7219262 AMENDMENT 0002.pdf
PDF 344 KB Posted
- Solicitation number
- N400857219262
About this file
This document is a Navy Facilities (NAVFAC) Amendment #0002 for a solicitation to replace HVAC systems at Marine Corps Air Station (MCAS) Cherry Point, North Carolina, specifically for Building 149 in MAG 14. The amendment, with project number 7219262, addresses three pre-award Request for Information (RFI) questions related to fan specifications and performance. The key RFI responses indicate that contractors should bid as specified, with the Design of Record (DOR) taking no exceptions to proposed fan configurations. The rooms do not require precise airflows or specific pressurization, and fans are sized to provide basic minimum airflow. The proposal due date remains unchanged at 26 August 2025 at 12:00 PM local time, with the deadline to submit pre-award RFIs still set for 18 August 2025 at 9:00 AM. A minimum AMCA spark rating of Type B is required for all fans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7219262 AMENDMENT 0005.pdf | ||
| 7219262 AMENDMENT 0004.pdf | ||
| 7219262 AMENDMENT 0003.pdf | ||
| 7219262 AMENDMENT 0001.pdf | ||
| 7219262 DrawingsAsOne.pdf | ||
| 7219262 SpecsAsOne.pdf | ||
| 7219262 RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC
SPECIFICATION
7219262 Replace HVAC Free Issue MAG 14, Building 149
MCAS Cherry Point, NC AMENDMENT
#0002
IMPORTANT
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.
If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0002 08/13/2025 7219262
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
CG MCAS Cherry Point
FACILITIES, ROICC
B-163, CURTIS ROAD
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
Replace HVAC Hazmat Free Issue MAG 14, Building 149
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7219262 Replace HVAC Hazmat Free Issue MAG 14, Buidling 149, Marine Corps Air Station Cherry Point, NC
Amendment 0002 is being issued to respond to pre-award RFI's.
The deadline to submit pre-award RFI’s REMAINS 18 August 2025 at 9:00 AM.
The proposal due date of 26 August 2025 at 12:00 PM local time REMAINS unchanged.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
16C. DATE SIGNED
josef.vallone Cross-Out josef.vallone Inserted Text
Subj: AMENDMENT TO WO 7219262, REPLACE HVAC, HAZMAT/FREE ISSUE, MAG-14, BLDG. 149, MCAS CHERRY POINT NC
CONTINUATION SHEET
PROJECT TABLE OF CONTENTS
SECTION 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC is deleted completely.
Amendment 0002 7219262 Replace HVAC Hazmat Free Issue MAG 14, Building 149
RFI Responses:
1. SF-1 through SF-6 are currently scheduled as axial propeller fans. These fans are installed inline located downstream of filter banks. As the filters accumulate debris and begin to load, the system static pressure will increase. Axial propeller fans experience a significant drop in airflow when additional static pressure is added to the system, especially when compared to centrifugal fans. Since these fans are operating at constant speed, any increase in static pressure due to filter loading will result in reduced airflow and could lead to imbalances across the system.
Should inline centrifugal fans be used for the supply fans instead, so that their fan curves more closely match those of the roof-mounted centrifugal utility set fans and better maintain balanced airflow as system pressure changes?
Response: Bid as specified, The DOR takes no exception for the use of inline centrifugal fans in lieu of the basis of design, however, this change is not necessary. The rooms served do not require precise airflows nor do they require a specific level of pressurization.
2. How will balancing be achieved on SF-1 through SF-6. With direct drive fans, there is no way to balance the fans without the use of VFDs. The use of VFDs would be difficult if they need to meet Class 1 Div 2. Can these fans be provided as belt drive so the RPM can be set per scheduled performance?
Response: The rooms served do not require precise airflows nor specific balancing. Fans are sized to provide basic minimum airflow through each room.
3. Is there a specific AMCA spark rating we are required to meet on all of the fans?
Response: A minimum of Type B.
| Amend Cover |
| Amendment Page 2 |
File details come from the government source that posted it. Updated .