This is an Exhibit Line Item Numbers document that establishes the contract line item numbers (CLINs) and pricing structure for gutter cleaning and maintenance services at Naval Weapons Station Earle in Colts Neck and Leonardo, New Jersey under solicitation N40085-26-Q-XXXX. The contract is structured as an Indefinite Delivery, Indefinite Quantity (IDIQ) fixed-price agreement with a base period and four option periods.

The pricing structure includes recurring and non-recurring work elements across all contract periods. Recurring work (CLINs A001-A004, B001-B004, C001-C004, D001-D004, E001-E004) covers semiannual gutter and downspout cleaning services for single-story and two-story buildings, measured in linear feet, plus service calls up to $250 and $500. Non-recurring work (CLINs A700-A706, B700-B706, C700-C706, D700-D706, E700-E706) includes gutter cleaning and minor maintenance (50 LF), gutter replacement and installation (3,000 LF), major gutter repairs (2,000 LF in base period and subsequent periods), downspout replacement and installation for one-story and two-story buildings (30 EA each), and gutter guard installation (3,000 LF). A labor and material cost line item (A705, B705, C705, D705, E705) is designated as a lump sum requiring negotiation by the Contracting Officer using the ETO process. Unit prices must be provided for all line items, with labor and material costs for work not included in enumerated ELINs subject to Contracting Officer negotiation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roll Up

N40085-27-D-XXXX
Gutter Maintenance
NWS EARLE
BaseFirst Option
FFPFFP
IDIQIDIQ
Total$0.00Total$0.00
2nd Option3rd Option
IGE
FFPFFP
IDIQIDIQ
Total$0.00Total$0.00

4th Option

FFP
IDIQ
Total$0.00
TOTAL
FFP
IDIQ
TOTAL

ELINs-Base Period-Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-26-Q-XXXX
EXHIBIT A - CLIN 9000
Line Item 0001 Recurring Work - Base Period
PROVIDE PRICES TO PROVIDE OTHER (Gutter Maintenance)- RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 thru A004
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
A001 - REGION Spec Item 3
A001Semiannual Gutter and Downspout cleaning Single Story Building (Section C, Spec Item 3.1 and 3.2)13,982LF$$9290
A002Semiannual Gutter and Downspout cleaning Two Story Building (Section C, Spec Item 3.1 and 3.2)11,579LF$$9290
A003Service Call - Up to $250 (Section C, Spec Item 3.3)4EA$$9290
A004Service Call - Up to $500 (Section C, Spec Item 3.3)2EA$$9290

TOTAL RECURRING BASE PERIOD LINE ITEMS - A001 THROUGH A004 $

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELINs-Base Period-Non Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-26-Q-XXXX
EXHIBIT A - CLIN 9000
Line Item 0002 Non-Recurring Work Price - Base Period
PROVIDE PRICES FOR OTHER (Gutter Maintenance) - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 thru A705

ELIN CAC SHORT DESCRIPTION FULL DESCRIPTION Estimated Quantity UNIT OF ISSUE UNIT PRICE TOTAL

AMOUNT

A700 9290 GUTTER

CLEANING AND

MINOR

MAINTENANCE The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall install all needed accessories needed to complete the work and attached the new gutters to the existing site drainage systems. 50 LF

A701 9290 GUTTER

REPLACEMENT

AND

INSTALLATION The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new gutters shall be attached to

the existing site drainage systems.3000LF
A7029290GUTTER

REPAIRS

(MAJOR) The Contractor shall repair damaged gutters. In addition, the contractor shall provide and install all necessary accessories required to complete the repairs as well as connecting the gutters to the existing site drainage

systems.2000LF
A7039290DOWNSPOUT

REPLACEMENT

AND

INSTALLATION (1-

STORY) The Contractor shall provide and install new down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new downspout shall be attached to the existing site

drainage systems.30EA
A7049290DOWNSPOUT

REPLACEMENT

AND

INSTALLATION (2-

STORY) The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new gutters shall be attached to

the existing site drainage systems.30EA
A7059290Labor & Material

Costs - MUST BE

NEGOTIATED BY

KO Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use for all other work not included in the above ELINs. These material costs MUST BE

