
REQUIREMENTS WITH ALL CONDITIONS OF THE BUILDING AND SITE INCLUDING,
BUT NOT LIMITED TO, BLIND SPACES, SHELVING, LIGHTS, GRILLES AND
DIFFUSERS, PIPING, DUCT WORK, DOORS, WINDOWS, EQUIPMENT PLATFORMS,
WALLS (FIRE RATED AND NON-FIRE-RATED), BEAMS, JOISTS, COLUMNS, HVAC
EQUIPMENT, ELECTRICAL PANELS AND EQUIPMENT, CEILINGS, AREAS WITHOUT
CEILINGS, WALL CONSTRUCTION, FLOORS AND ALL CONSTRUCTION,
EQUIPMENT AND BUILDING APPURTENANCES.
2. SLC, IDC, AND NAC CIRCUIT CONFIGURATIONS MUST COMPLY WITH NFPA 72
REQUIREMENTS FOR CLASS B CIRCUITS. END-OF-LINE DEVICES ARE NOT
SHOWN AND MUST BE PROVIDED AS REQUIRED BY THE SYSTEM
MANUFACTURER.
3. ALL WIRES MUST BE CHECKED FOR GROUNDS, SHORTS, OPENS, AND CORRECT
RESISTANCE, CAPACITANCE, AND OTHER APPLICABLE PARAMETERS PRIOR TO
INSTALLATION OF DEVICES AND PRIOR TO TERMINATION OF THE CIRCUITS AT
THE FACU OR SUBPANELS.
4. ALL WIRING MUST BE IN METALLIC CONDUIT. ALL CONDUIT MUST BE 3/4-IN.
MINIMUM. IDENTIFY ALL CONDUCTORS INDIVIDUALLY WITH PERMANENT
MARKINGS. IN UNFINISHED AREAS PAINT ALL FIRE ALARM JUNCTION BOXES AND
COVERS RED; IN FINISHED AREAS FIRE ALARM JUNCTION BOXES AND COVERS
MUST BE PAINTED RED OR PAINTED TO MATCH THE ROOM FINISH WITH THE
INSIDE COVER OF THE JUNCTION BOX IDENTIFIED AS "FIRE ALARM".
5. PULL ALL CONDUCTORS SPLICE FREE. THE USE OF WIRE NUTS, CRIMPED
CONNECTORS, OR TWISTING OF CONDUCTORS IS PROHIBITED. ALL
TERMINATIONS MUST BE AT A TERMINAL STRIP OR DEVICE SCREW TERMINAL.
RUN ALL WIRING TO CONTROL PANELS AND OTHER CABINETS IN THE VERTICAL
OR HORIZONTAL PLANE, MAKE ALL TURNS AT 90-DEGREE ANGLES, AND TIGHTLY
BUNDLE AND WRAP ALL WIRE. WIRING MAY BE SOLID COPPER OR STRANDED
WE PERMITTED BY NFPA 70. SLC MUST BE MINIMUM 18 AWG; IDC AND NAC
MUST BE MINIMUM 16- AWG. UNDER NO CIRCUMSTANCES MUST CONDUCTORS
BE SIZED SMALLER THAN THE MANUFACTURER'S REQUIREMENTS.
6. ALL DEVICES MUST HAVE SCREW TERMINALS. WHERE DEVICES ARE ONLY
PROVIDED WITH PIGTAILS FROM THE MANUFACTURER, PIGTAILS MUST BE
LANDED ON TERMINAL STRIPS MOUNTED WITHIN THE JUNCTION BOX. ALL
TERMINATIONS MUST BE AT A TERMINAL STRIP OR THE DEVICE SCREW
TERMINALS. TERMINAL STRIPS ARE ONLY PERMITTED WHERE DIRECT
CONNECTION TO A DEVICE IS NOT POSSIBLE
7. FIRE ALARM SYSTEM INPUT (MONITOR) AND OUTPUT (CONTROL) MODULES
MUST BE LOCATED WITHIN 3 FT. OF THE MONITORED / CONTROLLED EQUIPMENT
WHERE POSSIBLE.
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
FA001
AB
BR
EV
IA
TI
O
NS
, L
EG
EN
D
AN
D G
EN
ER
AL
N
O
TE
S
JCW
AMG AMG
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913211
7219262
7207808
ABV ABOVE
AC ALTERNATING CURRENT
ACU AUTONOMOUS CONTROL UNIT
AED AUTOMATIC EXTERNAL DEFIBRILLATOR
AFF ABOVE FINISHED FLOOR
AIM ADDRESSABLE INPUT (MONITOR) MODULE
AMP AMPERE(S)
AOM ADDRESSABLE OUTPUT (CONTROL) MODULE
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
BEL BELOW
BLDG BUILDING
CD CANDELA
CF CUBIC FOOT (FEET)
CKT CIRCUIT
CM CUBIC METER(S)
CONT CONTINUED
COR CONTRACTING OFFICER'S REPRESENTATIVE
CU COPPER
DC DIRECT CURRENT
DN DOWN
DPDT DOUBLE POLE DOUBLE THROW
DWG DRAWING
ELEC ELECTRIC OR ELECTRICAL
EMCS EMERGENCY MANAGEMENT CONTROL SYSTEM
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FACU FIRE ALARM CONTROL UNIT
FAS FIRE ALARM SYSTEM
FATC FIRE ALARM TERMINAL CABINET
FM FM GLOBAL (FACTORY MUTUAL)
FT FOOT (FEET)
GND GROUND
HZ HERTZ
IBC INTERNATIONAL BUILDING CODE
IDC INITIATING DEVICE CIRCUIT
IFC INTERNATIONAL FIRE CODE
IN INCH(ES)
LCD LIQUID CRYSTAL DISPLAY
LVP LOW VOLTAGE POWER
M METER(S)
MFCU MAIN FIRE ALARM CONTROL UNIT
mm MILLIMETER(S)
MNS MASS NOTIFICATION SYSTEM
NAC NOTIFICATION APPLIANCE CIRCUIT
NEC NATIONAL ELECTRICAL CODE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
PRNT PRINTER
RAT RADIO ALARM TRANSMITTER
RFCP REMOTE FIRE ALARM CONTROL PANEL
RFCU REMOTE FIRE ALARM CONTROL UNIT
RM ROOM
SF SQUARE FOOT (FEET)
SFCP SUB FIRE ALARM CONTROL PANEL
SFCU SUB FIRE ALARM CONTROL UNIT
SLC SIGNALING LINE CIRCUIT
SM SQUARE METER(S)
SPD SURGE PROTECTIVE DEVICE
TS TAMPER SWITCH (VALVE)
U/F UNDERFLOOR
UG UNDERGROUND
UL UNDERWRITERS' LABORATORIES
UNO UNLESS NOTED OTHERWISE
UTP UNSHIELDED TWISTED PAIR
V VOLT(S)
VAC VOLTS - ALTERNATING CURRENT
VDC VOLTS - DIRECT CURRENT
W WATT(S)
W/ WITH
W/O WITHOUT
WF WATERFLOW (ALARM) SWITCH
WP WEATHERPROOF (WEATHER RATED)
*NOTE NOT ALL ABBREVIATIONS MAY BE USED
ABBREVIATIONS LEGEND GENERAL NOTES
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
04/28/2025
PART 1 GENERAL
1.1 SUMMARY
1.1.1 Scope
a. This work includes providing a new addressable input module to monitor a HVAC current sensor to confirm operation of exhaust fan. Include system wiring, raceway, pull boxes, and any items required for a operational system even though each item is not specifically mentioned or described. Existing interior fire alarm system is Simplex 4100ES.
b. Provide equipment, materials, installation, workmanship, inspection, and testing in strict accordance with NFPA 72, except as modified herein. The system layout on the drawings show the intent of the suggested location. Final system layout, and coordination are the responsibility of the Contractor.
