26M087CN BEQ HP200 Area Paint-Flooring Project FS.pdf
PDF 58 KB Posted
- Attached to
- BEQ HP200 Area Paint & Flooring Repairs
- Solicitation number
- N4008526R9055
About this file
This is a finishes specification document for an interior construction project, detailing approved materials and installation requirements for various building elements and room types.
The document specifies paint products from Benjamin Moore and Sherwin Williams for primary walls, accent walls, door frames, and GWB/exposed ceilings in specific colors and finishes. Flooring specifications include luxury vinyl tile from Mannington in designated patterns and colors for sleeping rooms and offices, with rubber base from Johnsonite, transition strips from Schluter, corner guards from Inpro stainless steel, and epoxy resinous flooring from Dur-A-Flex for lounge and shared spaces. The general notes establish that listed manufacturers represent the approved basis of design but equivalent products from other manufacturers may be considered with project manager review and NAVFAC Contracting Officer approval. Substitutions are prohibited due to ordering lead times, with contractors responsible for timely material procurement. Key requirements include minimum Class A fire ratings for all interior finishes in vertical exit ways, exit lobbies, and corridors; spray painting of electrical panels and access panels to match adjacent wall colors; compliance with manufacturer installation requirements; and ABA guideline adherence for all flooring transitions, which must be centered under doors. A comprehensive room finish schedule cross-references specific rooms with their corresponding floor, base, and wall finish specifications using coded designations (SC-1, PNT-1, LVT-1, etc.) that correlate to the product specifications table.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAME LOCATION MANUFACTURER MODEL COLOR SIZE
PAINT PRIMARY WALLS BENJAMIN MOORE 1548 CLASSIC GRAY -
ACCENT PAINT SLEEPING ROOMS BENJAMIN MOORE 1552 RIVER REFLECTIONS -
PAINT DOOR FRAMES SHERWIN WILLIAMS SW 7026 GRIFFIN -
PAINT GWB & EXPOSED CEILINGS SHERWIN WILLIAMS SW 7102 WHITE FLOUR -
WALL GRAPHIC LOUNGE FIND YOUR LEVEL LINDSEY II BEIGE -
LUXURY VINYL TILE SLEEPING ROOMS MANNINGTON CRISSCROSS ZOOM CHARCOAL -
LUXURY VINYL TILE OFFICES MANNINGTON ACCESS STONE LINEAR STONE SHALE -
RUBBER BASE PRIMARY BASE JOHNSONITE 283 TOAST -
TRANSITION STRIP LVT TO TILE SCHLUTER RENO-U AEU 35 SATIN ANODIZED -
TRANSITION STRIP LVT TO CONCRETE OR EPOXY SCHLUTER RENO-U AEU 100 SATIN ANODIZED -
CORNER GUARD OUTSIDE CORNERS INPRO TYPE 430 STAINLESS STEEL -
EPOXY RESINOUS FLOORING LOUNGE & SHARED SPACES DUR-A-FLEX DUR-A-QUARTZ Q28-23 -
GENERAL NOTES
• FINISHES INDICATED ARE THE APPROVED BASIS OF
DESIGN TO CONVEY COLOR, PATTERN, TEXTURE AND
SALIENT CHARACTERISTICS ONLY. THE LISTING OF
MANUFACTURER INFORMATION IS NOT INTENDED TO
LIMIT THE SELECTION OF PRODUCTS PROVIDED BY
OTHER MANUFACTURERS. PRODUCTS MEETING
THESE CRITERIA WILL BE CONSIDERED AND MUST BE
REVIEWED BY THE PROJECT MANAHGER AND
APPROVED BY THE NAVFAC CONTRACTING OFFICER.
FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME
TO AVOID DELAYS.
• FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME
TO AVOID DELAYS.
• ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS,
EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET
MINIMUM CLASS A RATING.
