This is an Asbestos Inspection Report for Building G560 (MWR Staff NCO Club) at MCB Camp Lejeune, dated August 18, 2025. The building was constructed in 1977 and currently holds a Hazard Rank 3/Green classification as of July 2022.

The inspection identified non-friable asbestos-containing materials (ACM) in the building, with no friable ACM records found. The non-friable ACM includes: roofing sealant (black) located on the north and south roof vent base flashing patching (24 linear feet, identified on 3/25/2010, 1/15/2014, and 7/20/2022); and window glazing material in beige color on the southside and north wing east/west metal windows (270 linear feet, identified on 3/25/2010, 1/15/2014, and 7/20/2022). Numerous materials have been tested and confirmed as non-ACM or removed, including ceiling tiles, floor tiles, adhesives, drywall, caulking, and plaster materials. The report emphasizes that ACM presents a health hazard only when asbestos fibers are airborne and inhaled, and that intact, undisturbed ACM is not considered a significant health hazard. Building occupants and maintenance personnel are instructed to avoid disturbing or damaging ACM and to report any damage or changes in material condition to the Camp Lejeune Asbestos Program Manager at 910-451-5837. Periodic inspections will continue to monitor the condition of identified ACM.

View the file

Other files

File Type Posted
25R9057 Amend 0003.pdf PDF
25R9057 Amend 0003.pdf PDF
26R9057 Amend 0002.pdf PDF
26R9057 G560 RFP.pdf PDF
26R9057 Amend0001.pdf PDF
25R9057 G560 RFP.pdf PDF
N4008525B0081 Dwgs.pdf PDF
CONSTRUCTION PROJECT_ 25-0081 Building G560 Mechanical Replacement.pdf PDF
25-0081 SOW.pdf PDF
N4008525B0081 Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS INSPECTION REPORT of:

Building # G560

MCB CAMP LEJEUNE

Monday, August 18, 2025

Print Date

Monday, August 18, 2025 Page 1 of 7Print Date:

INSPECTION SUMMARY

BLDG #:

OCCUPANT:

YEAR BUILT:

BUILDING COMMENTS:

G560

MWR STAFF NCO CLUB

HAZ RANK 3/GREEN [AH JUL2022]

INTERIOR WINDOW GLAZING ACCESSIBLE AND POTENTIAL FOR DISTURBANCE. MONTIOR CONDITION.

JAN2014

PVS. ACM REMAINS, NO CHANGE

MAR2010

ADDL SAMPLING/ INSPECTION, ACM INCLUDES:

WINDOW GLAZING MATERIAL

RESIDUAL MASTIC

12" BLACK TILE AND MASTIC

ROOFING SEALANT, BLACK

NOV07

ADDL SAMPLES, NO ACM IDENTIFED

INSPECT MAY96

NO ASBESTOS CONTAINING MATERIALS IDENTIFIED. UNDER RENOVATION DURING INSPECTION.

ASBESTOS MANAGER: 910-451-5837

Friable ACM(s) identified

Non-friable ACM(s) identified

NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

No friable ACM records found in database

NOTIFICATION OF ACM IN BUILDING

ROOFING SEALANT, BLACK 24 LFNORTH AND SOUTH ROOF, VENT BASE

FLASHING PATCHING

3/25/2010

WINDOW GLAZING MATERIAL 270 LFSOUTHSIDE AND NORTH WING EAST/

WEST METAL WINDOWS

7/20/2022

ROOFING SEALANT, BLACK 24 LFNORTH AND SOUTH ROOF, VENT BASE

FLASHING PATCHING

7/20/2022

WINDOW GLAZING MATERIAL 270 LFSOUTHSIDE AND NORTH WING EAST/

WEST METAL WINDOWS

3/25/2010

WINDOW GLAZING MATERIAL 270 LFSOUTHSIDE AND NORTH WING EAST/

WEST METAL WINDOWS

1/15/2014

ROOFING SEALANT, BLACK 24 LFNORTH AND SOUTH ROOF, VENT BASE

FLASHING PATCHING

1/15/2014

Monday, August 18, 2025 Page 2 of 7Print Date:

Tested Non ACM or REMOVED Materials

DESCRIPTION LOCATION Date

WINDOW GLAZING MATERIAL 270 LFSOUTHSIDE AND NORTH WING EAST/

WEST METAL WINDOWS

6/6/2016

ROOFING SEALANT, BLACK 24 LFNORTH AND SOUTH ROOF, VENT BASE

FLASHING PATCHING

6/6/2016

WINDOW GLAZING MATERIAL SOUTHSIDE AND NORTH WING EAST/

WEST METAL WINDOWS

11/29/2007

FIRE CURTAIN NORTH WING ROOM DIVIDER

CURTAINS BETWEEN SOUTH DINING

AND NORTH STAGE/ DANCE FLOOR

AREAS

5/1/1996

EXTERIOR CAULKING, SOUTHSIDE AND NORTH WING EAST/

WEST METAL WINDOWS

11/29/2007

PIPE WRAPPING ON EXTERIOR SOUTHEAST, HVAC/ AC UNIT

PIPING

11/29/2007

INTERIOR CAULKING, DOORS THROUGHOUT 11/29/2007

JOINT MATERIAL PATCHING AT DOORWAYS, MIXED

THROUGHOUT

11/29/2007

CARPET ADHESIVE NORTH WING DINING AREA; SOUTH

WING THROUGHOUT EXCEPT KITCHEN

AREAS

11/29/2007

DRYWALL AND JOINT MATERIAL INTERIOR WALLS THROUGHOUT 11/29/2007

WALL PANELING MATERIAL NORTH WING, NORTH EAST AND WEST

CLOSETS

11/29/2007

WALL TILE ADHESIVE SOUTH WING, CENTER WEST ROOM 11/29/2007

2'x2' CEILING TILE, THROUGHOUT THE BUILDING EXCEPT

KITCHEN AND ASSOCIATED ROOMS

5/1/1996

12" CREAM FLOOR TILE AND ADHESIVE NORTH WING, CENTRAL DANCE FLOOR 5/1/1996

EXTERIOR CAULKING, METAL WINDOW TRIM 3/25/2010

FLOOR LEVELING COMPOUND NORTH WING, NORTH END;

SOUTHEAST OFFICE, OVER RESIDUAL

ACM BLACK MASTIC, UNDER HM21

FLOOR TILE AND CARPET

3/25/2010

12" BLACK FLOOR TILE AND ADHESIVE SOUTHEAST OFFICE, UNDER CARPET,

OVER HM20

3/25/2010

PLASTER MATERIAL SOUTHWEST KITCHEN AREA WALLS

AND CEILINGS

3/25/2010

EXTERIOR CAULKING, ROOFING SCREW HEADS 3/25/2010

DRYWALL AND JOINT MATERIAL INTERIOR WALLS THROUGHOUT 3/25/2010

CARPET ADHESIVE NORTH WING DINING AREA; SOUTH

WING THROUGHOUT EXCEPT KITCHEN

AREAS

3/25/2010

12" CREAM FLOOR TILE AND ADHESIVE NORTH WING, CENTRAL DANCE FLOOR 3/25/2010

Monday, August 18, 2025 Page 3 of 7Print Date:

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

HEALTH ASPECTS:

Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.

CONDITIONS TO AVOID:

Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos

Program Manager.

REPORTS OF DAMAGE:

Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:

ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:

The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.

RECORDKEEPING:

CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837

EXTERIOR CAULKING, SOUTHSIDE AND NORTH WING EAST/

WEST METAL WINDOWS

3/25/2010

FLOOR LEVELING COMPOUND NORTH WING, NORTH END;

SOUTHEAST OFFICE, OVER RESIDUAL

ACM BLACK MASTIC, UNDER HM21

FLOOR TILE AND CARPET

1/15/2014

12" BLACK FLOOR TILE AND ADHESIVE SOUTHEAST OFFICE, UNDER CARPET,

OVER HM20

1/15/2014

FLOOR LEVELING COMPOUND NORTH WING, NORTH END;

SOUTHEAST OFFICE, OVER RESIDUAL

ACM BLACK MASTIC, UNDER HM21

FLOOR TILE AND CARPET

6/6/2016

Monday, August 18, 2025 Page 4 of 7Print Date:

SAMPLES COLLECTED

Sample Sample

Date

HA Sample Location Chr

Amo

Oth

Description

G560-01-001 5/1/199601 NORTH WING, NORTH

DANCE FLOOR

0 0 02'x2' CEILING TILE, G560-01-002 5/1/199601 NORTH WIND, SOUTH

DINING AREA

0 0 02'x2' CEILING TILE, G560-01-003 5/1/199601 SOUTH BAR AREA 0 0 02'x2' CEILING TILE, G560-02-004 5/1/199602 NORTH WING, AT STAGE

CLOSET

0 0 012" CREAM FLOOR TILE

AND ADHESIVE

w/BROWN FLECKS

G560-02-20 3/25/201002 NORTH WING NORTH, SW

EDGE

0 0 012" CREAM FLOOR TILE

AND ADHESIVE

w/BROWN FLECKS

G560-02-20tem 3/25/201002 NORTH WING NORTH, SW

EDGE

0 0 012" CREAM FLOOR TILE

AND ADHESIVE

w/BROWN FLECKS

G560-02-21 3/25/201002 NORTH WING, NE CORNER 0 0 012" CREAM FLOOR TILE

AND ADHESIVE

w/BROWN FLECKS

G560-03-005 5/1/199603 NORTH WING, CNTR

CURTAIN

0 0 0FIRE CURTAIN

G560-10-10 11/29/200710 SOTUH CNTR, WEST WINDOW 0 0 0EXTERIOR CAULKING, WHITE

G560-10-11 11/29/200710 SOUTH CNTR, EAST WINDOW 0 0 0EXTERIOR CAULKING, WHITE

G560-10-20 3/25/201010 SOUTHSIDE, EAST WINDOW 0 0 0EXTERIOR CAULKING, WHITE

G560-10-21 3/25/201010 SOUTHSIDE, CNTR WINDOW 0 0 0EXTERIOR CAULKING, WHITE

G560-11-10 11/29/200711 SOUTH WING, EAST EXT. AC

UNIT

0 0 0PIPE WRAPPING ON WHITE

G560-12-10 11/29/200712 NORTH WING, SW CLOSET

DOOR

0 0 0INTERIOR CAULKING, WHITE

G560-13-10 11/29/200713 NORTH WING, SW DOORWAY 0 0 0JOINT MATERIAL

G560-13-11 11/29/200713 NORTH WING, NW DOORWAY 0 0 0JOINT MATERIAL

G560-14-10 11/29/200714 NORTH WING, NW 0 0 0CARPET ADHESIVE YELLOW/ TAN

G560-14-11 11/29/200714 NORTH WING, SE 0 0 0CARPET ADHESIVE YELLOW/ TAN

G560-14-20 3/25/201014 NORTH WING, SOUTH CNTR 0 0 0CARPET ADHESIVE YELLOW/ TAN

G560-14-21 3/25/201014 SOUTH CNTR MAIN AREA,

SOUTH CNTR

0 0 0CARPET ADHESIVE YELLOW/ TAN

Monday, August 18, 2025 Page 5 of 7Print Date:

HA Sample Location Chr

Amo

Oth

Description

G560-15-10 11/29/200715 NORTH WING, NW CLOSET

WALL

0 0 0DRYWALL AND JOINT

MATERIAL

G560-15-11 11/29/200715 SOUTH WING, CNTR MAIN

AREA NW WALL

0 0 0DRYWALL AND JOINT

MATERIAL

G560-15-20 3/25/201015 NORTH WING, SW CLOSET 0 0 0DRYWALL AND JOINT

MATERIAL

G560-15-21 3/25/201015 SOUTH WING, NE MALE HEAD 0 0 0DRYWALL AND JOINT

MATERIAL

G560-16-10 11/29/200716 NORTH WING, NE CLOSET 0 0 0WALL PANELING

MATERIAL

G560-17-10 11/29/200717 SOUTH WING, SW 0 0 0WALL TILE ADHESIVE

G560-18-00ri13 1/15/201418 N/A 9 9 9WINDOW GLAZING

MATERIAL

BEIGE

G560-18-00ri16 6/6/201618 N/A 9 9 9WINDOW GLAZING

MATERIAL

BEIGE

G560-18-10 11/29/200718 WEST SIDE OF BLDG 0 0 0WINDOW GLAZING

MATERIAL

BEIGE

G560-18-20 3/25/201018 SOUTHSIDE, EAST BAR,

SOUTH WINDOW

0 0 0WINDOW GLAZING

MATERIAL

BEIGE

G560-18-21 3/25/201018 SOUTHSIDE MAIN CNTR

ROOM, SOUTH CNTR

WINDOW

2 0 0WINDOW GLAZING

MATERIAL

BEIGE

G560-20-00ri13 1/15/201420 N/A 9 9 9FLOOR LEVELING

COMPOUND

w/RESIDUAL MASTIC

G560-20-20 3/25/201020 NORTH WING, WEST CNTR

AT CURTAIN

0 0 0FLOOR LEVELING

COMPOUND

w/RESIDUAL MASTIC

G560-20-21 3/25/201020 SE OFFICE, SW CORNER 3 0 0FLOOR LEVELING

COMPOUND

w/RESIDUAL MASTIC

G560-20-30 6/6/201620 SE WING, SE AT

RENOVATIONS

.1 .1 .1FLOOR LEVELING

COMPOUND

w/RESIDUAL MASTIC

G560-21-00ri13 1/15/201421 N/A 9 9 912" BLACK FLOOR TILE

AND ADHESIVE

G560-21-20 3/25/201021 SE OFFICE, SW CORNER 3 0 012" BLACK FLOOR TILE

AND ADHESIVE

G560-21-21 3/25/201021 SE OFFICE, NE CORNER 2 0 012" BLACK FLOOR TILE

AND ADHESIVE

G560-21-21tem 3/25/201021 SE OFFICE, NE CORNER 7.02 0 012" BLACK FLOOR TILE

AND ADHESIVE

Monday, August 18, 2025 Page 6 of 7Print Date:

HA Sample Location Chr

Amo

Oth

Description

G560-22-20 3/25/201022 SW KITCHEN, NORTH CNTR

WALL

0 0 0PLASTER MATERIAL

G560-22-21 3/25/201022 SW KITCHEN, SW STORAGE

CEILING

0 0 0PLASTER MATERIAL

G560-23-20 3/25/201023 SOUTH ROOF, SE 0 0 0EXTERIOR CAULKING, BLACK

G560-24-00ri13 1/15/201424 N/A 9 9 9ROOFING SEALANT, BLACK

G560-24-00ri16 6/6/201924 N/A 9 9 9ROOFING SEALANT, BLACK

G560-24-20 3/25/201024 SOUTH ROOF, NE VENT 3 0 0ROOFING SEALANT,

BLACK

G560-24-21 3/25/201024 SOUTH ROOF, NW VENT 3 0 0ROOFING SEALANT,

BLACK

G560-25-20 3/25/201025 SOUTH WING, SOUTH CNTR 0 0 0EXTERIOR CAULKING, GRAY