1.1.2 Qualified Fire Protection Engineer (QFPE)
Services of the QFPE must include:
a. Reviewing SD-02 and SD-03 submittal packages for completeness and compliance with the provisions of this specification. Construction (shop) drawings must be prepared by, or prepared under the immediate supervision of, the QFPE. The QFPE must affix their professional engineering stamp with signature to the shop drawings and material data sheets, indicating approval prior to submitting the shop drawings to the DFPE.
b. Providing a letter documenting that the SD-02 and SD-03 submittal package has been reviewed and noting any outstanding comments.
c. Witnessing pre-Government and final Government functional performance testing and performing a final installation review.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification.Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Shop drawings (SD-02) and product data (SD-03) must be prepared by the fire alarm designer and combined and submitted as one complete package. The QFPE must review the SD-02/SD-03 submittal package for completeness and compliance with the Contract provisions prior to submission to the Government. The QFPE must provide a Letter of Confirmation that they have reviewed the submittal package for compliance with the contract provisions. This letter must include their registered professional engineer stamp and signature. Partial submittals and submittals not reviewed by the QFPE will be returned by the Government disapproved without review.
Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals SD-02 Shop Drawings SD-03 Product Data Qualified Fire Protection Engineer (QFPE); G Wiring Diagrams; G Addressable Interface Devices; G Fire alarm system designer; G Initiating devices; G Alarm Wiring; G Supervisor; G Back Boxes and Conduit; G Technician; G Installer; G Test Technician; G
SD-06 Test Reports SD-07 Certificates SD-11 Closeout Submittals Test Procedures; G Verification of Compliant Installation; G As Built Drawings
Request for Government Final Test; G
1.2.1 Alarm Initiating Devices
a. Connect alarm initiating devices to initiating device circuits (IDC) Class "B", or to signaling line circuits (SLC) Class "A" and installed in accordance with NFPA 72.
1.3 QUALITY ASSURANCE
1.3.1 Submittal Documents
1.3.1.1Preconstruction Submittals Within 36 days of contract award but not less than 14 days prior to commencing any work on site, the Contractor must submit the following for review and approval. SD-02 and SD-03 submittals received prior to the review and approval of the qualifications of the fire alarm subcontractor and QFPE must be returned disapproved without review. All resultant delays must be the sole responsibility of the Contractor.
1.3.1.2Shop Drawings Shop drawings must not be smaller than the Contract Drawings. Drawings must comply with the requirements of NFPA 72 and NFPA 170. Minimum scale for floor plans must be 1/8"=1'.
1.3.1.3Wiring Diagrams Three copies of point-to-point wiring diagrams showing the points of connection and terminals used for electrical field connections in the system, including interconnections between the equipment or systems that are supervised or controlled by the system.
1.3.1.4System Layout Three copies of plan view drawing showing device locations, terminal cabinet locations, junction boxes, other related equipment, conduit routing, conduit sizes, wire counts, conduit fill calculations, wire color-coding, circuit identification in each conduit, and circuit layout. Indicate the addresses of all devices.
Provide a complete description of the system operation in matrix format similar to the "Typical Input/Output Matrix" included in the Annex of NFPA 72.
1.3.1.5Product Data Three copies of annotated descriptive data to show the specific model, type, and size of each item. Catalog cuts must also indicate the NRTL listing. The data must be highlighted to show model, size, and options that are intended for consideration. Data must be adequate to demonstrate compliance with all contract requirements. Product data for all equipment must be combined into a single submittal. Provide an equipment list identifying the type, quantity, make, and model number of the equipment to be provided under this submittal.
1.3.1.6As-Built Drawings The drawings must show the system as installed, including deviations from both the project drawings and the approved shop drawings. These drawings must be submitted within two weeks after the final Government test of the system. At least one set of the as-built (marked-up) drawings must be provided at the time of, or prior to the final Government test.
1.3.2 Qualifications
1.3.2.1Fire Alarm System Designer The fire alarm system designer must be certified as a Level III (minimum) Technician by National Institute for Certification in Engineering Technologies (NICET) in the Fire Alarm Systems subfield of Fire Protection Engineering Technology or meet the qualifications for a QFPE.
1.3.2.2Supervisor A NICET Level III or IV fire alarm technician must supervise the installation of the fire alarm/mass notification system. A fire alarm technician with a minimum of eight years of experience must supervise the installation of the fire alarm/mass notification system. The fire alarm technicians supervising the installation of equipment must be factory trained in the installation, adjustment, testing, and operation of the equipment specified herein and on the drawings.
1.3.2.3Technician Fire alarm technicians with a minimum of four years of experience must be utilized to install and terminate fire alarm/mass notification devices, cabinets and control units. The fire alarm technicians installing the equipment must be factory trained in the installation, adjustment, testing, and operation of the equipment specified herein and on the drawings.
1.3.2.4Installer Fire alarm installer with a minimum of two years of experience utilized to assist in the installation of fire alarm/mass notification devices, cabinets and control units. A licensed electrician must be allowed to install wire, cable, conduit and backboxes for the fire alarm system/mass notification system. The fire alarm installer must be factory trained in the installation, adjustment, testing, and operation of the equipment specified herein and on the drawings.
1.3.2.5Test Technician Fire alarm technicians with a minimum of eight years of experience and NICET Level III or IV utilized in testing and certification of the installation of the fire alarm/mass notification devices, cabinets and control units. The fire alarm technicians testing the equipment must be factory trained in the installation, adjustment, testing, and operation of the equipment installed as part of this project.
1.3.2.6Manufacturer Components must be of current design and must be in regular and recurrent production at the time of installation. Provide design, materials, and devices for a protected premises fire alarm system, complete, conforming to NFPA 72, except as specified herein.
PART 2 PRODUCTS
2.1 GENERAL PRODUCT REQUIREMENT
All fire alarm equipment must be listed for use under the applicable reference standards.
2.2 MATERIALS AND EQUIPMENT
2.2.1 Standard Products
Provide materials, equipment, and devices that that are compatible with existing fire alarm system.
2.3 ADDRESSABLE INTERFACE DEVICES
The initiating device being monitored must be configured as a Class “B” initiating device circuit. The module must be listed as compatible with the control unit. The module must provide address setting means compatible with the control unit's SLC supervision and store an internal identifying code. Monitor module must contain an integral LED that flashes each time the monitor module is polled and is visible through the device cover plate. Modules must be listed for the environmental conditions in which they will be installed.
2.4 WIRING
Provide wiring materials under this section with the additions and modifications specified herein.
2.4.1 Alarm Wiring
IDC and SLC wiring must be solid copper cable in accordance with the manufacturer’s requirements. Copper signaling line circuits and initiating device circuit field wiring must be No. 18 AWG size conductors at a minimum. Circuits operating at 24 VDC must not operate at less than the listed voltages for the detectors and/or appliances. Acceptable power-limited cables are FPL, FPLR or FPLP as appropriate with red colored covering. Nonpower-limited cables must comply with NFPA 70.
