Gutter Guard installation brief Scope of Work.docx

DOCX document 169 KB Posted

Attached to
Gutter Cleaning and Maintenance Services
Solicitation number
N4008527R0033
Issued by

About this file

This is a Scope of Work document for gutter guard installation services at Naval Weapons Station (NWS) Earle, dated October 8, 2026. The work involves installation of gutter guards across 3,000 linear feet of gutters at facilities in Colts Neck and Leonardo, New Jersey.

The gutter guard system must comply with multiple DoD and national standards including UFC 3-110-03 (Roofing), UFC 1-200-01 (DoD Building Code), ASCE/SEI 7 (wind and snow load provisions), and SMACNA guidelines. Requirements mandate rigid metallic frames with heavy-duty mesh screens capable of blocking pine needles, oak tassels, and leaf debris while maintaining maximum water throughput of 150 inches per hour. All components must demonstrate high corrosion resistance, passing a minimum 1,000-hour salt spray test per ASTM B117 without blistering, flaking, or pitting. Assemblies must resist wind forces of minimum 115 mph (variable by base location, higher at waterfront facilities) per ASCE 7, using mechanical fasteners rather than friction-only tabs in wind-exposed areas. Approved materials include stainless steel micro-mesh with extruded aluminum subframes (6063-T5 or 6005-T5 minimum 0.050-inch thickness) or heavy-duty perforated sheet metal guards matched to existing gutter materials. All fasteners must be self-drilling, self-tapping screws with neoprene or EPDM sealing washers. Wire downspout strainers are mandatory at all outlets. Pre-installation requirements include inspection of existing gutters for proper slope (minimum 1/16 inch per foot without ponding), complete cleaning of accumulated debris and silt, and verification that tree canopies are trimmed back 10 feet from the roof perimeter. Contractor qualifications must align with NAICS 238160 (Roofing Contractors), NAICS 238170 (Siding & Sheet Metal Contractors), or operation as an approved specialty subcontractor under a general construction prime (NAICS 236220). The estimated total cost for installation is $321,421, equating to $107.14 per linear foot. Submittals required include fastening schedules, wind-uplift engineering details, and 12-inch full-scale physical samples of each gutter guard type with mounting clips and fasteners.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gutter Guard installation brief Scope of Work Date: 10-08-2026 Prepared by: Azeb Hailu The Scope of work should meet requirements based on the following DoW/ US Navy specifications and gridlines and national standards:

UFC 3-110-03: Roofing UFC 1-200-01: DoD Building Code UFC 3-301-01: Structural Engineering UFGS 07 71 00: Roof Specialties and Accessories UFGS 07 60 00: Flashing and Sheet Metal UFGS 01 33 00: Submittal Procedures SMACNA: Architectural Sheet Metal Manual (7th Edition), Chapter 1 (Gutters and Downspouts).

ASCE/SEI 7: Minimum Design Loads and Associated Criteria for Buildings and Other Structures (wind and snow load provisions).

ASTM A240/A240M: Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip.

ASTM B209: Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate.

ASTM B370: Standard Specification for Copper Sheet and Strip for Building Construction.

Based on these standards the gutter guard must meet the minimum requirements of the following:

1. must consist of rigid metallic frames supporting heavy-duty mesh screens designed to prevent pine needles, oak tassels, deciduous leaf debris, and pests from entering gutters while permitting maximum hydraulic transfer.

1. Components must exhibit high corrosion resistance. All raw cut edges, fasteners, and mesh frames must pass a minimum 1,000-hour salt spray test per ASTM B117 without blistering, flaking, pitting, or red rust.

1. Assemblies must be engineered and mechanically secured to resist wind forces determined in accordance with ASCE 7, Min 115mph (This will depend on the location of the Base. Waterfront is much windier). Friction-only or press-fit friction tabs without mechanical fastener backups are strictly prohibited in exterior wind-exposed areas.

1. Minimum water throughput capacity: 150 inches of rainfall per hour.

1. Assemblies must accommodate linear thermal expansion and contraction over an ambient range of -10°F to 110° shearing fasteners.

1. Plastic, PVC, vinyl, nylon, and open-cell polyether/polyurethane foam inserts are prohibited.

Approved materials are:

1. Stainless Steel Micro-Mesh with Extruded Aluminum Subframe

•Frame: Extruded architectural aluminum alloy 6063-T5 or 6005-T5, minimum thickness 0.050 inch (1.27 mm).
•Finish: Factory-applied architectural grade anodized (AAMA 611 Class I) or thermo-set fluoropolymer resin finish (AAMA 2605, PVDF 70% Kynar 500) matching existing gutter/fascia color.
•Mesh Screen: Marine-grade Type 316 stainless steel (or Type 304 for non-saline interior zones) woven wire cloth, plain weave.
•Wire diameter: Minimum 0.011 inch to 0.018 inch.
•Mesh count: Minimum 28 to 30 mesh per linear inch to block fine needles while shedding silt.
•Mechanical Hemming: Mesh must be permanently mechanically locked or crimped into the extruded aluminum frame without adhesives.

1. Heavy-Duty Perforated Sheet Metal Guards (Matched Metal System)

•Substrate Material: Must match the parent gutter material:
•For Aluminum Gutters: Minimum 0.032-inch-thick sheet aluminum (ASTM B209).
•For Copper Gutters: Minimum 16 oz or 20 oz cold-rolled copper (ASTM B370).
•For Stainless Steel Gutters: Minimum 24-gauge Type 304/316 stainless steel (ASTM A240).
•Perforations: Precision-stamped holes (approx. 1/8-inch diameter staggered patterns) providing a minimum of 40% open area.
•Stiffening Ribs: Longitudinal v-bends or rolled structural stiffeners running the full length of each section to prevent sagging under wet leaf or snow loads.

1. Wire Downspout strainers- Mandatory at all outlets:

A) Regardless of whether continuous surface guards are installed, every downspout outlet drops/collector head must be fitted with an engineered wire strainer.

B) Removable balloon-type or beehive-type wire basket designed with compressible tapered prongs that slide securely into downspout drops.

1. Fasteners must be self-drilling, self-tapping screws with neoprene or EPDM sealing washers.

1. Contractor shall inspect existing gutters and fascia boards prior to installation. Verify that gutters are sloped continuously toward downspouts at a minimum rate of 1/16 inch per foot (1:192) without low pockets or ponding water.

1. Contractor shall completely flush and scrape all accumulated silt, biological growth, pine needles, and metal shavings from existing troughs and downspouts prior to fitting guards.

1. Any tree canopies or overhanging limbs within 10 feet of the roof perimeter have been trimmed back in accordance with NAVFAC Grounds Maintenance instructions.

1. Submittals:

A) Fastening schedules, attachment clip spacings, and expansion joint locations.

B) Wind-uplift engineering details verifying resistance to site-specific basic wind speed per ASCE 7. (This can be manufacturer’s specification) C) One 12-inch full-scale physical sample of each gutter screen/guard type proposed, complete with mounting clips, joining splices, and specified fasteners.

D) Materials specification

1. Quality control: This item should be developed at the time of contract specification development.

1. Contractor’s qualifications: The contractor must be qualified under NAICS 238160 (Roofing Contractors) or NAICS 238170 (Siding & Sheet Metal Contractors), or operate as an approved specialty subcontractor under a general construction prime (NAICS 236220)

1. Cost Estimate: The total cost (IGE) for the installation of DoW standard gutter guard for 3000 LF is $321,421 which means $107.14 per Liner feet.

image1.png image2.emf

Gutter guard installation.pdf

ESTIMATE FOR CONSTRUCTION CONTRACT DATE: 8 Oct 26

CONTRACT TITLE: Gutter Guard Eproject #:

FEAD OFFICE: NWS Earle

DESCRIPTION: Gutter Guard installation PRIME CONTRACTOR'S WORK Remarks:

1. Direct Materials 800.00$

2. Sales Tax on Materials 0.0% of line 1 0.00% -$

3. Direct Labor 7,650.00$

4. Insurance, Taxes, and Fringe Benefits 35.0% of line 3 35.00% 2,677.50$

5. Rental Equipment -$

6. Sales Tax on Rental Equipment 0.0% of line 5 0.00% -$

7. Equipment Ownership and Operating Expenses -$

8. SUBTOTAL (add lines 1 - 7) $ 11,127.50

9. Field Overhead (Direct Cost over time) 10.0% 10.00% 1,112.75$

10. SUBTOTAL (Add Lines 8 & 9) 12,240.25$

Prime Remarks:

SUBCONTRACTOR'S WORK

11. Direct Materials 41,700.00$

12. Sales Tax on Materials 0.0% of line 11 0.00% -$

13. Direct Labor 73,740.00$

14. Insurance, Taxes, and Fringe Benefits 35.0% of line 13 35.00% 25,809.00$

15. Rental Equipment 16,020.00$

16. Sales Tax on Rental Equipment 0.0% of line 15 0.00% -$

17. Equipment Ownership and Operating Expenses -$

18. SUBTOTAL (add lines 11 - 17) $ 157,269.00

19. Field Overhead 10.0% of line 18 10.00% 15,726.90$

20. Home Office Overhead 3.0% of line 18+19 3.00% 5,189.88$

21. SUBTOTAL (add lines 18, 19, & 20) $ 178,185.78

22. Profit (as determined) 7.0% 7.00% 12,473.00$

23. SUBTOTAL of Individual Subcontractor Proposals 190,658.78$

Sub's Remarks:

24. Prime Contractor's Work (from line 12) 12,240.25$

25. Sub-contractor's Work (from line 25) 190,658.78$

26. SUBTOTAL (add lines 26 & 27) 202,899.03$

27. 5.0% of line 27 5.00% 9,532.94$

28. Prime's Home Office Overhead 3.0% of line 26 3.00% 367.21$

29. Prime's Profit 5.8% of line 28 5.75% 11,666.69$

30. SUBTOTAL (add lines 26 - 29) 224,465.87$

31. Prime Contractor's Bond Premium 2.0% of line 32 2.00% 4,489.32$

32. SUBTOTAL (Add Lines 30 & 31) 228,955.19$

33. of line 34 0.00% -$

34. TOTAL COST (Add Lines 30 & 31) 262,153.69$ base access 7% of the labor 5,697.30$

267,850.99$

Estimated time extension and justification

CONTINGENCE 20% 53,570

TOTAL 321,421

Prime Contractor name:

Subcontractor name:

Notes:

This estimate is based on Market research and RSM

Signature & Title of preparer Date:

Azeb Hailu, P.E. 10/8/2026 Engineering Tech.

Prime's Overhead on subcontractor

File details come from the government source that posted it. Updated .