0200000 J Management and Administration v2.7.docx
DOCX document 749 KB Posted
- Attached to
- Gutter Cleaning and Maintenance Services
- Solicitation number
- N4008527R0033
About this file
This is a Management and Administration section (Section J) of a federal solicitation containing definitions, forms, attachments, and administrative requirements for gutter cleaning and maintenance services at Naval Weapons Station (NWS) Earle in Colts Neck and Leonardo, New Jersey.
The section establishes comprehensive administrative procedures and requirements for contract performance. Key deliverables and work are structured around two categories: recurring work (semiannual gutter and downspout cleaning for single-story and two-story buildings, plus service calls up to $250 and $500) and non-recurring work (gutter cleaning and minor maintenance, gutter replacement and installation, major gutter repairs, downspout replacement for one-story and two-story buildings, and gutter guard installation). The contract utilizes an Indefinite Delivery Indefinite Quantity (IDIQ) structure with a base period and multiple option periods, with pricing organized by Exhibit Line Item Numbers (ELINs). Recurring work ELINs include A001-A004 for the base period and B001-B004 for the first option period, with estimated quantities of 13,982 linear feet for single-story gutter cleaning and 11,579 linear feet for two-story buildings. Non-recurring work ELINs (A700-A706 and corresponding option period ELINs) specify quantities ranging from 50 to 3,000 linear feet depending on task type. The document mandates contractor compliance with extensive safety, environmental, and hazardous material management requirements, including submission of hazmat inventory logs, spill prevention plans, and incident reports. Administrative requirements include invoicing through Wide Area Work Flow (WAWF), monthly on-site labor reporting, performance assessment documentation, and property management procedures. The solicitation references wage determinations, FAR compliance, OSHA standards (EM 385-1-1), and Navy-specific directives for facilities management and environmental compliance. Unit pricing is required for labor hours and materials, with labor costs fully burdened to include indirect costs, overhead, and profit. The Department of the Navy Naval Facilities Engineering Command (NAVFAC) administers the contract through designated Contracting Officer Representatives and Performance Assessment Representatives who monitor technical compliance and performance metrics.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N4008527R00330001.pdf | ||
| Attachment J 0200000 08 Exhibit Line Item Numbers.xlsx | XLSX spreadsheet | |
| 0200000 F Management and Administration v2.9.docx | DOCX document | |
| Solicitation - N4008527R0033.pdf | ||
| 1503040 J Gutter Maintenance v2.1.docx | DOCX document | |
| 1503040 C Gutters Maintenance v2.1.docx | DOCX document | |
| 1503040 F Gutters Maintenance v2.1.docx | DOCX document | |
| 0200000 C Management and Administration v2.11.docx | DOCX document | |
| Gutter Guard installation brief Scope of Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section J – 0200000 Management and Administration Section J – 0200000 Management and Administration
| Attachment Number |
| Attachment Title |
| J-0200000-01 |
| Definitions and Acronyms |
| J-0200000-02 |
| Wage Determinations |
| J-0200000-03 |
| Directives, Instructions, and References |
| J-0200000-04 |
| Invoice Form |
| J-0200000-05 |
| Forms |
| J-0200000-06 |
| Government-Furnished Property, Materials, and Services |
| J-0200000-07 |
| Installation Spill Prevention, Control, and Countermeasure Plan |
| J-0200000-08 |
| Exhibit Line-Item Numbers (ELINs) |
Attachment J-0200000-01 Definitions and Acronyms
| Definition |
| Description |
| Assessment |
| A general term referring to either a survey or inspection of a facility to determine condition. |
| Asset |
| A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program. |
| Competent Person |
| A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment. |
One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them.
| Component Inventory Management Unit (CIMU) |
| An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance. |
| Confined Work Space |
| A space that is large enough and so configured that a person may bodily enter a space (such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency. |
| Construction Equipment |
| Construction equipment refers to specialized heavy machinery that covers one industry and is specifically designed for executing construction work. Construction equipment requirements shall include a list of equipment establishing the size, quality, number of units, and unit prices. Construction equipment prices provided by the Contractor shall be the lowest price available considering the availability of equipment and the time constraints of the job. The direct equipment price shall be adjusted by all discounts and rebates that accrue to the Contractor. |
All indirect cost associated with construction equipment, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance, general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the construction equipment price since the cost for these items were included in the labor hour unit price bid. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements shall not be included.
| Contracting Officer (KO) |
| That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer. |
| Contracting Officer’s Representative (COR) |
| The individual appointed by the KO is responsible for monitoring the Contractor’s technical compliance and progress, relative to assigned contract(s)/orders(s), based on the contract requirements specified in the PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work. Assignment as a COR is a collateral duty typically performed by the FSCM or SPAR. |
| Contractor |
| That entity or its representative is responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract. |
| Contractor Representative |
| That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract. |
| Crane, Category 1 |
| Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes. |
| Crane, Category 2 & 3 |
| Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds. |
| Crane, Category 4 |
| Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes. |
| Direct Material Costs |
| The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include sales tax and transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of direct materials, direct material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used. |
All other cost such as sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment, mobilization, demobilization, time for job preparation, safety standby personnel, payroll burdens and fringes, overtime, job (field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance, general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the direct material price since the cost for these items are included in the UPL Hour unit price bid.