NEGOTIATED BY KO USING ETO PROCESS.1LS
A7069290INSTALL GUTTER GUARDThe Contractor shall provide and install new Gutter Guards. The contractor shall install new Gutter Guards provide and install necessary accessories required to completethe installation.3000LF
NOTE: UNIT PRICE/LABOR AND MATERIAL COST MUST BE NEGOTIATED BY THE KOTOTAL NON-RECURRING WORK PRICE - BASE PERIOD

ELINs-1st Period-Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-26-Q-XXXX
EXHIBIT A - CLIN 9000
Line Item 0003 Recurring Work - 1st Option Period
PROVIDE PRICES TO PROVIDE OTHER (Gutter Maintenance) - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 thru B004
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
B001 - REGION Spec Item 3
B001Semiannual Gutter and Downspout cleaning Single Story Building (Section C, Spec Item 3.1 and 3.2)13,982LF$$9290
B002Semiannual Gutter and Downspout cleaning Two Story Building (Section C, Spec Item 3.1 and 3.2)11,579LF$$9290
B003Service Call - Up to $250 (Section C, Spec Item 3.3)4EA$$9290
B004Service Call - Up to $500 (Section C, Spec Item 3.3)2EA$$9290

TOTAL RECURRING BASE PERIOD LINE ITEMS - B001 THROUGH B004 $

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINs-1st Period-Non Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-26-Q-XXXX
EXHIBIT A - CLIN 9000
Line Item 0004 Non-Recurring Work Price - 1st Option Period
PROVIDE PRICES FOR OTHER (Gutter Maintenance) - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B700 thru B705

ELIN CAC SHORT DESCRIPTION FULL DESCRIPTION Estimated Quantity UNIT OF ISSUE UNIT PRICE TOTAL

B700 9290 GUTTER

CLEANING AND

MINOR

MAINTENANCE The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall install all needed accessories needed to complete the work and attached the new gutters to the existing site drainage systems. 50 LF

B701 9290 GUTTER

REPLACEMENT

AND

INSTALLATION The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new gutters shall be attached to

the existing site drainage systems.3000LF
B7029290GUTTER

REPAIRS

(MAJOR) The Contractor shall repair damaged gutters. In addition, the contractor shall provide and install all necessary accessories required to complete the repairs as well as connecting the gutters to the existing site drainage

systems.1000LF
B7039290DOWNSPOUT

REPLACEMENT

AND

INSTALLATION (1-

STORY) The Contractor shall provide and install new down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new downspout shall be attached to the existing site

drainage systems.30EA
B7049290DOWNSPOUT

REPLACEMENT

AND

INSTALLATION (2-

STORY) The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new gutters shall be attached to

the existing site drainage systems.30EA
B7059290Labor & Material

Costs - MUST BE

NEGOTIATED BY

KO Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use for all other work not included in the above ELINs. These material costs MUST BE

NEGOTIATED BY KO USING ETO PROCESS.1LS
B7069290INSTALL GUTTER GUARDThe Contractor shall provide and install new Gutter Guards. The contractor shall install new Gutter Guards provide and install necessary accessories required to completethe installation.3000LF
NOTE: UNIT PRICE/LABOR AND MATERIAL COST MUST BE NEGOTIATED BY THE KOTOTAL NON-RECURRING WORK PRICE - BASE PERIOD

ELINs-2nd Period-Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-26-Q-XXXX
EXHIBIT A - CLIN 9000
Line Item 0005 Recurring Work - 2nd Option Period
PROVIDE PRICES TO PROVIDE OTHER (Gutter Maintenance) - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs C001 thru C004
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
C001 - REGION Spec Item 3
C001Semiannual Gutter and Downspout cleaning Single Story Building (Section C, Spec Item 3.1 and 3.2)13,982LF$$9290
C002Semiannual Gutter and Downspout cleaning Two Story Building (Section C, Spec Item 3.1 and 3.2)11,579LF$$9290
C003Service Call - Up to $250 (Section C, Spec Item 3.3)4EA$$9290
C004Service Call - Up to $500 (Section C, Spec Item 3.3)2EA$$9290

TOTAL RECURRING BASE PERIOD LINE ITEMS - C001 THROUGH C004 $

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINs-2nd Period-Non Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-26-Q-XXXX
EXHIBIT A - CLIN 9000
Line Item 0006 Non-Recurring Work Price - 2nd Option Period
PROVIDE PRICES FOR OTHER (Gutter Maintenance) - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C700 thru C705

ELIN CAC SHORT DESCRIPTION FULL DESCRIPTION Estimated Quantity UNIT OF ISSUE UNIT PRICE TOTAL

C700 9290 GUTTER

CLEANING AND

MINOR

MAINTENANCE The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall install all needed accessories needed to complete the work and attached the new gutters to the existing site drainage systems. 50 LF

C701 9290 GUTTER

REPLACEMENT

AND

INSTALLATION The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new gutters shall be attached to

the existing site drainage systems.3000LF
C7029290GUTTER

REPAIRS

(MAJOR) The Contractor shall repair damaged gutters. In addition, the contractor shall provide and install all necessary accessories required to complete the repairs as well as connecting the gutters to the existing site drainage

systems.2000LF
C7039290DOWNSPOUT

REPLACEMENT

AND

INSTALLATION (1-

STORY) The Contractor shall provide and install new down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new downspout shall be attached to the existing site

drainage systems.30EA
C7049290DOWNSPOUT

REPLACEMENT

AND

INSTALLATION (2-

STORY) The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new gutters shall be attached to

the existing site drainage systems.30EA
C7059290Labor & Material

Costs - MUST BE

NEGOTIATED BY

KO Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use for all other work not included in the above ELINs. These material costs MUST BE

NEGOTIATED BY KO USING ETO PROCESS.1LS
C7069290INSTALL GUTTER GUARDThe Contractor shall provide and install new Gutter Guards. The contractor shall install new Gutter Guards provide and install necessary accessories required to completethe installation.3000LF
NOTE: UNIT PRICE/LABOR AND MATERIAL COST MUST BE NEGOTIATED BY THE KOTOTAL NON-RECURRING WORK PRICE - BASE PERIOD

ELINs-3rd Period-Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-26-Q-XXXX
EXHIBIT A - CLIN 9000
Line Item 0007 Recurring Work - 3rd Option Period
PROVIDE PRICES TO PROVIDE OTHER (Gutter Maintenance) - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs D001 thru D004
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
D001 - REGION Spec Item 3
D001Semiannual Gutter and Downspout cleaning Single Story Building (Section C, Spec Item 3.1 and 3.2)13,982LF$$9290
D002Semiannual Gutter and Downspout cleaning Two Story Building (Section C, Spec Item 3.1 and 3.2)11,579LF$$9290
D003Service Call - Up to $250 (Section C, Spec Item 3.3)4EA$$9290
D004Service Call - Up to $500 (Section C, Spec Item 3.3)2EA$$9290

TOTAL RECURRING BASE PERIOD LINE ITEMS - D001 THROUGH D004 $

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINs-3rd Period-Non Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-26-Q-XXXX
EXHIBIT A - CLIN 9000
Line Item 0008 Non-Recurring Work Price - 3rd Option Period
PROVIDE PRICES FOR OTHER (Gutter Maintenance) - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs D700 thru D705

ELIN CAC SHORT DESCRIPTION FULL DESCRIPTION Estimated Quantity UNIT OF ISSUE UNIT PRICE TOTAL

D700 9290 GUTTER

CLEANING AND

MINOR

MAINTENANCE The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall install all needed accessories needed to complete the work and attached the new gutters to the existing site drainage systems. 50 LF