PART 3 EXECUTION
3.1 VERIFYING ACTUAL FIELD CONDITIONS
Before commencing work, examine all adjoining work on which the contractor's work is in any way dependent for perfect workmanship according to the intent of this specification section, and report to the Contracting Officer's Representative any condition which prevents performance of first-class work. No "waiver of responsibility" for incomplete, inadequate or defective adjoining work will be considered unless notice has been filed before submittal of a proposal.
3.2 SYSTEM FIELD WIRING
3.2.1 Wiring within Cabinets, Enclosures, and Boxes
Provide wiring installed in a neat and workmanlike manner and installed parallel with or at right angles to the sides and back of any box, enclosure, or cabinet. Conductors that are terminated, spliced, or otherwise interrupted in any enclosure, cabinet, mounting, or junction box must be connected to screw-type terminal blocks. Mark each terminal in accordance with the wiring diagrams of the system. The use of wire nuts or similar devices is prohibited. Wiring to conform with NFPA 70.
Indicate the following in the wiring diagrams:
a. Point-to-point wiring diagrams showing the points of connection and terminals used for electrical field connections in the system, including interconnections between the equipment or systems that are supervised or controlled by the system.
3.2.2 Alarm Wiring
a. Voltages must not be mixed in any junction box, housing or device, except those containing power supplies and control relays.
b. Pigtail or T-tap connections to signal line circuits, initiating device circuits are prohibited.
c. Pull all conductors splice free. The use of wire nuts, crimped connectors, or twisting of conductors is prohibited. Where splices are unavoidable, the location of the junction box or pull box where they occur must be identified on the as-built drawings. The number and location of splices must be subject to approval by the Designated Fire Protection Engineer (DFPE).
3.2.3 Back Boxes and Conduit
Provide all wiring in rigid metal conduit, electrical metallic tubing (EMT) or intermediate metal conduit unless specifically indicated otherwise. Minimum conduit size must be 3/4-inch in diameter. Do not use electrical non-metallic tubing (ENT) or flexible non-metallic tubing and associated fittings.
a. For rigid metallic conduit (RMC), only threaded type fitting are permitted for wet or damp locations.
3.3 FIRESTOPPING
Provide firestopping for holes at conduit penetrations through floor slabs, fire-rated walls, partitions with fire-rated doors, corridor walls, and vertical service.
3.4 PAINTING
a. In unfinished areas paint all exposed electrical conduit (serving fire alarm equipment), fire alarm conduit, surface metal raceway, junction boxes and covers red. In lieu of painting conduit, the contractor may utilize red conduit with a factory applied finish.
3.5 FIELD QUALITY CONTROL
3.5.1 Test Procedures
Submit detailed test procedures, prepared and signed by the NICET Level III or IV Fire Alarm Technician, and the representative of the installing company, and reviewed by the QFPE 60 days prior to performing system tests. Detailed test procedures must list all components of the installed system. Test procedures must include sequence of testing, time estimate for each test, and sample test data forms. The test data forms must be in a check-off format (pass/fail with space to add applicable test data; similar to the forms in NFPA 72 and NFPA 4.) The test procedures and accompanying test data forms must be used for the pre-Government testing and the Government testing. The test data forms must record the test results and must:
a. Identify the NFPA Class of all Initiating Device Circuits (IDC) and Signaling Line Circuits (SLC).
b. Identify each test required by NFPA 72 Test Methods and required test herein to be performed on each component and describe how these tests must be performed.
c. Identify each component and circuit as to type, location within the facility, and unique identity within the installed system. Provide necessary floor plan sheet showing each component location, test location, and alphanumeric identity.
d. Identify all test equipment and personnel required to perform each test.
e. Provide space to identify the date and time of each test. Provide space to identify the names and signatures of the individuals conducting and witnessing each test.
3.6 MINIMUM SYSTEM TESTS
3.6.1 System Tests
Test the system in accordance with the procedures outlined in NFPA 72. The required tests are as follows:
a. Verify the absence of unwanted voltages between circuit conductors and ground. The tests must be accomplished at the pre-Government test with results available at the final system test.
b. Test each initiating device and circuit for proper operation and response at the control unit. If there is a failure at these devices, then supervision must be tested at each device.
c. Visually inspect wiring.
d. Verify that red-line drawings are accurate.
3.7 SYSTEM ACCEPTANCE
Following acceptance of the system, as-built drawings and O&M manuals must be delivered to the Contracting Officer for review and acceptance. The drawings must show the system as installed, including deviations from both the project drawings and the approved shop drawings. These drawings must be submitted within two weeks after the final Government test of the system.
a. The drawings must be prepared electronically and sized no less than the contract drawings. Furnish one set of CDs or DVDs containing software back-up and CAD based drawings in latest version of AutoCAD, DXF and portable document formats of as-built drawings and schematics.
b. Include complete wiring diagrams showing connections between devices and equipment, both factory and field wired.
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
FA002
SP
EC
IF
IC
AT
IO
N
JCW
AMG AMG
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913212
7219262
7207808
FIRE ALARM SPECIFICATION FIRE ALARM SPECIFICATION CONT.
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
F
F
AI
M
A
E
E
E
E
NOT IN CONTRACT
NOT IN CONTRACT
E101
OXYGEN
PLAN
NORTH
GRAPHIC SCALE:
16' 08' 32' 48'16'
1/16"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
FA110
G
RA
DE
FI
RE
A
LA
RM
P
LA
N
JCW
AMG AMG
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913213
7219262
7207808
SCALE: 1/16" = 1'-0"
FIRE ALARM PLAN
SHEET KEYNOTES
1 PROVIDE ADDRESSABLE INPUT MODULE TO MONITOR
HVAC CURRENT SENSOR. SENSOR PROVIDED BY HVAC
CONTRACTOR, SEE MECHANICAL DRAWINGS FOR
COORDINATION.