| Electronic Operation And Maintenance And Support Information (eOMSI) |
| A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle. Generally, it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats. |
| Equipment |
| Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable. |
| Facility |
| A building or structure designed and created to serve a particular function. |
| Fixed Burden Rate (FBR) |
| The additional costs (expressed in percent of direct material cost) for ordering, handling, and stockpiling materials and repair parts. For example, if the offeror's Fixed Burden Rate for materials in the Base Period is 10% then: |
$100,000.00 + ($100,000.00 x 10%) = $110,000.00
The Government will compensate the Contractor for the required parts and materials and not the total amount shown in Schedule of Indefinite Delivery Indefinite Quantity Work.
| Frequency Of Service |
| Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days. |
Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.
Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.
Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.
Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.
Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.
Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.
Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.
Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.
Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.
Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.
| Government Furnished Property (GFP) |
| Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract. |
| Hazardous Material (HM) |
| A material that because of its quality, concentration, physical, chemical or infectious nature may pose a threat to human health or the environment if released or spilled into the environment or any material designated by the Department of Transportation (DOT) or any materials that require a SDS form as posing a potential threat while being transported. Hazardous materials are listed in 49 CFR Part 172. |
| Hazardous Waste (HW) |
| Any discarded solid waste (liquid, semi-solid, solid, or gaseous) that meets the definition of a hazardous waste by USEPA, state authorities, or the Navy. In accordance with RCRA, a solid waste is a listed hazardous waste if it is specifically listed, or it is a characteristic hazardous waste if it exhibits the characteristics of ignitability, corrosivity, reactivity, or toxicity. |
| Hazardous Waste Management Plan |
| In accordance with OPNAVINST 5090.1C, every Navy shore activity that generates HW shall develop and use a Hazardous Waste Management Plan or a Hazardous Waste management component in its P2 Plan and EMS. A Hazardous Waste Management Plan shall: |
· Identify applicable federal, state, and local regulations pertaining to the generation and management of hazardous waste.
· Identify training requirements and describe procedures for obtaining training and maintaining training records.
· Assign responsibilities for the generation, designation, handling, storage, treatment, disposal, and all documentation.
· Describe all hazardous waste generation and management procedures.
· Include or reference the hazardous waste minimization plan and goals.
· Include or reference contingency plans and emergency response procedures.
The plan shall be kept up to date to include changes in hazardous waste generation and management procedures, as well as changes in applicable federal, state, and local hazardous waste regulations. The plan shall include or reference minimization procedures sufficient to achieve DOD minimization goals. Tenant activities are covered by the host CO's Hazardous Waste Management Plan.
| Hazardous Waste Manifest |
| A hazardous waste manifest as defined in 40 CFR 260 is required for the transport of hazardous waste. The installation commanding officer (ICO) or the ICO’s designated representative shall retain signature authority for hazardous waste manifests. |
| Infrastructure Condition Assessment Program (ICAP) |
| A Navy automated data management program that utilizes historical asset lifecycle data and a structured assessment process to evaluate the condition facilities and their components. |
| Inspection |
| A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair. |
| Integrated Maintenance Program (IMP) |
| IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service orders will not be issued for accomplishment of repairs on systems and equipment maintained under IMP. |
| Job or Work Order |
| An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation. |
| Life-Cycle Costs |
| A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life. |
| Less-than-90-day Accumulation Areas or Storage Facilities |
| Temporary HW storage areas where HW may be stored for up to 90 days without a RCRA permit. |
| Maintenance and Repair |
| The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair. |
| Monthly On-Site Labor Report |
| A compilation of all Contractor and subcontractor employee-hours involved in delivering contract services on a Government property. |
| NAVFAC MAXIMO |
| A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by NAVFAC for enterprise facility asset data management. The terms “MAXIMO”, “NAVFAC MAXIMO” or “Government’s MAXIMO” shall be used interchangeably in the document. |
| Non-RCRA Regulated Waste |
| Waste that is not regulated as a hazardous waste under RCRA; however, is waste may be regulated by other federal, state or local regulations including but not limited to TSCA, Clean Air Act, Clean Water Act or other regulations and statues. Examples include Used Oil, Universal Waste, Oily Water, antifreeze, etc. |
Non-RCRA regulated waste (while not meeting the definition of a Hazardous Waste) must be managed according to its applicable regulations and may not be discarded into the general trash.
