This is Amendment 0002 to Solicitation N40085-26-R-9057 for the Building G560 Mechanical Replacement project at Camp Lejeune, North Carolina, administered by NAVFAC Mid-Atlantic. The amendment, effective July 22, 2026, provides responses to seven Request for Information (RFI) questions submitted by potential contractors regarding project specifications and execution details. Key clarifications include: work is located on Camp Geiger and requires base access (not a restricted area); contractor personnel must wear DBIDS cards and/or base access passes; lead abatement subcontractors must dispose of plumbing materials unless lead-free status can be verified; only one exhaust fan (EF-1) requires replacement with one 10"x10" suction grille per bathroom; the existing outside air louver should be assumed for reuse pending contractor verification with government contact Nick Vella at (910) 451-0248; exhaust fan access is available through ceiling openings in the hallway or bathroom with subsequent repair of penetrations; and refrigerant lines must be reclaimed before cutting and capping existing lines, with new lines routed to the exterior and down to the condensing unit. The amendment confirms that all other terms and conditions of the solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25R9057 Amend 0003.pdf | ||
| 25R9057 Amend 0003.pdf | ||
| 26R9057 G560 RFP.pdf | ||
| 26R9057 Amend0001.pdf | ||
| 25-0081 SOW.pdf | ||
| N4008525B0081 Specs.pdf | ||
| 25R9057 G560 RFP.pdf | ||
| N4008525B0081 Dwgs.pdf | ||
| 25-0081 ACM REPORT.pdf | ||
| CONSTRUCTION PROJECT_ 25-0081 Building G560 Mechanical Replacement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 3
AMENDMENT NO. 0002 07/22/26 25-0081
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-26-R-9057
7/2/26
25-0081, Building G560 Mechanical Replacement Amendment 0002, RFI Answers
(See Continuation Page)
N40085-26-R-9057 Amendment 0002
CONTINUATION SHEET
1. QUESTION: General Note 5 on drawing G001 states “The area of work is located within restricted areas. Access to this area shall be coordinated with the contracting officer.” What restrictions will be required for work in the project area?
ANSWER: This note refers to the work taking place on Camp Geiger. Not a restricted area but requires access to base at the new river/air station.
2. QUESTION: General Note 18 on drawing G001 states “Contractor’s personnel must wear identification at all times.” What will be required?
ANSWER: DBIDS card and/or base access pass.
3. QUESTION: Notice of Potential Lead-Base Paint and Plumbing Materials states “…The contractor shall presume that plumbing pipes, solder and other components also contain lead.”
During the site visit, we noticed the condensate drain piping was copper. Will the disposal of the condensate drain piping be by a Lead Abatement Subcontractor?
ANSWER: Unless it is possible to verify that the piping is free of lead. The disposal shall be done by a lead abatement subcontractor.
4. QUESTION: Mechanical Demo Note 10 on drawing M101 shows the demo of 1 each exhaust fan. Mechanical General Note 10 states to “Provide new exhaust fan(s) with suction grills, one in each bathroom.” New Panelboard: PLP Schedule on M601 only shows 1 each exhaust fan EF-1.
How many exhaust fan EF-1 will be required to be replaced? How many and what type and size of suction grille is required?
ANSWER: There should only be one fan (EF-1) located above the bathroom at the roof penetration. The suction grills are one in each bathroom that shall be replaced with like and kind to existing (which should be 10”x10”).
5. QUESTION: Mechanical General Note 8 on drawing M102 states “Existing Outside Air Louver may remain if it functions and fits with new equipment, but shall be replaced if necessary. Same applies to the ductwork feeding to and from AHU-1 and AHU-2.” This is a very open ended statement. Who makes the determination if the louver and ductwork is functional? If louver is deemed not functional, what are the specs for the type of louver that will be required?
ANSWER: Bid assuming it will not be replaced. The intent is to reuse the existing OA Louver.
From limited available access at the time of initial inspection, the OA louver appeared to be intact for reuse. After performing the demo for this project there will be a point where the OA
N40085-26-R-9057 Amendment 0002 lover will be more accessible. At that time, the contractor shall verify with the government that the OA louver is fit for reuse or not. Contact Nick Vella for OA louver reuse condition verification: (910) 451-0248. Spec for OA louver will be provided if required.
6. QUESTION: The exhaust fan is in a hard ceiling. We did not see any access panels. Where is the access to get above the bathroom ceiling to demolish the exhaust fan and install new exhaust fan? Is the access panel large enough to get the new fan above the ceiling?
ANSWER: Either through the ceiling just outside the bathrooms in the hallway or opening the ceiling in the bathroom. After getting into the ceiling, replace with like and kind to repair any access holes or penetrations made.
7. QUESTION: During the site visit, it appears the refrigerant and condensate piping is run between the interior sheetrock and exterior metal panels. There is no mention of this interior sheetrock wall. Is the sheetrock wall being demoed to remove the existing and run the new piping in the same routing? Or are we to cut and cap the existing refrigerant and condensate drain piping and abandon in place, and then run the refrigerant and condensate drain piping out of the building and down the exterior?
ANSWER: Verify all refrigerant is reclaimed prior to cut and cap of existing lines for abandon in place. Run new RF lines and condensate out to exterior and down to grade/condensing unit