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
MANUAL FIRE ALARM BOX
SPOT-TYPE SMOKE DETECTOR
WET PIPE SPRINKLER WATERFLOW SWITCH
LOW TEMPERATURE SENSOR
SYSTEM INPUTS
X X
X X
X X
D
IS
P
LA
Y
AL
PH
AN
U M
ER
IC
M
ES
SA
G
E O
N F
AC
U
A B C D E F G H I J K L M N O P
AC
TU
AT
E
C O
M M
O N
A U
D
IB
LE
/V
IS
IB
LE
A
LA
R
M
IN
D
IC
AT
O
R S
O N
F
AC
U
AC
TU
AT
E C
O M
M O
N A
U D
IB
LE
/V
IS
IB
LE
S U
PE
R
VI
SO
R Y
IN
D
IC
AT
O R
S O
N F
AC
U
AC
TU
AT
E
C O
M M
O N
A U
D
IB
LE
/V
IS
IB
LE
T
R O
U
BL
E
IN
D
IC
AT
O
R S
O N
F
AC
U
TR
AN
SM
IT
A
LA
R
M S
IG
N
AL
T
O S
U
PE
R
VI
SI
N
G S
TA
TI
O N
TR
A
N
SM
IT
G
E N
ER
AL
S U
PE
R
VI
SO
R Y
SI
G
N
AL
T O
S U
PE
R
VI
SI
N G
S
TA
TI
O
N
TR
A N
SM
IT
D
IS
C R
ET
E
SU
PE
R
VI
SO
R
Y
SI
G N
AL
T
O S
U
PE
R
VI
SI
N
G S
TA
TI
O N
AC
TU
AT
E
R
EC
O R
D
ED
F
IR
E
AL
AR
M
M
ES
SA
G
E
AC
TI
VA
TE
S
TR
O
BE
S
CONTROL UNIT
ANNUNCIATION NOTIFICATION
SYSTEM OUTPUTS
INPUT/OUTPUT MATRIX
3 X X 3 X
HVAC CURRENT SENSOR
X X
X X X
SPRINKLER TAMPER SWITCH
X
X X
X
X X X
X X X
SLC
FACP/ACU
CLEAR STROBES
SPEAKERS
HVAC
CURRENT
SENSOR
BATTERIES
15 15
FS AIM AIM
WF VS
AIM
RISER DIAGRAM NOTES
1. RISER IS DIAGRAMMATIC AND IS ONLY INTENDED TO SHOW THE
FUNCTIONAL RELATIONSHIPS OF MAJOR COMPONENTS AND
INTERFACES TO OTHER SYSTEMS. IT IS NOT INTENDED TO SERVE AS A
WIRING DIAGRAM. MANY ESSENTIAL FEATURES FOR AN OPERATIONAL
SYSTEM, SUCH AS END-OF-LINE DEVICES, ARE NOT SHOWN.
2. REFER TO FIRE ALARM FLOOR PLANS FOR DEVICE LOCATIONS AND
QUANTITIES.
3. REFER TO ELECTRICAL DRAWINGS FOR POWER CIRCUITS.
120 VAC
E E E E
EEEE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
FA501
DE
TA
IL
S
JCW
AMG AMG
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913214
7219262
7207808
INPUT/OUTPUT MATRIX
RISER DIAGRAM
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
SUPPLY AIR, ELBOW DOWN
RETURN OR OUTSIDE AIR, ELBOW DOWN
EXHAUST OR RELIEF AIR, ELBOW DOWN
SUPPLY AIR, ELBOW UP
RETURN OR OUTSIDE AIR, ELBOW UP
EXHAUST OR RELIEF AIR, ELBOW UP
ROUND DUCT OFFSET UP
RECTANGULAR DUCT OFFSET UP
DUCT SECTION, RECTANGULAR SUPPLY AIR
DUCT SECTION, RECTANGULAR RETURN
AIR OR OUTSIDE AIR
DUCT SECTION, RECTANGULAR EXHAUST
AIR OR RELIEF AIR
DUCT SECTION, ROUND SUPPLY AIR
DUCT SECTION, ROUND RETURN AIR OR
OUTSIDE AIR
DUCT SECTION, ROUND EXHAUST AIR OR
RELIEF AIR
45° BEVELED ENTRY TAP
45° BEVELED TAP, SQUARE TO ROUND
CONICAL TEE, ROUND TO ROUND
DUCT TRANSITION, SQUARE TO
SQUARE
DUCT TRANSITION, SQUARE TO
ROUND
FLEXIBLE RECTANGULAR DUCT
FLEXIBLE ROUND DUCT
MITERED ELBOW WITH TURNING VANES
BELLMOUTH OPENING (45° ENTRY)
SIDEWALL GRILLE
PIPE SECTION
PIPE ELBOW DOWN, DOUBLE LINE
PIPE ELBOW UP, DOUBLE LINE
PIPE OFFSET UP
PIPE DOWN, SINGLE LINE
PIPE UP, SINGLE LINE
DIRECTION OF FLOW IN PIPE
DIRECTION OF SLOPE DOWN IN PIPE
PIPE UNION
CLEANOUT
VOLUME BALANCING DAMPER
THERMOSTAT
SMOKE DETECTOR
CARBON DIOXIDE SPACE SENSORCO2
DOOR UNDERCUT
SUPPLY AIR FLOW DIRECTION
RETURN/EXHAUST AIR FLOW DIRECTION
CT CURRENT TRANSMITTER
S
T
POINT OF DISCONNECT
POINT OF CONNECTION
LINETYPE REPRESENTS NEW WORK TO BE
INSTALLED
LINETYPE REPRESENTS EXISTING WORK
TO REMAIN
LINETYPE REPRESENTS DEMO WORK TO
BE REMOVED
PIPE UNION
AIR VENT, AUTOMATIC
AIR VENT, MANUAL
CLEANOUT
FLEXIBLE PIPE CONNECTION
AUTOMATIC FLOW DEVICE
FINNED TUBE RADIATION
STRAINER, BASKET TYPE
STRAINER, WYE TYPE
PRESSURE GAUGE
PRESSURE TAP
P T
THERMOMETER
THERMOMETER WELL
TEMPERATURE/PRESSURE TEST PORT
PIPE CAP
REDUCER, CONCENTRIC
REDUCER, ECCENTRIC
PUMP
GATE VALVE
GLOBE VALVE
BALL VALVE
BALANCING COCK
CHECK VALVE, HORIZONTAL SWING
CHECK VALVE, SPRING LOADED
NEEDLE VALVE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
M-001
AB
BR
EV
IA
TI
O
NS
A
ND
L
EG
EN
D
DRN
ASH
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913215
7219262
7207808
(E) EXISTING TOREMAIN
AF AIRFOIL
AFF ABOVE FINISH FLOOR
AFMS AIRFLOW MEASURING STATION
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AL ALUMINUM
AMB AMBIENT
AMP AMPERE
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
APPROX APPROXIMATE
ARCH ARCHITECT OR ARCHITECTURAL
ATM ATMOSPHERE
AUTO AUTOMATIC
BI BACKWARD INCLINED
BLDG BUILDING
CC COILING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CLG COOLING OR CEILING
COND CONDENSER OR CONDENSATE
CONN CONNECT OR CONNECTION
DB DRY BULB
DBA DECIBELS TO "A" REFERENCE
DC DIRECT CURRENT OR DRY COOLER
DDC DIRECT DIGITAL CONTROL
DEG DEGREE
DELTA P PRESSURE DROP OR PRESSURE DIFFERENTIAL
DI DIGITAL INPUT
DIA DIAMETER
DIFF DIFFERENTIAL
DN DOWN
DO DIGITAL OUTPUT
DP DIFFERENTIAL PRESSURE
DPR DAMPER
EA EACH
EAT ENTERING AIR TEMPERATURE
EC ELECTRONICALLY COMMUTATED
ECM ELECTRONICALLY COMMUTATED MOTOR
EF EXHAUST FAN
EFT ENTERING FLUID TEMPERATURE
EQUIP EQUIPMENT
ERR ENERGY RECOVERY RETURN
ERS ENERGY RECOVERY SUPPLY
EWT ENTERING WATER TEMPERATURE
EX EXISTING
EXH EXHAUST
EXT EXTERNAL
FCU FAN COIL UNIT
FD FIRE DAMPER OR FLOOR DRAIN
FF FINISHED FLOOR
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FLEX CONN FLEXIBLE CONNECTION
