Amend 0005.pdf
PDF 1 MB Posted
- Attached to
- SH50 and HP259 HVAC Repairs
- Solicitation number
- N4008527R9004
About this file
This is Amendment 0005 to Solicitation N40085-27-R-9004, issued by NAVPAC Mid-Atlantic on October 30, 2026, with an effective date of November 19, 2026. The amendment responds to RFIs and extends the proposal due date to November 24, 2026, by 3:00 pm. All other terms and conditions remain unchanged.
The amendment addresses four substantive matters pertaining to HVAC repairs at two facilities: HP259 and SH50. For HP259, the government clarified that escorts are required only for work inside the building; work in the mechanical room and outside areas may proceed without escorts during normal business hours with coordination for holiday periods. Heavy equipment may be used for AHU removal and placement during normal business hours, with power outages requiring shutdown coordination. For SH50, the government confirmed that the geothermal loop vault cannot be located on-site and will be flushed at the supply and return line connections near the mechanical room stairs. The geothermal loop will not require glycol or demineralized water but will require chemical treatment of the water. Additionally, no new piping will be installed under the slab for building SH50, contrary to initial drawing appearances; only system flushing is required per the contract notes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0004.pdf | ||
| Amend 0003 - Site Visit 2.pdf | ||
| Amend 0002 -Revised Pricing Sheet.pdf | ||
| Amend 0001 27R9004 - Site Visit.pdf | ||
| 25-0082 SOW.pdf | ||
| 25-0063 SOW (4).pdf | ||
| N4008525B0082 Specs.pdf | ||
| N4008525B0063 SpecSigned.pdf | ||
| N4008525B0063 DwgSigned.pdf | ||
| N4008525B0082 Dwgs.pdf | ||
| Pricing Sheet 27R9004.pdf | ||
| Mech MACC RFP 27R9004.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-26-R-9004
Amendment 0005
CONTINUATION SHEET
1. QUESTION: After attending the site visit yesterday, a couple of questions have come
up. See below;
• Will all work at HP259 require an escort?
• Will heavy equipment be able to be used for removal and placement of the AHU inside the fenced in area of HP259? It appears there is limited access to the mechanical room.
• Can all work be accomplished during normal business hours at HP259 since the work will be in the mechanical room as noted in the scope of work?
• Will a power outage for the AHU shutdown required work outside normal hours?
ANSWER:
• No escort will be needed unless work needs to be done inside the building. If work is just in the mechanical room and outside, then no escort
• Yes, during normal business hours, coordination will need to be made for holiday periods. For example, unit may be off for an extended period over a holiday, but we can coordinate fence to be opened.
• Only outages that require shutdown of total electric unit will need to be coordinated
2. QUESTION: Please see below RFI for SH50.
• At the site visit, we were unable to locate a distribution vault(header) for the geothermal field. The supply and return lines are located in the mechanical room with temporary connections already installed. Drawings call for each well field loop to be to be flushed. Without access to a distribution vault(header), there is no way to flush well field loops independently. Please advise.
• After flushing, will the geothermal loop require glycol?
• After flushing, will the geothermal loop require demineralized or specialized water to be installed in the system?
ANSWER:
• The geothermal loop vault was unable to be located on the site. The geothermal field will need to be flushed at the supply and return line connections location near the mechanical room stairs at SH50.
• The geothermal loop will not require glycol.
• No demineralized or specialized water will need to be installed in the system.
However, the water will need to be chemically treated.
N40085-26-R-9004
Amendment 0005
3. QUESTION: Detail B on Pg M502 appears that there is new pipe under the slab. Are we to change any of the piping where the Geothermal enters the Bldg? If so how far out is replaced with new. Note on 4 M-102 states to only flush the system.
ANSWER: There is no new pipe to be added under the slab for building SH50 on page
M502.
4. The due date and time is changed to November 24, 2026 by 3:00 pm.
5. All other terms and conditions remain unchanged.