Summary of Amendment 0005 to Solicitation N40085-26-R-9055

This document is Standard Form 30 (SF 30), an Amendment of Solicitation for federal contract N40085-26-R-9055, issued by NAVFAC Mid-Atlantic for the BEQ HP200 Area Paint & Flooring Repairs project at Camp Lejeune, North Carolina. Amendment 0005, effective August 14, 2026, addresses fourteen Requests for Information (RFIs) and updates the prevailing wage determination to NC20260010 dated May 18, 2026. The time and date for receipt of proposals remains unchanged, and bidders must acknowledge receipt of this amendment when submitting proposals or risk rejection.

Key clarifications provided through the RFI responses include: the contract duration was extended to 720 days (up from 540 days); all previously painted surfaces including stairwell components are in scope, while mechanical and electrical rooms are excluded; a minimum of 10 rooms will be available at one time, with simultaneous work across multiple buildings determined at preconstruction; mold and mildew cleaning are the contractor's responsibility per painting specifications; no carpet installation is required; corner guards must be replaced with new units; and no lead or asbestos contamination is present. The prevailing wage determination (General Decision NC20260010) applies to this construction project in Onslow County, North Carolina, with effective rates for painters at $15.55 per hour plus $1.05 fringe benefits, along with rates for other trades including carpenters, electricians, and laborers. Contractors must provide paid sick leave benefits per Executive Order 13706 and comply with applicable minimum wage requirements under Executive Order 13658.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 7

AMENDMENT NO. 0005 08/14/26 26-0432

N40085

NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521

See Item 6

✘ N40085-26-R-9055

07/14/26

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

26-0432, BEQ HP200 Area Paint & Flooring Repairs Amendment 0005, Answer Requests for information and Update Wage Determination to NC20260010 05.18.2026

The time and date for receipt of proposals remains unchanged.

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.

See Continuation Page(s) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

N40085-25-R-9055 Amendment 0005

CONTINUATION SHEET

1. QUESTION: The duration was revised from 360 days to 540 via amendment. Considering 6 buildings, that will be extremely tight. Can the duration be revised to 720 days?

ANSWER: Yes

2. QUESTION: Are stairwells included in the scope? Treads, risers & railings?

ANSWER: All previously painted surfaces.

3. QUESTION: Are mechanical rooms & electrical rooms included in the scope?

ANSWER: No

4. QUESTION: How much of the buildings will be available at one time?

ANSWER: A minimum of 10 rooms at a time

5. QUESTION: Can all buildings be worked in simultaneously?

ANSWER: This will be determined at Precon

6. QUESTION: Will any exposed sprinkler pipe of fire alarm conduit be included?

ANSWER: No

7. QUESTION: The washers & dryers in the laundry rooms are owned and operated by a contractor. Will they be responsible for moving their equipment?

ANSWER: The contractor that owns washers and dryers is responsible for moving.

8. QUESTION: Please clarify if there has been any asbestos or lead surveying done to the buildings. If so, please provide the results. If not, please clarify how suspect material encountered will be handled (unit price, change)?

ANSWER: No Lead or Asbestos present.

9. QUESTION: There is a carpet spec, but no carpet shown in the Finish Schedule.

ANSWER: No carpet is being installed.

10. QUESTION: What is the quantity of trim/molding to replace for bidding purposes?

ANSWER: See quantities attached to project or building plans.

11. QUESTION: Are the corner guards to be removed and reinstalled or provide new based on finish schedule?

ANSWER: Provide new.

12. QUESTION: Confirming no Mold Remediation is required?

ANSWER: MOLD/Mildew cleaning will be the responsibility of the contractor as noted in the painting and coating specifications.

Surface Cleaning: Remove the following deleterious substances.

(1) Dirt, Chalking, Grease, and Oil: Wash new and existing uncoated surfaces with a solution composed of 1/2 cup trisodium phosphate, 1/4 cup household detergent, and 4 quarts of warm water. Then rinse thoroughly with fresh water. Wash existing coated surfaces with a suitable detergent and rinse thoroughly. For large areas, water blasting may be used.

(2) Fungus and Mold: Wash new, existing coated, and existing uncoated surfaces with a solution composed of 1/2 cup trisodium phosphate, 1/4 cup household detergent, 1 quart 5 percent sodium hypochlorite solution and 3 quarts of warm water. Rinse thoroughly with fresh water.

(3) Paint and Loose Particles: Remove by wire brushing.

(4) Efflorescence: Remove by scraping or wire brushing followed by washing with a 5 to 10 percent by weight aqueous solution of hydrochloric (muriatic) acid. Do not allow acid to remain on the surface for more than five minutes before rinsing with fresh water. Do not acid clean more than 4 square feet of surface, per workman, at one time.

(5) Removal of Existing Coatings: For surfaces to receive textured coating MPI 42, remove existing coatings including soundly adhered coatings if recommended by textured coating manufacturer.

13. QUESTION: Within the overall project schedule, commence and complete the work in phases as described in the attached project description. Provide the project schedule mentioned?

(Page 1 of 235, Section 01 11 00, Paragraph 1.2)

ANSWER: Project schedule will not be required to phase schedule according to project description.

14. QUESTION: Can we work in more than one BEQ at a time?

ANSWER: This will be determined at Precon.

15. All other terms and conditions remain unchanged.

"General Decision Number: NC20260010 05/18/2026

State: North Carolina

Construction Types: Building

Counties: North Carolina Counties of Onslow

Modification Number Publication Date 0 01/02/2026 1 05/18/2026

IRON0848-003 07/01/2025

Rates Fringes

IRONWORKER..........................................$ 29.75 18.00

PLUM0421-006 07/01/2023

Rates Fringes

PIPEFITTER..........................................$ 33.96 13.48

SUNC2018-010 08/08/2023

Rates Fringes

TRUCK DRIVER: DUMP TRUCK...........................$ 15.98 2.93

SHEET METAL WORKER..................................$ 19.67 13.27

ROOFER..............................................$ 18.26 4.38

PLUMBER.............................................$ 23.11 0.00

PAINTER.............................................$ 15.55 1.05

OPERATOR: ROLLER...................................$ 15.31 1.46

OPERATOR: GRADER/BLADE.............................$ 22.68 3.27

OPERATOR: FORKLIFT.................................$ 16.75 0.00

OPERATOR: BULLDOZER................................$ 17.54 2.63

OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE...............$ 21.00 2.89

LABORER: PIPELAYER.................................$ 16.33 3.11

LABORER: MASON TENDER - CEMENT/CONCRETE............$ 15.26 0.00

LABORER: MASON TENDER - BRICK......................$ 13.17 0.00

LABORER: COMMON OR GENERAL.........................$ 11.98 0.81

FORM WORKER.........................................$ 14.51 1.88

ELECTRICIAN.........................................$ 22.15 5.93

CEMENT MASON/CONCRETE FINISHER......................$ 16.72 0.00

CARPENTER, EXCLUDES FORM WORK.......................$ 18.11 2.63

BRICKLAYER..........................................$ 19.13 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than �SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the �SA� identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys

Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION

Amendment 0005 N40085-26-R-9055 BEQ HP200 Area Paint & Flooring Repairs 26-0432 (1)
Amendment 0005 Continuation Sheet N4008526R9055
Wage Determination NC20260010 05.18.2026