FLR FLOOR
FRK OR FSK FOIL SCRIM KRAFT
FRP FIBERGLASS REINFORCED PLASTIC
FS FLOW SWITCH
GA GAUGE
GALV GALVANIZED
GR/LB GRAINS OF MOISTURE PER LB OF DRY AIR
H20 WATER
HTG HEATING
Hz HERTZ
ID INSIDE DIAMETER
INSUL INSULATION
LAT LEAVING AIR TEMPERATURE
LF LINEAR FEET
LFT LEAVING FLUID TEMPERATURE
LRA LOCKED ROTOR AMPS
LVL LEVEL
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MCA MAXIMUM CIRCUIT AMPS
MIN MINIMUM
MTG HGT MOUNTING HEIGHT
N NORTH
N/A NOT APPLICABLE
NC NOISE CRITERIA OR NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER OR NORMALLY OPEN
NOM NOMINAL
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAT OUTSIDE AIR TEMPERATURE
OC ON CENTER
OD OUTSIDE DIAMETER
P PUMP
PD PRESSURE DROP
PG PRESSURE GUAGE OR PROPYLENE GLYCOL
PH PHASE
PHC PREHEAT COIL
PRESS PRESSURE
PS PRESSURE SWITCH
QTY QUANTITY
RA RETURN AIR
RAF RETURN AIR FAN
REQD REQUIRED
REV REVOLUTIONS
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS DISCHARGE
RL REFRIGERANT LIQUID
RLA RATED LOAD AMPS
RLF RELIEF
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
SA SUPPLY AIR
SAF SUPPLY AIR FAN
SAT SATURATION
SEC SECONDS
SP STATIC PRESSURE
SPD SPEED
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
SWSI SINGLE WIDTH SINGLE INLET
SYS SYSTEM
T THERMOSTAT
TEMP TEMPERATURE
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TYP TYPICAL
V VOLT OR VENT
VAR VARIABLE
VCD VOLUME CONTROL DAMPER
VFD VARIABLE FREQUENCY DRIVE
VLV VALVE
VOL VOLUME
W/ WITH
W/O WITHOUT
WB WET BULB
WG WATER GAUGE
WT WEIGHT
ABBREVIATIONS LEGEND
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
M-002
G
EN
ER
AL
N O
TE
S
DRN
ASH
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913216
7219262
7207808
1. PROJECT SUMMARY
THE PROJECT INCLUDES THE REPLACEMENT OF THE EXHAUST AND INTAKE FANS FOR AN EXISTING WAREHOUSE. THE RENOVATION INCLUDES THE REPLACEMENT OF THE DUCTWORK AND RUN AROUND COIL
ENERGY RECOVERY SYSTEM.
2. INTENT OF THE DRAWINGS
THE DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL LOCATION OF DUCTWORK, PIPING, AND EQUIPMENT. THE DRAWINGS DO NOT SHOW EACH NECESSARY OFFSET, TRANSITION, AND ADJUSTMENT NECESSITATED BY COORDINATION WITH OTHER TRADES. THE COST OF OFFSETS, TRANSITIONS, AND ADJUSTMENTS NECESSITATED BY COORDINATION WITH OTHER TRADES MUST BE INCLUDED IN THE
CONTRACTOR'S BID.
3. COORDINATION WITH OTHER TRADES
EXAMINE AND REVIEW THE CONTRACT DOCUMENTS OF EACH DIVISION IN ORDER TO COORDINATE THE INSTALLATION OF WORK.
USE DIMENSIONED ARCHITECTURAL AND STRUCTURAL CONTRACT DRAWINGS TO VERIFY THE SPACE NECESSARY FOR LOCATING PIPING, DUCTWORK, AND EQUIPMENT. USE FIELD MEASUREMENTS TO VERIFY DIMENSIONS WHERE AREAS ARE CONGESTED, AND EXACT LOCATION IS CRITICAL TO ASSURE CORRECT INSTALLATION.
COORDINATION MUST INCLUDE, BUT MUST NOT BE LIMITED TO, VERIFYING THE LOCATION AND SIZE OF OPENINGS IN FLOORS, WALLS, PARTITIONS, CEILINGS, AND ROOFS WITH THE INSTALLING TRADES;
ALLOCATION OF SPACE WITH OTHER TRADES INSTALLING WORK IN CHASES, CEILING INTERSTITIAL SPACES, AND EQUIPMENT SPACES; AND THE PHASING OF INSTALLATION WORK WITH THAT OF OTHER TRADES.
WHERE A PRODUCT IS SUBMITTED THAT IS NOT THE BASIS OF DESIGN (WHETHER STATED IN THE DOCUMENTS OR NOT), COORDINATE THE DIFFERENCES IN THE PRODUCT THAT IMPACT OTHER TRADES WITH THE AFFECTED TRADES. THE COST IMPACT ON OTHER TRADES RESULTING FROM A PRODUCT SUBMITTAL THAT IS NOT THE BASIS OF DESIGN MUST BE INCLUDED IN THE CONTRACTOR'S PRICE AND MUST NOT BE
PASSED ON TO THE OWNER.
4. WORKMANSHIP
PERFORM WORK IN A WORKMANLIKE MANNER TO PROVIDE A FIRST CLASS COMPLETE INSTALLATION. REMOVE, CORRECT AND REPLACE WORK DEEMED UNACCEPTABLE AT THE DISCRETION OF THE
ARCHITECT/ENGINEER.
5. EXISTING WORK
EXISTING WORK TO REMAIN IS SHOWN ON DRAWINGS AS SOLID, LIGHT LINES; EXISTING WORK THAT MUST BE REMOVED IS SHOWN AS HEAVY DASHED LINES.
THE EXTENT OF DEMOLITION REQUIRED IS SHOWN ON DRAWINGS AS A GENERAL GUIDE. ADDITIONAL DEMOLITION MAY BE REQUIRED.
SCHEDULE AND COORDINATE TEMPORARY OR PERMANENT SHUTDOWNS OF EXISTING SYSTEMS OR PORTIONS THEREOF IN ADVANCE, AND INITIATE SHUTDOWN ONLY WITH THE CONCURRENCE OF THE OWNER.
ARRANGE DEMOLITION OF EXISTING WORK, CONNECTIONS TO, OR MODIFICATION OF EXISTING WORK TO KEEP THE NUMBER OF SHUTDOWNS TO A MINIMUM, AND MINIMIZE THE DURATION OF EACH SHUTDOWN.
SCHEDULE SHUTDOWNS FOR NIGHTS OR WEEKENDS, UNLESS APPROVED OTHERWISE BY ARCHITECT/ENGINEER AND OWNERS REPRESENTATIVE.
EXISTING DUCTWORK AND PIPING LOCATIONS AND SIZES SHOWN ARE APPROXIMATE, ARE SHOWN FOR REFERENCE ONLY, AND ARE NOT INTENDED AS EXACT. FIELD VERIFY EXISTING SIZES AND LOCATIONS PRIOR
TO FABRICATING CONSTRUCTION WORK.
REMOVE EXISTING CONTROLS AND WIRING NOT BEING REUSED. CAP TUBING NOT REMOVED AIRTIGHT.
REMOVE EQUIPMENT, DUCTWORK, PIPING, ETC. INDICATED TO BE DEMOLISHED FROM THE SITE UNLESS NOTED OTHERWISE. DISPOSE OF MATERIALS PROPERLY.
REPAIR DAMAGED FINISHES, SURFACES, ETC. TO PROVIDE A POLISHED APPEARANCE.
6. EQUIPMENT
WHERE ROOM THERMOSTATS ARE SHOWN LOCATED ON PERIMETER WALLS, PROVIDE THE THERMOSTAT WITH AN INSULATED BASE. PROVIDE WALL-MOUNTED THERMOSTATS, SENSORS, AND DEVICES NO HIGHER THAN 48" ABOVE FINISHED FLOOR TO COMPLY WITH ADA STANDARDS FOR ACCESSIBLE DESIGN.
PROVIDE EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS, SPECIFICATION SECTIONS 23 30 00 AND APPROVED SHOP DRAWINGS.
MAINTAIN SERVICE AND OPERATING CLEARANCES AROUND EACH SIDE OF EACH PIECE OF EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S PRINTED REQUIREMENTS AND RECOMMENDATIONS.
7. DUCTWORK
DUCTWORK SIZES INDICATED ON CONTRACT DOCUMENTS ARE CLEAR, INSIDE DIMENSIONS WITH NO LINER.
PROVIDE DUCTWORK IN ACCORDANCE WITH THE SPECIFICATION SECTION 23 31 13.00 40, PLANS, DETAILS, AND THE DUCT CONSTRUCTION AND INSULATION SCHEDULE.
PROVIDE ACCESS DOORS IN DUCTWORK FOR DAMPERS AND CONTROL DEVICES. PROVIDE ACCESS DOORS SIZED AND LOCATED FOR INSPECTION, MAINTENANCE, CLEANING, AND ADJUSTMENT OR PER THE
MANUFACTURER'S PRINTED REQUIREMENTS AND RECOMMENDATIONS.
PROVIDE SQUARE, 90° DUCT ELBOWS WITH SINGLE THICKNESS TURNING VANES SPACED 1-1/2" APART WHETHER SHOWN ON PLANS OR NOT UNLESS SPECIFICALLY NOTED OTHERWISE.
8. PIPING
PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN THE SYSTEM AND DRAIN VALVES AT ALL LOW POINTS IN THE SYSTEM.
MINIMUM PIPE SIZE MUST BE 3/4".
PROVIDE PIPING IN ACCORDANCE WITH THE SPECIFICATIONS, THE PIPING PLANS AND DETAILS, AND THE PIPE INSULATION SCHEDULE.
PIPING SCHEMATICS AND DIAGRAMS SHOW ONLY THE BASIC FLOW PATTERN AND EQUIPMENT ARRANGEMENT, AND DO NOT SHOW EVERY INSTANCE OF EQUIPMENT CONNECTED TO THE SYSTEM. REFER TO THE
PLANS, SECTIONS AND DETAILS FOR DETAILED SYSTEM LAYOUT.
ELBOWS MUST BE LONG RADIUS UNLESS OTHERWISE NOTED.
PIPING SYSTEMS MUST BE LABELED PER ASME A13.1. COLOR SCHEME IS WHITE LETTERS ON GREEN BACKGROUND.
GENERAL NOTES
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
A
1/2"ERS
1/2"ERS
1/2"ERS
1/2"ERS
1/2"ERS
1/2"ERR
NIC
3 3 3
3 3 3
1/2"ERS
1/2"ERR
1/2"ERR
1/2"ERR
1/2"ERR
1/2"ERS
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E)RAD-1
(E)RAD-1
(E)RAD-1
(E)RAD-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E)RAD-1
(E)RAD-1
(E )R
AD
-1
(E)RAD-2
(E )R
AD
-2
(E )R
AD
-1
(E)RAD-2
(E)RAD-2 (E)RAD-2
(E)RAD-2
(E)RAD-2 (E)RAD-2
(E )R
AD
-2
(E)RAD-2
(E)RAD-2
(E )R
AD
-2
(E)RAD-2 (E)RAD-2 (E
)R
AD
-2
(E)RAD-2
(E)RAD-2
1/2" UP 1/2" UP
1/2" UP 1/2" UP
1/2" UP
1/2" UP
1/2" UP
1/2" UP
1/2" UP
1/2" UP(E)16x16 (E)14x16
(E)14x16 (E)22x22
20x16 EA UP
(E)24x22
(E)24x22
(E)24x24
(E)16x16
(E)14x16
THRU ROOF THRU ROOF THRU ROOF
UP THRU
20x16 EA UP
20x16 EA UP
20x16 EA UP
(E)22x20(E)24x24
(E)24x24
THRU ROOF
THRU ROOF THRU ROOF
THRU ROOFTHRU ROOFTHRU ROOF
THRU ROOF THRU ROOF
THRU ROOF THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
D101
OXIDIZERS
C101
CORROSIVES
B110
HOLDING AREA
A101
FLAMABLES
J101
BATTERY ACID
I101
ARGON/FREON
H101
ACETYLINE/PROPANE
G101
FLAMMABLE LIQUIDS
F101
HELIUM/OXYGEN
E101
OXYGEN
38x36
(E)
(E)
(E)
(E)
38x36
EA UP
EA UP
EA UPEA UP
EA UPEA UP
38x36
38x3638x36
38x36
EA
EA UPEA UPEA UP ROOF
EA EA
UP THRU UP THRU
ROOF ROOF
PLAN
NORTH
GRAPHIC SCALE:
16' 08' 32' 48'16'
1/16"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
MD110
LE
VE
L
-H
VA
C P
LA
N
DE
M
O
LI
TI
O
N
DRN
ASH
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913217
7219262
7207808
SHEET KEYNOTES
1 DEMOLISH INTAKE FAN AND ASSOCIATED MOUNTS, COILS,
AND CONTROLS. PREPARE WALL OPENING FOR
INSTALLATION OF NEW DUCTWORK AND ASSOCIATED
FANS.
2 DEMOLISH RUN-AROUND PUMP, PIPING, CONTROLS, AND
ALL ASSOCIATED ACCESSORIES.
3 EXISTING INTAKE LOUVERS TO REMAIN.
4 DEMOLISH PIPE UP THRU ROOF. PREPARE OPENING FOR
REUSE UNDER NEW WORK.
GENERAL SHEET NOTES
1 REUSE EXISTING PIPE HANGERS AS APPLICABLE.
2 REUSE EXISTING ROOF OPENINGS AND ROOF PIPE
PENETRATIONS.
3 ALL FINNED TUBED RADIATORS AND ASSOCIATED STEAM
PIPING ARE EXISTING TO REMAIN.
SCALE: 1/16" = 1'-0"
LEVEL 1 - HVAC PLAN DEMOLITION
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
20x16
20x26
18Ø
16x16 30x30
20x16
20x26 30x30 16x16
18Ø
20x16
20x26 30x30 16x16
18Ø
20x16
20x26
18Ø
30x30 16x16
15Ø 30x30 16x1618Ø
30x30 16x1618Ø
30x30 16x16
18Ø 30x30 16x16
30x30 16x16 18Ø 18Ø
30x30 16x16
18Ø10Ø10Ø
10Ø10Ø10Ø
16x16 EA DN 14x16 EA DN 14x16 EA DN 22x22 EA DN
24x24 EA DN 24x22 EA DN
24x22 EA DN
2 3
2 3
2 3
2 3
1 21 21 2 1 21 212
1/2" DN
1/2" DN
1/2" DN
1/2" DN
1/2" DN1/2" DN
1/2" DN
1/2" DN
1/2" DN1/2" DN
20x16 EA DN
20x16 EA DN
20x16 EA DN
20x16 EA DN
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
22x20 EA DN24x24 EA DN
24x24 EA DN
THRU ROOF THRU ROOF
THRU ROOF THRU ROOF THRU ROOF
THRU ROOF
16x16 EA DN 14x16 EA DN
THRU ROOF THRU ROOF THRU ROOF THRU ROOF THRU ROOF THRU ROOF
PLAN
NORTH
GRAPHIC SCALE:
16' 08' 32' 48'16'
1/16"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
MD120
RO
O
F -H
VA
C
PL
AN
D
EM
O
LI
TI
O
N
DRN
ASH
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913218
7219262
7207808
GENERAL SHEET NOTES
1 REUSE EXISTING ROOF CURBS FOR FAN MOUNTING, ROOF
DUCT PENETRATIONS AND ROOF PIPE PENETRATIONS.
2 REUSE EXISTING DUCT SUPPORTS.
3 REPAIR ROOF AS REQUIRED DUE TO DEMOLITION AND
REFER TO ARCH.
SCALE: 1/16" = 1'-0"
ROOF - HVAC PLAN DEMOLITION
SHEET KEYNOTES
1 DEMOLISH EXHAUST FAN AND ASSOCIATED DUCTWORK.
2 EXISTING ROOF OPENING AND CURB TO REMAIN. PREPARE
OPENING FOR INSTALLATION OF NEW DUCTWORK. REFER
TO NEW WORK PLANS FOR ADDITIONAL INFORMATION.
REFER AND COORDINATE ROOF WORK WITH ARCH.
3 DEMOLISH RUN-AROUND COIL AND ASSOCIATED PIPING.
4 DEMOLISH PIPING DOWN THRU ROOF. PROTECT AND
PREPARE PENETRATION FOR NEW PIPING INSTALLED
UNDER NEW WORK. REFER AND COORDINATE ROOF WORK
WITH ARCH. SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
NIC
SF-5
SF-6
SF-4
SF-3
SF-1
SF-2
1 1
1"ERR
1"ERS
OA-HC-5
OA-HC-6
1 1/4"ERR
1 1/4"ERS
1"ERR
1"ERS
OA-HC-4
OA-HC-3
OA-HC-2
1"ERS
1"ERR
1"ERR
1"ERS
OA-HC-1
(E)RAD-2
(E
)R
AD
-2
(E )R
AD
-1
(E)RAD-2
(E)RAD-2
(E)RAD-2 (E)RAD-2
(E)RAD-2
(E)RAD-2 (E
)R
AD
-2
(E)RAD-2
(E)RAD-2 (E
)R
AD
-2
(E)RAD-2
(E)RAD-2
(E)RAD-2
(E )R
AD
-2
(E)RAD-2
(E)RAD-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E)RAD-1
(E)RAD-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E)RAD-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E )R
AD
-1
(E)RAD-1
(E )R
AD
-1
(E)RAD-1
(E )R
AD
-1
(E)RAD-1
(E )R
AD
-1
(E )R
AD
-1
(E)RAD-1
(E)RAD-1
(E)RAD-1
(E )R
AD
-1
(E)RAD-1
P-5A
P-4
P-3
P-2
P-1
1 1/4"ERR
(E)14x16 (E)14x16 (E)14x16
14x14 EA UP 14x14 EA UP 14x14 EA UP
16x16 EA UP
16x16 EA UP
16x16 EA UP
16x16 EA UP
(E)22x22
(E)22x22
22x22 EA UP (E)22x20
(E)22x20
(E)22x20
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1 1/4"ERR
1 1/4"ERS
1 1/4"ERR
1 1/4"ERS
1 1/2"ERS
1 1/4"ERS
1"ERS
1 1/2"ERR
1 1/4"ERR
1 1/4"ERS
1"ERR
1"ERS
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOFTHRU ROOFTHRU ROOF
THRU ROOFTHRU ROOFTHRU ROOF
THRU ROOF
D101
OXIDIZERS
C101
CORROSIVES
B110
HOLDING AREA
A101
FLAMABLES
J101
BATTERY ACID
I101
ARGON/FREON
H101
ACETYLINE/PROPANE
F101
HELIUM/OXYGEN
G101
FLAMMABLE LIQUIDS
E101
OXYGEN
ET-3
ET
-4
ET-2
ET-1
ERS/R UP
ERS/R UP
TO EX-CC-10
TO EX-CC-9
ERS/R UP
TO EX-CC-8
ERS/R UP
TO EX-CC-6
ERS/R UP
TO EX-CC-7
ERS/R UP
TO EX-CC-5
ERS/R UP
TO EX-CC-1
ERS/R UP
TO EX-CC-2
ERS/R UP
TO EX-CC-3
ERS/R UP
TO EX-CC-4
EA UP
EA UP
EA UP
EA UP
EA UP
(E)
(E)
(E)
(E)
(E)
EA UP EA UP EA UP
(E) (E) (E)
P-5B
ET-5
38x36
38x36
38x36
38x3638x36
38x36
PLAN
NORTH
GRAPHIC SCALE:
16' 08' 32' 48'16'
1/16"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
MH110
LE
VE
L
-H
VA
C
PL
AN
DRN
ASH
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913219
7219262
7207808
SCALE: 1/16" = 1'-0"
LEVEL 1 - HVAC PLAN
SHEET KEYNOTES
1 PROVIDE NEW INTAKE DUCTWORK THROUGH WALL TO
NEW FAN. REFER TO DETAIL C3/M-503 FOR ADDITIONAL
INFORMATION.
2 PROVIDE HEAT RECOVERY PIPING AND ROUTE AS
INDICATED BETWEEN INTAKE COIL AND EXHAUST COIL ON
ROOF. REFER TO ROOF PLAN FOR CONTINUATION.
3 ROUTE PIPING UP THRU EXISTING ROOF PENETRATION.
GENERAL SHEET NOTES
1 REUSE EXISTING PIPE HANGERS AS APPLICABLE.
2 ALL FINNED TUBED RADIATORS AND ASSOCIATED STEAM
PIPING ARE EXISTING TO REMAIN.
3 PROVIDE ALL FANS WITH HOA SWITCH MOUNTED TO FAN.
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
RF-1
RF-4
RF-3
RF-2
RF-5
RF-6
RF-7
RF-8
RF-9
RF-10
RF-11RF-12RF-13
RF-14RF-15RF-16
EX-CC-8
EX-CC-9
EX-CC-10
EX-CC-6
EX-CC-7 EX-CC-4
EX-CC-3
EX-CC-2
EX-CC-1
16Ø 16Ø 16Ø
14x16 EA DN 14x16 EA DN 14x16 EA DN
14x14 EA DN
16Ø 16Ø 16Ø
14x14 EA DN
22x22 EA DN
22x22 EA DN22x22 EA DN 22x20 EA DN
22x20 EA DN 22x20 EA DN
EX-CC-5
16x16
22Ø
16x16
22Ø
16x16
22Ø
16x16
22Ø
1"
16x16 EA DN
16x16 EA DN
16x16 EA DN
16x16 EA DN
14x14 EA DN
1" 1"
1" 1"
1"
1"
1"
1"
1"
24Ø 24Ø 24Ø
24Ø 24Ø24Ø
30x30
30x30
30x3030x30
30x30
30x30
30x3030x30
THRU ROOF THRU ROOF THRU ROOF
THRU ROOF THRU ROOF THRU ROOF
ERS/R DN
THRU ROOF
ERS/R DN
THRU ROOF
ERS/R DN
THRU ROOF
ERS/R DN
THRU ROOF
ERS/R DN
THRU ROOF
ERS/R DN
THRU ROOF
16x16 EA DN
16x16 EA DN
16x16 EA DN
16x16 EA DN
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
THRU ROOF
ERS/R DN
THRU ROOF
ERS/R DN
THRU ROOF
ERS/R DN
THRU ROOF
ERS/R DN
THRU ROOF
PLAN
NORTH
GRAPHIC SCALE:
16' 08' 32' 48'16'
1/16"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
MH120
RO
O
F -H
VA
C
PL
AN
DRN
ASH
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913220
7219262
7207808
SHEET KEYNOTES
1 SEE DETAIL C4/M-501 FOR ROOF CURB DETAIL.
2 PROVIDE FAN WITH 120V CURRENT SWITCH TO ALARM TO
FIRE ALARM SYSTEM. REFER TO LIFE SAFETY PLANS FOR
MORE INFORMATION.
SCALE: 1/16" = 1'-0"
ROOF - HVAC PLAN
GENERAL SHEET NOTES
1 INSTALL NEW FANS ON EXISTING ROOF CURBS.
2 INSTALL NEW DUCTWORK USING EXISTING DUCT
SUPPORTS.
3 ROUTE NEW EXHAUST DUCTWORK DOWN TO BUILDING
THROUGH EXISTING ROOF OPENINGS. PROVIDE NEW
FLASHING AROUND DUCT PENETRATION AND PROVIDE
WATER TIGHT SEAL.
4 PROVIDE ALL FANS WITH HOA SWITCH MOUNTED TO FAN.
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
EXISTING ROOF CURB
EXHAUST FAN
ROOF
EXISTING ROOF CURB
REAR VIEW
EXHAUST FAN
ACCESS DOOR
WEATHER HOOD
FLANGED CONNECTION
GRAVITY BACKDRAFT DAMPER
DISCHARGE DUCT
BIRD SCREEN
SPRING ISOLATORS
PER MANUFACTURER'S
RECOMMENDATION
ROOF
SIDE VIEW
EXISTING ROOF CURB
DUCT MOUNTED FILTERS
DUCT MOUNTED COIL
HEAT RECOVERY PIPING
TO INTERIOR COIL
REUSE EXISTING ROOF
PENETRATION
FLOOR
STRUCTURAL SUPPORTS EXISTING WINDOW
OPENING
WEATHER HOOD
WITH 1/2" WIRE
MESH BIRD SCREEN
GRAVITY BACKDRAFT
DAMPER
EXTERIOR WALL
ANGLED FILTER
SUPPLY AIR FAN WITH
WALL HOUSING GUARD
ENERGY RECOVERY
COIL AND
ASSOCIATED PIPING
HVAC EQUIPMENT
DEFLECTION ISOLATION
BASE
POLYMER MODIFIED
MEMBRANE FLASHING
PLY AND BASE
FLASHING PLY
4"4"
2" M
IN
ALL-PURPOSE SEALANT
BONDING ADHESIVE
9" MEMBRANE FLASHING SHEET
5" MEMBRANE FLASHING
SHEET
FASTENERS AT 6"
O.C. - AS REQUIRED
STAINLESS
STEEL CLAMP
CONDUIT OR PIPE -
AS REQUIRED
AD
AD
DUCT COIL
ERR
ERS
BALL VALVE
MANUAL AIR VENT
W/HOSE THREAD
ADAPTOR & CAP
TEMPERATURE
PRESSURE TEST
PORT TYP. DRAIN VALVE
W/HOSE THREAD
ADAPTOR & CAP
UNION
BALANCING COCK 42154 3
NOTES:
1. ALL VALVES, FITTINGS ETC. SHALL BE FULL LINE
SIZE
2. FLEXIBLE CONNECTORS CAN BE OMITTED WHERE
RECOMMENDED BY MANUFACTURER'S PRINTED
INSTALLATION INSTRUCTIONS.
3. SUPPORT PUMP WEIGHT AS RECOMMENDED BY
MANUFACTURER'S PRINTED INSTALLATION
INSTRUCTIONS.
1. IN-LINE CIRCULATOR PUMP
2. MOTOR
3. BUTTERFLY OR BALL
VALVE (SEE SPEC'S)
4. FLEXIBLE CONNECTOR
5. CONCENTRIC REDUCER
6. EXPANSION TANK
7. FILL VALVE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
M-501
DE
TA
IL
S
DRN
ASH
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913221
7219262
7207808
SCALE: NTSM-501
UTILITY SET INSTALLATION DETAILC1
SCALE: NTSM-501
OUTDOOR AIR INTAKE-HEAT RECOVERYC3
SCALE: NTSM-501
MECHANICAL CURB DETAILC4
SCALE: NTSM-501
PIPE PENETRATION FLASHING DETAILA1
SCALE: NTSM-501
DUCT MOUNTED COILA3
SCALE: NTSM-501
IN-LINE CIRCULATOR PUMPA4
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
4' MAX.
RISER CLAMP
MSS TYPE 41
CHANNEL HANGERS FOR MULTIPLE HANGER RODS
CLEVIS
MSS TYPE 46
MSS TYPE 43
ROLLER HANGERS
(SHORT RODS)
MSS TYPE 1
HANGER TYPE, SIZE AND SPACING SHALL COMPLY WITH SPECIFICATION REQUIREMENTS.
LT. MSS TYPE 31 (MAX. 750 lb) MED. MSS TYPE 32 (MAX. 1500 lb) HVY. MSS TYPE 33 (MAX. 3000 lb)
EPOXY COATED OR SCREW-IN INSERT
UNISTRUT P1000
4 LUGS
WELDED
TO PIPE
MSS TYPE 8
(1 0"
[2 m m ] O
R L
ES
S
(1 0"
[2 m m ] O
R L
ES
S
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
M-502
DE
TA
IL
S
DRN
ASH
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R E
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
, V
A
R E
P
LA
C E
H V
A C
, H A
ZM
A
T/
IS
S U
E M
A G
, B
12913222
7219262
7207808
SCALE: NTSM-502
PIPE HANGER DETAILSC1
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
REMARKS:
1. PROVIDE PUMPS WITH EXTERNAL DUCT-MOUNTED THERMOSTAT TO CLOSE AT 50°F (ADJ).
2. PUMPS TO BE CONSTANT FLOW, ACTIVATED BY DUCT-MOUNTED THERMOSTAT.
3. EXPLOSION PROOF, CLASS 1, DIVISION 2, GP. D.
4. PUMPS TO BE PIPED IN PARALLEL OPERATING CONCURRENTLY.
REMARKS:
1. PROVIDE COILS WITH TURBULATORS.
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
MAXIMO WO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
PATRICK FAULKNER
NICHOLAS HALL
MILTON EVERETTE
FINAL SUBMITTAL
DEREK M. CHASTIAN
M-601
SC
HE
DU
LE
S
DRN
ASH
04/28/2025
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
NA
VF
AC
M
ID
LA
N
T C
I C O
R…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .