This is Amendment 0001 to NAVFAC Specification 7219262 for replacing HVAC systems at Building 149, MAG 14, MCAS Cherry Point, North Carolina. The amendment, effective August 7, 2025, is issued by CG MCAS Cherry Point Facilities and must be acknowledged with proposal submissions to avoid rejection. The amendment specifically updates the bond requirements to mandate that bid bonds be submitted in accordance with Federal Acquisition Regulation (FAR) 52.228-1, requiring an electronic copy of the bid bond to be included with each proposal.
Key dates remain unchanged with the pre-award RFI deadline staying at August 18, 2025 at 9:00 AM and the proposal due date remaining August 26, 2025 at 12:00 PM local time. The project involves hazmat-free HVAC replacement work at the Marine Corps Air Station. Failure to submit an electronic copy of the bid bond with the proposal will result in the proposal being deemed non-responsive and removed from consideration. All other contract terms and conditions remain unchanged from the original solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7219262 AMENDMENT 0005.pdf | ||
| 7219262 AMENDMENT 0004.pdf | ||
| 7219262 AMENDMENT 0003.pdf | ||
| 7219262 AMENDMENT 0002.pdf | ||
| 7219262 SpecsAsOne.pdf | ||
| 7219262 DrawingsAsOne.pdf | ||
| 7219262 RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC
SPECIFICATION
7219262 Replace HVAC Hazmat
Free Issue MAG 14, Building 149
MCAS Cherry Point, NC AMENDMENT
#0001
IMPORTANT
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.
If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 08/07/2025 7219262
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
CG MCAS Cherry Point
FACILITIES, ROICC
B-163, CURTIS ROAD
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
Replace HVAC Hazmat Free Issue MAG 14, Building 149
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7219262 Replace HVAC Hazmat Free Issue MAG 14, Building 149, Marine Corps Air Station Cherry Point, NC
Amendment 0001 is being issued to update the bid-bond requirements.
The deadline to submit pre-award RFI’s REMAINS 18 August 2025 at 9:00 AM.
The proposal due date of 26 August 2025 at 12:00 PM local time REMAINS unchanged.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
Christina Newton, Contract Specialist
06/25/2025
Amendment 0001 Project No. 7219262
REPLACE HVAC HAZMAT FREE ISSUE MAG 14 BUILDING 149
MCAS Cherry Point, North Carolina
Block 14. DESCRIPTION OF AMENDMENT (cont.)
A. This amendment updates the Bond Requirements paragraph provided in the original Request for Proposal to the following:
Bond Requirements: Bid bonds are required in accordance with Federal Acquisition Regulation (FAR) 52.228-1. An electronic copy of your bid bond must be submitted with your proposal. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed non-responsive and your proposal removed from consideration.
B. All other contract terms and conditions remain unchanged.