D701 9290 GUTTER

REPLACEMENT

AND

INSTALLATION The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new gutters shall be attached to

the existing site drainage systems.3000LF
D7029290GUTTER

REPAIRS

(MAJOR) The Contractor shall repair damaged gutters. In addition, the contractor shall provide and install all necessary accessories required to complete the repairs as well as connecting the gutters to the existing site drainage

systems.2000LF
D7039290DOWNSPOUT

REPLACEMENT

AND

INSTALLATION (1-

STORY) The Contractor shall provide and install new down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new downspout shall be attached to the existing site

drainage systems.30EA
D7049290DOWNSPOUT

REPLACEMENT

AND

INSTALLATION (2-

STORY) The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new gutters shall be attached to

the existing site drainage systems.30EA
D7059290Labor & Material

Costs - MUST BE

NEGOTIATED BY

KO Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use for all other work not included in the above ELINs. These material costs MUST BE

NEGOTIATED BY KO USING ETO PROCESS.1LS
D7069290INSTALL GUTTER GUARDThe Contractor shall provide and install new Gutter Guards. The contractor shall install new Gutter Guards provide and install necessary accessories required to completethe installation.3000LF
NOTE: UNIT PRICE/LABOR AND MATERIAL COST MUST BE NEGOTIATED BY THE KOTOTAL NON-RECURRING WORK PRICE - BASE PERIOD

ELINs-4th Period-Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-26-Q-XXXX
EXHIBIT A - CLIN 9000
Line Item 0009 Recurring Work - 4th Option Period
PROVIDE PRICES TO PROVIDE OTHER (Gutter Maintenance) - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs E001 thru E004
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
E001 - REGION Spec Item 3
E001Semiannual Gutter and Downspout cleaning Single Story Building (Section C, Spec Item 3.1 and 3.2)13,982LF$$9290
E002Semiannual Gutter and Downspout cleaning Two Story Building (Section C, Spec Item 3.1 and 3.2)11,579LF$$9290
E003Service Call - Up to $250 (Section C, Spec Item 3.3)4EA$$9290
E004Service Call - Up to $500 (Section C, Spec Item 3.3)2EA$$9290

TOTAL RECURRING BASE PERIOD LINE ITEMS - E001 THROUGH E004 $

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINs-4th Period-Non Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-26-Q-XXXX
EXHIBIT A - CLIN 9000
Line Item 0010 Non-Recurring Work Price - 4th Option Period
PROVIDE PRICES FOR OTHER (Gutter Maintenance) - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs E700 thru E705

ELIN CAC SHORT DESCRIPTION FULL DESCRIPTION Estimated Quantity UNIT OF ISSUE UNIT PRICE TOTAL

E700 9290 GUTTER

CLEANING AND

MINOR

MAINTENANCE The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall install all needed accessories needed to complete the work and attached the new gutters to the existing site drainage systems. 50 LF

E701 9290 GUTTER

REPLACEMENT

AND

INSTALLATION The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new gutters shall be attached to

the existing site drainage systems.3000LF
E7029290GUTTER

REPAIRS

(MAJOR) The Contractor shall repair damaged gutters. In addition, the contractor shall provide and install all necessary accessories required to complete the repairs as well as connecting the gutters to the existing site drainage

systems.2000LF
E7039290DOWNSPOUT

REPLACEMENT

AND

INSTALLATION (1-

STORY) The Contractor shall provide and install new down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new downspout shall be attached to the existing site

drainage systems.30EA
E7049290DOWNSPOUT

REPLACEMENT

AND

INSTALLATION (2-

STORY) The Contractor shall provide and install new gutters and down spouts on buildings to provide proper drainage. The contractor shall remove the existing gutters as well as provide and install necessary accessories required to complete the installation. The new gutters shall be attached to

the existing site drainage systems.30EA
E7059290Labor & Material

Costs - MUST BE

NEGOTIATED BY

KO Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use for all other work not included in the above ELINs. These material costs MUST BE

NEGOTIATED BY KO USING ETO PROCESS.1LS
E7069290INSTALL GUTTER GUARDThe Contractor shall provide and install new Gutter Guards. The contractor shall install new Gutter Guards provide and install necessary accessories required to completethe installation.3000LF
NOTE: UNIT PRICE/LABOR AND MATERIAL COST MUST BE NEGOTIATED BY THE KOTOTAL NON-RECURRING WORK PRICE - BASE PERIOD