| Non-Regulated Solid Waste (Debris and Rubbish) |
| Waste not associated with an industrial process such as refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food. Non-hazardous construction and demolition wastes such as dimension and non-dimension lumber, plywood, chipboard, and hardboard are included. |
| Partnering |
| The terms “partnering” and “partnership” used herein shall mean a relationship of open communication and close cooperation that involves both Government and Contractor personnel working together for the purpose of establishing a mutually beneficial, proactive, cooperative environment within which to achieve contract objectives and resolve issues and implementing actions as required. |
| Performance Assessment |
| A method used by the Government to provide some measure of control over the quality of purchased goods and services received. |
| Performance Assessment Representative (PAR) |
| The individual(s) assigned as a Technical Point of Contact (TPOC) / Subject Matter Expert (SME) to the COR to perform duties as the on-site representative who assesses Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on PAWs and the MPAS, and communicates findings as necessary with the Contractor, SPAR, and COR. |
| Pre-Expended Bin Materials And Supplies |
| The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less. Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint. |
| Property Administrator |
| An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract |
| Property Management Program |
| A Government program established for the purpose of reviewing and approving the Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor. |
| Quality Assurance (QA) |
| The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled. |
| Quality Control (QC) |
| The observation techniques and activities used to fulfill requirements for quality. |
| R. S. Means |
| A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means". |
| Real Property |
| Land and improvements to land (i.e., facilities). It includes equipment affixed and built into the facility as an integral part of the facility (such as heating systems), but not movable equipment (e.g., plant equipment, industrial equipment, buoys). |
| Real Property Inventory Equipment (RPIE) |
| A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and elevators). It is physically attached to, integrated into, and built in or on the property. |
Individual RPIE’s can be combined to make a CIMU to facilitate facilities management. An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.
| Regulated Waste |
| Any hazardous, non-hazardous, industrial process waste (aka special waste), e-waste, and/or off-specification HM, which because of its physical characteristics, chemical make-up or biological nature requires either special handling procedures and permitting, or poses an unusual threat to human health, equipment, property, or the environment. Examples include (but are not limited to) liquid sludge, pastes, and/or filter cakes, chemical compounds and/or petroleum products, fine powders or highly dusty materials, spent blast media and/or grit, demolition wastes from industrial facilities, debris and/or residues from spill cleanup work, underground storage tank remediation materials, pollution control wastes, ash from fires, furnaces, boilers or incinerators, off-specification products, other materials that have the potential to be a hazardous waste. All RW may be used or unused excess hazardous materials. Laboratory analysis may be required to verify the waste is not a RCRA-regulated hazardous waste. |
| Response Time |
| The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required. |
| Restoration |
| Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes. |
| Sampling Plan |
| Plan and procedures to conduct sampling, field testing and laboratory analysis for a defined testing objective. |
| Satellite Accumulation Areas |
| Designated approved areas, at or near the point of generation and under the control of the operator generating the waste, where no more than 55 gallons (cumulative total) of all types of HW or 1 quart of acutely HW may be accumulated. The 55-gallon limit does not include non RCRA regulated waste, universal waste and used oil etc. |
| Spill Prevention Control and Countermeasure (SPCC) Plan |
| The SPCC Plan establishes engineering controls including procedures, methods, equipment and other requirements to prevent the discharge of oil into or upon navigable waters. The Plan includes procedures for oil spill prevention, measures to contain spills and an established spill drill exercises to ensure effective countermeasures in the event of oil spill. |
| Sustainment |
| Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities. |
| System |
| An assemblage of mechanically and/or electrically interlocked parts, equipment and/or components forming a unitary whole. |
| Unit Priced Labor (UPL) Hour |
| The fully burdened unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit priced labor hour price shall include all indirect and direct costs associated with performing work, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, wage determinations, union agreements, crew sizes, hand tools, equipment, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance, general and administrative (home office) overhead, profit, and all other associated markups. Any indirect cost or additional markups not allowed in the definition of direct materials shall be included in the UPL price. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included. |
| Uniformat Classification |
| A standard classification of building components established by the National Institute of Standards and Technology. |
| Universal Equipment |
| Universal equipment refers to equipment that can cover two or more industries and is commercially employed in execution of operation, maintenance, and repair work, such as: Aerial Work Platforms, Backhoes, Cranes, Dump Trucks, Excavators, Generators, Graders, Lifts, Loaders, Man Lifts, Monitoring and Test Equipment, Pumps, Tractors, Trailers, etc. |
| Universal Waste (UW) |
| Universal Waste (UW) (defined in 40 CFR Part 273) means batteries, fluorescent lamps, some pesticides, and mercury-containing equipment formally classified as a HW, but that are now subject to less stringent regulations, when recycled if recycling is available. |
| Utility Infrastructure Condition Assessment Program (UICAP) |
| A comprehensive assessment processes for planning, managing, and executing Navy utility infrastructure inspections. |
Attachment J-0200000-01 Definitions and Acronyms
| Acronym |
| Title |
| ACO |
| Administrative Contracting Officer |
| AFFF |
| Aqueous Film Forming Foam |
| BFR |
| Basic Facility Requirements |
| BW |
| Biweekly |
| CBMM |
| Condition Based Maintenance Management Program |
| CDR |
| Contract Discrepancy Report |
| CIA |
| Controlled Industrial Area |
| CIMU |
| Component Inventory Management Unit |
| CMMS |
| Computerized Maintenance Management System |
| CNSSI |
| Committee on National Security Systems Instruction |
| COR |
| Contracting Officer Representative |
| COR |
| Condition of Readiness |
| DBH |
| Diameter at Breast Height |
| DCR |
| Direct Condition Rating |
| DoD |
| Department of Defense |
| DoDI |
| Department of Defense Instruction |
| DoN |
| Department of Navy |
| DRMO |
| Defense Reutilization Management Office |
| EPA |
| Environmental Protection Agency |
| EPCRA |
| Emergency Planning and Community Right-to-Know Act |
| FAR |
| Federal Acquisition Regulation |
| FFP |
| Firm Fixed Price |
| FIFRA |
| Federal Insecticide, Fungicide, and Rodenticide Act |
| FSC |
| Facility Support Contract |
| FSCM |
| Facility Support Contract Manager |
| GIS |
| Geospatial Information System |
| GFE |
| Government-furnished Equipment |
| GFF |
| Government-furnished Facilities |
| GFM |
| Government-furnished Materials |
| HCA |
| Head Contracting Agency |
| ICAP |
| Infrastructure Condition Assessment Program |
| ICP |
| Integrated Contingency Plan |
| IDIQ |
| Indefinite Delivery Indefinite Quantity |
| iNFADS |
| Internet Navy Facilities Asst Data Store |
| IPM |
| Integrated Pest Management |
| IPMIS |
| Integrated Pest Management Information System |
| IPMP |
| Integrated Pest Management Plan |
| KO |
| Contracting Officer |
| LAN |
| Local Area Network |
| M |
| Monthly |
| MAP |
| Maintenance Action Plan |
| MDI |
| Mission Dependency Index |
| MEP |
| Mechanical, Electrical and Plumbing |
| MILCON |
| Military Construction |
| MPAS |
| Monthly Performance Assessment Summary |
| MRI |
| Mission Readiness Index |
| MSDS |
| Material Safety Data Sheets |
| NAVFAC |
| Naval Facilities Engineering Command |
| NIST |
| National Institute of Standards and Technology |
| NIST SP |
| National Institute of Standards and Technology Special Publication |
| NMCI |
| Navy Marine Corps Intranet |
| NOSC |
| Navy-On-Scene Coordinator |
| PAP |
| Performance Assessment Plan |
| PAR |
| Performance Assessment Representative |
| PAW |
| Performance Assessment Worksheet |
| PEO |
| Program Executive Officer |
| PM |
| Project Manager |
| PM |
| Planned Maintenance or Preventative Maintenance |
| POAM |
| Plan of Action and Milestones |
| PRCSP |
| Permit Required Confined Space Program |
| PWS |
| Performance Work Statement |
| PWO |
| Public Works Officer |
| Q |
| Quarterly |
| QC |
| Quality Control |
| RSIP |
| Regional Shore Infrastructure Plan |
| RPIE |
| Real Property Inventory Equipment |
| RSL |
| Remaining Service Life |
| SC |
| Security Clearances |
| SM |
| Semimonthly |
| SPAR |
| Senior Performance Assessment Representative |
| TE |
| Technical Exhibit |
| VIQ |
| Variation in Quantity |
| WBS |
| Work Breakdown Structure |
Attachment J-0200000-02 Wage Determinations
Placeholder for Collective Bargaining Agreements, Service Contract Labor Standards and Wage Rate Requirements. Located in Solicitation.
Attachment J-0200000-03 Directives, Instructions, and References
| Reference |
| Title |
| CNSSI 1253 |
| Security Categorization and Control Selection for National Security Systems |
| DoD Directive 5200.2 |
| DoD Personnel Security Program (PSP) |
| DoDI 8582.01 |
| Security of Unclassified DoD Information on Non-DoD Information Systems |
| DODD 6055.9 |
| DoD Explosives Safety Management and the DoD Explosives Safety Board |
| EM 385-1-1 |
| U.S. Army Corps of Engineers Safety and Health Requirements |
| NAVFACINST 4161.1 |
| Accountability, Tracking, and Management of Government-Furnished Property |
| NAVFACINST 11010.45 |
| Regional Planning Instruction (Site Approval Process) |
| NAVFAC P-78 |
| Real Property Inventory Procedures Manual |
| NIST SP 800-171 Revision 1 |
| Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations |
| NIST SP 800-53 |
| Security and Privacy Controls for Federal Information Systems and Organizations |
| OPNAVINST 11000.16 |
| Command Responsibility for Shore Activity Land and Facilities |
| OPNAVINST 11010.20 |
| Navy Facilities Projects |
| OPNAVINST 11011.10 |
| Utilization of Navy Real Property |
| P.L. 91-596 |
| Occupational Safety and Health Act |
| SECNAVINST 11011.47 |
| Acquisition, Management, and Disposal of Real Property and Real Property Interests by the Department of the Navy |
| UFC 2-000-5N |
| Facility Planning Criteria for Navy/Marine Corps Shore Installations |
| UFC 3-560-01 |
| Operation and Maintenance: Electrical Safety |
Attachment J-0200000-04 Invoice Form
Should be identical to ELINs worksheet. Invoice should be revised by changing the quantity from 12 MO to 1 MO and include the quantity of Service Order completed versus 1/12th of quantity included in the period of performance.
The Contractor shall possess the capability to invoice and receive payment for work via Wide Area Work flow (WAWF). WAWF is a Paperless Contracting DoD-wide application designed to eliminate paper from the receipts and acceptance process of the DoD contracting lifecycle. The goal is to enable authorized Defense contractors and DoD personnel the ability to create invoices and receiving reports and access contract related documents.
In the traditional DoD business method, three documents are required to make a payment - the contract, the receiving report and the invoice. Each of these may arrive at the payment office separately - if they are paper. They are processed individually as they arrive. Information is then manually keyed into the payment system. Using WAWF, electronic documents are shared, eliminating paper and redundant data entry. Data accuracy is increased and the risk of losing a document is greatly reduced.
The contract is available through a seamless interface with an application called Electronic Document Access (EDA). Contractors have electronic options for submitting invoices and receiving documents. They can submit documents on the Web, through FTP, or through EDI.
WAWF supports DoD's efforts to reduce unmatched disbursements in the DoD receipt, acceptance, entitlement and payment process through data sharing and electronic processing. The benefits to DoD are global accessibility of documents, reduced need for re-keying, improved data accuracy, real-time processing, and secure transactions with audit capability. For vendors, benefits include the capability to electronically submit invoices, reduction of lost or misplaced documents, and online access to contract payment records.
Attachment J-0200000-05 Forms
Attachment J-0200000-05 Forms
Company Name:
Date Submitted:
Labor Hours for the Month of:
ELIN/
Sub-ELIN Annex/ Sub-annex
| Spec Item |
| Description |
Spec Items 3.1, 3.2 and
3. 3 On-Site Labor Hours
1501000
RECURRING
| A001 |
| 1501000 |
| 3.1 and 3.2 |
| Semiannual Gutter and Downspout cleaning Single Story Building |
| A002 |
| 1501000 |
| 3.1 and 3.2 |
| Semiannual Gutter and Downspout cleaning Two Story Building |
| A003 |
| 1502000 |
| 3.3 |
| Service Call - Up to $250 |
| A004 |
| 1502000 |
| 3.3 |
| Service Call - Up to $500 |
Total Recurring Work:
Company Name:
Date Submitted:
Labor Hours for the Month of:
ELIN/
Sub-ELIN
| Order Number Task Order |
| Description |
Labor Hours
NON-RECURRING
A700
GUTTER CLEANING AND MINOR MAINTENANCE
A701
GUTTER REPLACEMENT AND INSTALLATION
A702
GUTTER REPAIRS (MAJOR)
A703
DOWNSPOUT REPLACEMENT AND INSTALLATION (1-STORY)
A704
DOWNSPOUT REPLACEMENT AND INSTALLATION (2-STORY)
A705
Labor & Material Costs - MUST BE NEGOTIATED BY KO
Total Non-Recurring Work:
Directions for Process Material Log Sheets
Chemical Description:
· Material Name - List the brand or generic name of the chemical material.
· Manufacturer - List the name of the manufacturer of the product.
· Constituents of Concern - List the constituents (ingredients) as listed on the Material Safety Data Sheet (MSDS).
· CAS # - List the Chemical Abstract Service (CAS) Number for each Constituent of Concern listed. This information is found on the MSDS. If no CAS number is listed, state “N/L”.
· % - List the concentration of each Constituent of Concern listed. This information is found on the MSDS. If the concentration is not listed, state “N/L”.
· Product Weight - List the weight of material contained in one container of the product. This information is normally listed on the MSDS or can be determined from the density or specific gravity of the product listed on the MSDS.
· In addition, check all the boxes that apply to this chemical:
· Pure or Mix - choose only one.
· Solid, Liquid or Gas - choose only one.
· Extremely Hazardous Substance (EHS), Ozone Depleting Substance (ODS), SARA TITLE III Chemical (SARA III), Air Toxic Chemical (AIR TOX) or Carcinogen
· (CARC) - based on the information provided by the material’s MSDS. Choose all that apply.
· HM exempt - per EPCRA section 312 and based upon user knowledge, choose this box if the material would normally be exempt from reporting for hazardous material storage.
· Tri exempt - per EPCRA section 313 and based upon user knowledge, choose this box if the material would normally be exempt from reporting for the Toxic Release Inventory (TRI).
Physical and Chemical Hazards:
· For each material listed, check all the physical and health hazard boxes that apply. These hazard categories are defined in 40 CFR 370.2.
· Fire Hazard - flammable, combustible liquid, pyrophoric, oxidizer.
· Sudden Release of Pressure - explosive, compressed gas.
· Reactive - unstable reactive, organic peroxide, water reactive.
· Immediate (acute) Health Hazard - highly toxic, toxic, irritant, sensitizer, corrosive.
· Delayed (chronic) Health Hazard - carcinogens, mutagens, other long-term health hazards.
Storage Description: Storage Code:
· List the appropriate storage type, pressure and temperature condition codes for the material based upon the codes listed below. List the storage type in the first box, the applicable pressure code in the second box and the applicable temperature code in the third box. More than one storage code may apply if material is stored in different types of containers.
Storage Type:
A - Above Ground Storage Tank F Can L Cylinder B - Below Ground Storage Tank G Carboy M Glass Bottle or Drum C - Tank Inside Building I Fiber Drum N Plastic Bottle or Drum D - Steel Drum J Bag R Other E - Plastic/Non-metallic Drum K Box
Pressure and Temperature Conditions:
1 - Ambient Pressure 4 Ambient Temperature 2 - Greater than Ambient Pressure 5 Greater than Ambient Temperature 3 - Less than Ambient Pressure 6 Less than Ambient Temperature but not Cryogenic 7 - Cryogenic Conditions
Inventory in Pounds:
· Maximum Amount - List the maximum amount of a material that was on-hand (stored) at any one time. Amount must be recorded in pounds.
· Average Amount - List the average amount of material that was on-hand during the reporting period. Amount must be recorded in pounds.
· Days on Site - List the number of days during the reporting period each material was on-site. If the material was present for the whole year, record as 365.
Amount Used in Pounds:
· List the amount of each material used during the reporting period. Amount must be recorded in pounds. Amount used is the best estimate based on the contractor material tracking system.
Contractor Hazardous Material Inventory Log
(EPRCA)
PRIME COMPANY NAME: _______________________________CONTRACT NO: ______________________
PROJECT TITLE / LOCATION: _________________________________________________________________
| Material Name |
| Manufacturer |
| SDS Number |
| State |
(Liquid, Solid, Gas)
| Storage Quantity |
| Quantity (lbs./gals) used in Calendar Year [ ] |
| Average Daily |
| Maximum Daily |
Contractor(s) certifies that the hazardous material(s) removed from installation will be used/reused for its intended purpose.
Company Using Material Listed Above Company Representative’s Signature
Submitted By: ________________________ Phone: ______________ Fax: __________ Date: _________ Printed Name
Contracting Officer _____________________Phone: ______________ Fax: __________ or ROICC Representative
Page ____ of ____
SECTION 01 57 19.00 20 – APPENDIX A
Totals:
| Product Name (Manufacturer’s Name & Product Identification Name Or Number) |
| CONTRACTOR: |
| VOC/HAP Tracking Form |
Emission Data
Product Type (I.E. Paint, Solvent, Adhesive) Usage (I.E. Surface Prep, Or Clean-Up)
AUL
Unique Identifier Number
Quantity Used (Gal)
Product Density (Lb./Gal.)
VOC
Content (lb./gal.)
Total VOC Weight (lbs.)
REPORTING PERIOD (Month):
HAP Name (NONE if none present in product)
% Weight of HAP in Product
Weight of HAP (lbs.) (N/A if NONE present)
Attachment J-0200000-06 Government-Furnished Property, Materials, and Services
Electricity and Water will be provided by the Government.
Attachment J-0200000-07 Installation Spill Prevention, Control, and Countermeasure Plan
Contact NWS Environmental Division for current spill control plan - (732) 866-2540
Attachment J-0200000-07 Contractor Hazardous Material Inventory Log
Attachment J-0200000-08 Exhibit Line-Item Numbers (ELINs)
ELINs can be found in attachment #.J-0200000-08 ELIN image1.emf
Contractor Significant Incident Report (CSIR).pdf
Contractor Significant Incident Report (CSIR) 1
Initial Report
Follow-up Report
Final Report
Contractor Significant Incident Report (CSIR)
1. General Information Contracting Activity/ROICC Office:
Accident Classification:
InjuryFatalityEnvironmentProcedural IssuesLessons Learned
IllnessProperty DamageOther______________________________
Involving:
Confined Space Equip/Mrt Ver/Mat Handling (Heavy Construction Equip.) Hazardous Material
Crane and Rigging Equip/Mrt Ver/Mat Handling (Material Handling) Trenching/Excavation
Diving Equip/Mrt Ver/Mat Handling (Man-Lift/Elevated Platform) Waterfront/Marine
Demolition/Renovation Fall from Ladder Fall from Scaffold Other___________________
Electrical Fall from Roof Fire
2. Personal Information Name (Last, First, MI):
Age: Sex:
Job Title/Description:
Employed By:
Supervisor Name (Last, First, MI) & Title:
Was the person trained to perform this activity/task?
Yes No
What type of training was received (OJT, classroom, etc)?
Date of the most recent formal training and topics discussed?
3. Witness Information Witness #1: Name (Last, First, MI):
Supervisor Name (Last, First, MI):
Witness #2: Name (Last, First, MI):
Supervisor Name (Last, First, MI):
Contractor Significant Incident Report (CSIR) 2
Additional Witnesses: YesNo ( List any additional witnesses on a separate sheet and attach. )
4. Contract Information Type of Contract:
A/EBOSCLEANConstructionDesign BuildFSCCFSSC
JOCRACServiceOther_______________________________
Contract Number & Title:
Industrial Group & Industrial Type:
Prime Contractor Name/Address/Phone & Fax No:
Safety Manager (Last, First, MI):
Insurance Carrier:
Sub Contractor Name/Address/Phone & FAX No:
Safety Manager (Last, First, MI):
Insurance Carrier:
5. Accident Description Date of Accident: Time of Accident: Exact Location of Accident:
Describe the accident in detail in your words: (Use the back of page if you need additional space)
Contractor Significant Incident Report (CSIR) 3
Direct Cause(s) of Accident:
Indirect Cause(s) of Accident:
Action(s) taken to prevent re-occurrence or provide on-going corrective actions:
Corrective Action Beginning Date:
Anticipated Completion Date:
Personal Protective Equipment:
Available and usedAvailable and not usedNot Required
Not related to MishapWrong PPE for job
List PPE Used:
Type of Construction Equipment (Make, Model, Serial #, VIN#) Involved:
Was Hazardous Material Spilled/Released? Yes No Please List
Hazardous Material(s) Involved:
Who provided first aid or cleanup of mishap site?
Contractor Significant Incident Report (CSIR) 4
Any blood-borne pathogen exposure, other than EMTs? Yes No
Who?
List OSHA and WM-385-1-1 standards that were violated:
Was site secured and witness statements taken immediately? Yes No
By Whom?
Contractor Significant Incident Report (CSIR) 5
6. Injury Illness/Fatality Information Severity of Injury/Illness:
Fatality Lost Workday Case Involving Days Away From Work
Temporary DisabillityRecordable Workday Case Involving Restricted Duty
Permanent Total DisabilityOther Recordable CaseRecordable First Aid Case
Permanent Partial DisabilityNon-Recordable CaseNo Injury
Estimated Days Lost:
Estimated Days Hospitalized: Estimated Days Restricted Duty:
List Primary Body Part Affected:
List Other Body Part(s) Affected:
Nature of Injury/Illness for Primary Body Part (Examples: Amputation, Burn, Hernia):
Type of Accident (Examples: Fall same level, Lifting, Bitten, Exerted):
Source of Accident (Examples: Crane, Carbon Monoxide, Ladder, Welding Equipment):
7. Casual Factors (Explain answers on supplementary sheet)
• Design – Design of facility, workplace, or equipment was a factor? Yes No
• Inspection/Maintenance – Inspection & Maintenance procedures were a factor? Yes No
• Persons Physical Condition – In your opinion, the physical condition of the person was a factor?
• Operation Procedures – Operating procedures were a factor? Yes No
• Job Practices – One or more job safety/health practices not being followed when the accident occurred contributed to the accident?
• Human Factors – One or more human factors, such as a person’s size or strength contributed to the accident?
• Environmental Factors – Heat, cold, dust, sun, glare, etc., contributed to the accident?
• Chemical and Physical Agent Factors – Exposure to chemical agents, such as dust, fumes, mist, vapors, or physical agents such as noise, radiation, etc., contributed to the accident?
• Office Factors – Office setting such as lifting office furniture, carrying, stooping, contributed to the accident?
• Support Factors – Inappropriate tools/resources were provided to perform the task?
• PPE – Improper selection, use or maintenance of PPE contributed to the
• Drugs/Alcohol – In your opinion, were drugs or alcohol a factor? Yes No
• Job Hazard Analysis – The lack of an adequate (IAW-EM-385-1-1 Sec 01.A) activity hazard analysis was a contributing factor.
• Job Hazard Analysis – JHA was not site specific and/or did not address the type of work/operations performed when the mishap occurred.
• Management – A lack of adequate supervision contributed to the accident. Yes No
Contractor Significant Incident Report (CSIR) 6
8. OSHA Information
Date OSHA was Notified:
Date(s) of Investigation: Date of citation:
(Attach Copy)
Dollar amount of Penalties:
9. Report Preparer
Name (Last, First, MI):
Date of Report:
Title:
Employer:
Phone #:
Signature:
• Management – Inadequate information was provided at pre con meeting. Yes No
Contractor Significant Incident Report (CSIR) Instructions 1
CONTRACTOR SIGNIFICANT INCIDENT REPORT (CSIR) INSTRUCTIONS
Complete Sections Appropriate to Incident (Rev. 06/02).
NOTE: THE ATTACHED CSIR FORM IS TO BE USED BY CONTRACTORS TO RECORD THE
RESULTS OF THEIR ACCIDENT/INCIDENTS INVESTIGATIONS AND SHALL BE PROVIDED TO THE
CONTRACTING OFFICER WITHIN THE REQUIRED TIMEFRAMES.
GENERAL. Complete a separate report for each person who was injured in the accident. A report needs to be completed for all OSHA recordable accidents, property damage in excess of $2000.00 (This amount is for record purposes only. GOV is not required to enter property damage reports into FAIR database if it is less than $10,000.00.), WHE accidents, or near miss/high visibility mishaps. Please type or print legibly. Appropriate items shall be marked with an “X” in box(es), non-applicable sections shall be marked “N/A”. If additional space is needed, provide the information on a separate sheet of paper and attach to the completed form.
Mark the report:
INITIAL – If this form is being used as initial notification of a Fatality or High Visibility Mishap. The initial form is due within 4 hours of a serious accident. A form marked ‘Follow-up’ or ‘Final’ is required within 5 days.
FOLLOW-UP – If you are providing additional information on a report previously submitted. FINAL
– If you are providing a completed report and expect no changes.
SECTION 1 – GENERAL INFORMATION
CONTRACTING ACTIVITY/ROICC OFFICE - Enter the name and address of the Contracting Office administering the contract under which the mishap took place (e.g. ROICC MCBH, ROICC NORFOLK, PWC GUAM, etc.).
ACCIDENT CLASSIFICATION - INJURY/ILLNESS/FATALITY/PROPERTY DAMAGE/-PROCEDURAL ISSUES/- ENVIRONMENTAL/LESSONS LEARNED/OTHER – Mark the appropriate block(s) if the incident resulted in any of these conditions.
INVOLVING - If the mishap involved any of the conditions listed under “Involving” mark the appropriate box(es). Specific questions associated with each of these conditions are available from the Contracting Officer to assist you in your investigation. When these questions are used they shall be attached as part of this report.
SECTION 2 - PERSONAL INFORMATION
NAME - Enter last name, first name, middle initial of person involved.
AGE - Enter age.
SEX - Enter M for Male and F for Female.
JOB TITLE/DESCRIPTION - Enter the job title/description assigned to the injured person (e.g. carpenter, laborer, surveyor, etc.).
EMPLOYED BY - Enter employment company name of the person involved.
SUPERVISOR’S NAME & TITLE - Enter name and title of the immediate supervisor.
WAS PERSON TRAINED TO PERFORM ACTIVITY/TASK? - For the purpose of this section “trained” means the person has been provided the necessary information (either formal and/or on-the-job (OJT) training) to competently perform the activity/task in a safe and healthful manner.
TYPE OF TRAINING - Indicate the specific type of training (classroom or on-the-job) that the injured person received before the accident happened.
DATE OF MOST RECENT FORMAL TRAINING/TOPICS DISCUSSED - Enter the month, day, and year of the last formal training completed that covered the activity/task being performed at the time of the accident. List topics that were discussed at the training identified above.
SECTION 3 - WITNESS INFORMATION
The following applies to Witness #1 and Witness #2:
WITNESS NAME - Enter last name, first name, middle initial of the witness.
JOB DESCRIPTION/TITLE - Enter the job title/description assigned to the witness (e.g. carpenter, laborer, surveyor, etc.).
EMPLOYED BY - Enter the name of the employment company of the witness.
SUPERVISORS NAME - Enter name of immediate supervisor of the witness.
ADDITIONAL WITNESSES - Provide same information, as above, for each witnesses. Use additional pages if necessary.
SECTION 4 - CONTRACTOR INFORMATION
TYPE OF CONTRACT - Mark appropriate box. A/E means architect/engineer. If “OTHER” is marked, specify type of contract on line provided.
CONTRACT NUMBER/TITLE - Enter complete contract number and tile of prime contract (e.g. N62477-85-C-0100, 184 Pearl City Hsg. Revitalization).
CONSTRUCTION INDUSTRIAL GROUP AND INDUSTRIAL TYPE – This is the type of construction that will be done at this project.
Contractor Significant Incident Report (CSIR) Instructions 2
1. First, you must choose the Industrial Group. You have 4 choices to choose from: (NOTE! Review of the Industrial Types below and knowing what the projects scope of work is will assist you in deciding what the Industrial Group should be.)
a. Buildings
b. Heavy Industrial
c. Infrastructure
d. Light Industrial
2. Once you have chosen the Industrial Group, you now select the Industrial Type. You have multiple choices under each Group, chose the one you feel fits the project most closely because on most projects there won’t be an exact match: a.
Buildings:
(1) Communications Ctr.
(2) Dormitory/Hotel
(3) High-rise Office
(4) Hospital
(5) Housing
(6) Laboratory
(7) Low-rise Office
(8) Maintenance Facility (9) Parking Garage
(10) Physical Fitness Ctr.
(11) Restaurant/Nightclub
(12) School
(13) Warehouse
b. Heavy Industrial:
(1) Chemical Mfg.
(2) Electrical (Generating)
(3) Environmental
(4) Metals Refining/Processing
(5) Mining
(6) Natural Gas Processing
(7) Oil Exploration/Production
(8) Oil Refining
(9) Pulp and Paper
c. Infrastructure:
(1) Airport
(2) Electrical Distribution
(3) Flood Control
(4) Highway
(5) Marine Facilities
(6) Navigation
(7) Rail
(8) Tunneling
(9) Water/Wastewater
d. Light Industrial:
(1) Automotive Assembly/Mfg.
(2) Consumer Products Mfg.
(3) Foods
(4) Microelectronics Mfg.
(5) Office Products Mfg.
(6) Pharmaceuticals Mfg.
CONTRACTOR’S NAME/ADDRESS/PHONE NUMBER
(1) PRIME - Enter the exact name (title of firm), address, phone and fax numbers of the prime contractor.
(2) SUBCONTRACTOR - Enter the exact name, address, phone and fax numbers of any subcontractor involved in the accident.
SAFETY MANAGER’S NAME
(1) PRIME - Enter the name of the prime contractor safety manager.
(2) SUBCONTRACTOR - Enter the name of the subcontractors safety manager. INSURANCE CARRIER
(1) PRIME - Enter the exact name/title of the prime’s insurance company. Policy number not required.
(2) SUBCONTRACTOR - Enter the exact name of the subcontractor’s insurance company. Policy number not required.
SECTION 5 - ACCIDENT DESCRIPTION
DATE OF ACCIDENT - Enter the month, day, and year of accident.
TIME OF ACCIDENT - Enter the local time of accident in military time. Example: 14:30 hrs (not 2:30 p.m.).
EXACT LOCATION OF ACCIDENT - Enter facts needed to locate the accident scene…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .