This is Amendment 0001 to Solicitation N40085-26-R-9051, issued by NAVPAC Mid-Atlantic on August 6, 2026, for Building 1005 Water Line Repairs at Camp Lejeune, North Carolina. The amendment provides answers to five questions raised during the proposal phase and clarifies requirements in the original scope of work and drawings.
The amendment addresses critical clarifications regarding water line installation procedures, steam vault removal, material specifications, and site restoration. Key determinations include: existing water service must remain operational during working hours, requiring new line installation outside business hours; concrete headwalls approximately 8-10 inches thick must be cast in place on each side of excavation where it crosses the steam vault/tunnel, with dowels into existing walls to prevent backfill collapse, and coring and sleeving are not preferred methods; the abandoned steam line will remain in place with the new water line installed in its location and backfilled, eliminating thermal concerns for PVC piping; and any crape myrtle trees damaged or removed during construction must be replaced in the same location with the same species. The time and date for receipt of proposals remains unchanged, and all other terms and conditions of the original solicitation remain in full force and effect. Contractors must acknowledge receipt of this amendment when submitting proposals to avoid rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008526B0003 Dwgs_Signed.pdf | ||
| 26-0003 SOW.pdf | ||
| N4008526B0003 Specs.pdf | ||
| 26-0003 DM dated 1.7.2026.pdf | ||
| RFP 1005 Water Line Repairs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
N40085-26-R-9051 Amendment 0001
CONTINUATION SHEET
1. QUESTION: Referencing the Detail Requirements in the scope of work and the drawings:
Item #2 and #7 contradict each other. We assume Item #2 supersedes Item #7 as there's no room to install a second line next to building 1005 without being in conflict of the steam vault.
ANSWER: The building cannot be left without water during working hours, so if the existing water line must be taken out of service in order to install the new one, this must be done completely outside of working hours.
2. QUESTION: Can a detail be provided for Item #10? Are the bulkheads for the penetration through the existing tunnel wall? Or is it transverse across the tunnel? If it's for the tunnel wall penetration can coring and sleeving be done instead?
ANSWER: All this is doing is removing the steam vault/tunnel and its contents in the trench area. You’ll need to pour a cast-in-place concrete headwall approx. 8-10” thick on each side of the excavation where it crosses the steam vault/tunnel. Dowel it into the existing walls as noted in the SOW. This is to keep the backfill from collapsing into the steam vault/tunnel. Coring and sleeving is not preferred.
3. QUESTION: Due to the proximity of the PVC water pipe to the steam piping in the tunnel, there is a potential for pvc deformation over time from the heat. Cherry Point has experienced several issues over the years. We recommend sleeving the waterline in the tunnel or using ductile iron to mitigate the thermal exposure. Please advise.
ANSWER: The steam line is not active; it is abandoned in place as is all the steam on MCBCL.
This project will remove a segment of that abandoned steam system to place the new water line and backfill it. The pipe will be completely under fill material. The remaining abandoned steam trench will continue on either side of the excavation and headwalls to be constructed to contain the fill material from collapsing into the trench during backfill.
4. QUESTION: There are several crape myrtles next to b1005 that will have to be removed in order to replace the water line. Scope of Work said to provide sod on all disturbed areas. Please confirm the tree replacement will not be required.
ANSWER: If the trees are damaged/removed, they must be replaced in the same location with the same species.
5. All other terms and conditions remain unchanged.
| Sample Amendment SF30 |
| Untitled |
| Untitled |
Sample SF30 Continuation Sheet
| IDCode: |
| Page: 1 |
| Pages: 2 |
| AmendNo: AMENDMENT NO. 0001 |
| EffDate: 8/6/26 |
| ReqNo: |
| ProjNo: 26-0003 |
| IssCode: N40085 |
| IssuedBy: NAVFAC Mid-Atlantic |
Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
| AdmCode: |
| AdminBy: See Item 6 |
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolChgYs: Yes |
| SolChgNo: Off |
| SolAmdNo: N40085-26-R-9051 |
| AmendDate: 7/9/26 |
| ModNo: |
| ModDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: 26-0003, Building 1005 Water Line Repairs |
Amendment 0001, Answer Requests for information
The time and date for receipt of proposals remains unchanged.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.