• SPRAY PAINT ELECTRICAL PANELS, ACCESS
PANELS, AND EXPANSION JOINTS TO MATCH THE
ADJACENT WALL COLOR. PANELS PAINTED BY BRUSH
ARE NOT ACCEPTABLE.
• ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED
PER MANUFACTURER'S INSTALLATION
REQUIREMENTS.
• ALL FLOORING TRANSITIONS MUST MEET ABA
GUIDELINES. FLOORING TRANSITIONS OCCURRING
UNDER DOORS MUST BE CENTERED UNDER DOOR.
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RES-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RES-1
RB-1
PNT-6
PNT-6
NOTES
ROOM FINISH SCHEDULE ( AS Applicable)
PRODUCT SPECIFICATIONS (Or Equivalent)
PNT-6LAUNDRY SC-1 PNT-1
PNT-6MECHANICAL SC-1 PNT-1
PNT-6STORAGE SC-1 PNT-1
PNT-6STOR SC-1 PNT-1
PNT-6OFFICE LVT-2 PNT-1, PNT-3
PNT-6VENDING SC-1 PNT-1
PNT-6LAUNDRY SC-1 PNT-1
PNT-6CORRIDOR SC-1 PNT-1
PNT-6ELEC SC-1 PNT-1
PNT-6ADMINISTRATIVE OFFICE LVT-2 PNT-1, PNT-3
PNT-6CO OFFICE LVT-2 PNT-1, PNT-3
PNT-6ADMINISTRATIVE OFFICE LVT-2 PNT-1, PNT-3
PNT-6STORAGE SC-1 PNT-1
PNT-6STOR SC-1 PNT-1
PNT-6 1, 3MENS T-1 T-2, T-3
PNT-6 1, 3WOMENS T-1 T-2, T-3
PNT-6XO OFFICE LVT-2 PNT-1, PNT-3
PNT-6COPY/ KITCHENETTE LVT-2 PNT-1, PNT-3
PNT-6MECHANICAL CHASE SC-1 PNT-1
PNT-6MECHANICAL CHASE SC-1 PNT-1
PNT-6MECHANICAL SC-1 PNT-1
PNT-6MECHANICAL CHASE SC-1 PNT-1
PNT-6LAUNDRY SC-1 PNT-1
PNT-6MECHANICAL SC-1 PNT-1
PNT-6STORAGE SC-1 PNT-1
PNT-6 2JANITOR SC-1 PNT-1
PNT-6COMM SC-1 PNT-1
PNT-6VENDING SC-1 PNT-1
PNT-6LOUNGE RES-1 PNT-1, WC-1
PNT-6CORRIDOR SC-1 PNT-1
MECHANICAL CHASE SC-1 PNT-1
PNT-6ELEC SC-1 PNT-1
FLOOR FINISH BASE FINISH WALL FINISH CEILING
FINISHNAME
PNT-6STORAGE SC-1 PNT-1
PNT-6 2JANITOR SC-1 PNT-1
PNT-6LAUNDRY SC-1 PNT-1
PNT-6MECHANICAL
VENDING SC-1 PNT-1 PNT-6
MECHANICAL SC-1 PNT-1
CLERKS OFFICE LVT-2 PNT-1, PNT-3
SC-1 PNT-1
PNT-6MECHANICAL SC-1 PNT-1
PNT-6MECHANICAL CHASE SC-1 PNT-1
PNT-6
CORRIDOR SC-1 PNT-1 PNT-6
OFFICE LVT-2 PNT-1, PNT-3 PNT-6
ELEC SC-1 PNT-1 PNT-6
LOUNGE RES-1 PNT-1, WC-1 PNT-6
RB-1
RB-1
RB-1
MECHANICAL CHASE SC-1 PNT-1 PNT-6
MECHANICAL CHASE SC-1 PNT-1 PNT-6
TYPICAL BATH T-1 T-2, T-3 PNT-6 1, 3
TYPICAL SLEEPING ROOM LVT-1 PNT-1, PNT-2 PNT-6 4
File details come from the government source that posted it. Updated .